ML20002B500
| ML20002B500 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/28/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20002B501 | List: |
| References | |
| NUDOCS 8012110701 | |
| Download: ML20002B500 (2) | |
See also: IR 05000364/1980038
Text
f
,
a
f Kt%q
q l70
f
8
je
UNITED STATES
o
g
,
[
NUCLEAR REGULATORY COMMISSION
- i
,
g
2
,
.r
REGION 11
._ -
' 'Q-l
"
-g
g
f
101 MARIETTA ST., N.W.. sulTE 3100
~'{
~-
{j;4
-
j'
ATLANTA, GEORGIA 3o3o3
' 'y
_A
,
.....
<
-
~-
OCT 2 81980
i,
3;
m
m
m
In Reply Refer To:
'J'
RII4WPA-~
w
d O-364/80- U
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by W. P. Ang of this office on September 15
through 17, 1980 of activities authorized by NRC Construction Permit No. CPPR-86
for the Farley facility, and to the discussion of our findings held with J. A.
Mooney at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your evntractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you_have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,
l
C. E. Murphy,
ref
i
Reactor Construction and Engineering
'
Support Branch
l
Enclosure:
See Page 2
80121_1 o]Ol
Q
.
.
.
.- . - - - - . -
.
..
~
.
.
.. .
.-.
.
OCT 2 81980
g
Alabama Power Company
-2-
Enclosure:
Inspection Report No. 50-364/80-38
cc w/ encl:
A. R. Barton, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
W. G. Hairston, III, Plant Manager
R. E. Hollands, Jr., QA Supervisor
O. D. Kingsley, Jr. , Manager, Nuclear Engineering
and Technical Services