Text

3 *'04

UNITED STATES

/

h

f

%

NUCLEAR REGULATORY COMMISSION

y!% i

h

t

REGloN til

7

[

g

,

7ss noosevELT ROAD

ctra ettvu. itusois saia7

- >

y

> ^* " * :

OCT 2 3 G80

a

a

g"

c2

W

P

.

.

O

Docket No. 50-461

Illinois Power Company

ATTN:

Mr. W. C. Gerstner

Executive Vice President

500 South 27th Street

Decatur, IL 62525

Gentlemen:

This refers to the routine inspection conducted by Messrs. U. J. Ney and

J. Schapker of this office on October 6-8, 1980, of activities at

Clinton Nuclear Power Station authorized by NRC Constructicn Permit No.

CPPR-137 and to the discussion of our findings with Mr. J. O. McHood and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in

noncompliance with NRC requirements, as described in the enclosed

Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office within

thirty days of your receipt of this notice a written statement or expla-

nation in reply, including for each item of noncompliance: (1) correc-

tive action taken and the results achieved; (2) corrective action to be

taken to avoid further noncompliance; and (3) the date when full com-

pliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follous.

If the enclosures contain

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

in an enclosure to the application.

8012210 0%

h

.

Illinois Power Company

-2-

OCT 2 31980

We will gladly discuss any questions you have concerning this inspec-

tion.

-

Sincerely,

C Wuf ' <-

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure: IE Inspection

Report No. 50-461/80-21

cc w/ encl:

Central Files

Reproduction Unit NRC 205

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

Mr. Gary N. Wright, Chief

Division of Nuclear Safety