Forwards IE Insp Rept 50-364/80-38 on 800915-17.No Noncompliance Noted
ML20002B500
Person / Time
Site: Farley 
Issue date: 10/28/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20002B501 List:
References
NUDOCS 8012110701
Download: ML20002B500 (2)


See also: IR 05000364/1980038

Text

f

,

a

f Kt%q

q l70

f

8

je

UNITED STATES

o

g

,

[

NUCLEAR REGULATORY COMMISSION

i

,

g

2

,

.r

REGION 11

._ -

' 'Q-l

"

-g

g

f

101 MARIETTA ST., N.W.. sulTE 3100

~'{

~-

{j;4

-

j'

ATLANTA, GEORGIA 3o3o3

' 'y

_A

,

.....

<

-

~-

OCT 2 81980

i,

3;

m

m

m

In Reply Refer To:

'J'

RII4WPA-~

w

d O-364/80- U

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. P. Ang of this office on September 15

through 17, 1980 of activities authorized by NRC Construction Permit No. CPPR-86

for the Farley facility, and to the discussion of our findings held with J. A.

Mooney at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your evntractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you_have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,

l

C. E. Murphy,

ref

i

Reactor Construction and Engineering

'

Support Branch

l

Enclosure:

See Page 2

80121_1 o]Ol

Q

.

.

.

.- . - - - - . -

.

..

~

.

.

.. .

.-.

.

OCT 2 81980

g

Alabama Power Company

-2-

Enclosure:

Inspection Report No. 50-364/80-38

cc w/ encl:

A. R. Barton, Executive Vice President

H. O. Thrash, Manager, Nuclear Generation

F. L. Clayton, Jr., Senior Vice President

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

W. G. Hairston, III, Plant Manager

R. E. Hollands, Jr., QA Supervisor

O. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

i