ML20002B456

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/80-29 & 50-364/80-41 on 800901-30.No Noncompliance Noted
ML20002B456
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/03/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20002B457 List:
References
NUDOCS 8012110614
Download: ML20002B456 (2)


See also: IR 05000348/1980029

Text

e

[# Kicoq'o

.

UNITED STATES

f

[" )y

g

~

NUCLEAR REGULATORY COMMISSION

c

REGION 11

t

g

#

o,

tol MARIETTA sT.. N.W.. SUtTE 310o

ATLANTA, GEORGIA 3o3o3

Q

NOV 0 31980

$

>

In Reply Refer To:

N

5

RI_I WHB

.o

y

5~0-348/80-29 N

,3

40-3_64L80-41

7

sg

-

"

55

-

..

.-

b

3c-

Alabama Power Company

j

N

ATTN:

R. P. Mcdonald

<5

68

33

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W.

H. Bradford of this office on

September 1 through September 30, 1980 of activities authorized by NRC License

No. NPF-2 and Construction Permit No. CPPR-86 for the Farley facility, and to

the discussion of our findings held with W. G. Hairston at the conclusion of the

irspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary info'-

rmation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be place I in the Public Document Room,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

'

Sincerely,

.C.

. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

See Page 2

8012110614

>A

L

.

.

.

-

.

.

.

.

Alabama Power Company

-2-

, ,

DV 0 3 G80

Enclosure:

1.ispection Report Nos. 50-348/80-29

and 50-364/80-41

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

O. D. Kingsley, Jr. , Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager -0perations

Quality Assurance

W. G. Hairston, III, Plant Manager

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

,

R. E. Hollands, Jr., QA Supervisor

,

4

.

g wy

w

'g+94

s

g

.

y

evh,.+---99..

w.

ec

g -

we9#,y

g

9%

-

4-+a

,-

g,

,.p."W

y

"

?

tt"%"

'*'

' ' " '

7

  • -

'"W

"

7

-