ML20002B187

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-440/80-20 & 50-441/80-18 on 800917-19 & Notice of Violation
ML20002B187
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/21/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20002B188 List:
References
NUDOCS 8012110041
Download: ML20002B187 (2)


See also: IR 05000440/1980020

Text

- - .

-

-

-,

.[

k

UNITED STATES

'

[l{

!~

%.

NUCLEAR REGULATORY COMMISSION

l

$

I

REGION lil

8

j.

~o,

7se ROOSEVELT ROAD

g . . . p*ca

GLEN ELLYN. lLLINOIS 40137

,

$

.

,

gE

{

OCT 21 080

e

,

gd

e g:

my

q

me .

,

V

,utsx

cy-

$DockeQFo.50-440-

'jDocke

o. 50-441

~

The Cleveland Electric Illuminating

. Company

,

ATTN: Dalwyn R. Davidson

Vice President - System

I-

Engineering and Construction

Post Office Box 5000

l

Cleveland, OH 44101

!

~ Gentlemen:

This refers to the inspection conducted by Mr. R. B. Landsman of this

office on September 17-19, 1980, of activities at the Perry Nuclear Plant

'

Project, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148

and No. CPPR-149 and to the discussion of our findings with Mr. M. R. Edelman

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

,

i

the inspection. Within these areas, the inspection consisted of a selective

'

examination of procedures and representative records, observations, and

interviews with personnel.

l

During this inspection, 'certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this. office within thirty days of

your receipt of this notice a written statement or explanation in reply,

~ including for each item of noncompliance:

(1) corrective action taken and

the results achieved; (2) corrective action to be taken to avoid further

noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your response to this letter will be placed in the NRC's Public Document-

Room, except as follows. .If.the enclosures contain information that you or

,

l

i

[-

l

soleno OM

[5

,

,

.

,

OCT 21 W

  • '

Cle$elandElectric' Illuminating

-2-

Company

you'r contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must.in:1ude a full

statement of the reasons for which the information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an. enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

9

.v G. Fiore111, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

of Violation

-2.

IE Inspection Report

No. 50-440/80-20 and

No. 50-441/80-18

cc w/ encl:

Central Files

Reproduction Unit NRC 20b

PDR

.

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Mr. Daniel D. Wilt, Attorney

Helen W. Evans, State of Ohio