Text
[/L
[e an
.
4
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
i
- r
REGION 11
'*
RCiW COOI
101 MARIETTA sT., N.W., SUITE 3100
'#
o,
St.WACESUNII
ATLANTA, GEORGIA 30303
g.....
-
OCT 2 31980
In Reply Refe@NOV 28 In 9 04
RII:JRH ~
~
50'424/80-T4 ~
! [50-425/8014-
ts HRC
'
g;MUitCN SERVICES
-
nRANCH
Georgia Power Company
ATTN:
J. H. Miller, Jr.
t
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
l
Gentlemen:
This refers to the inspection conducted by J. R. Harris of this office on
September 15-18,.1980, of activities authorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109 for the Vogtle facility, and to the discussion of our
l
findings held with H. H. Gregory, III at the conclusion of the inspectiva.
!
Areas examined during the inspection and our findings are discussed in the
l
enclosed inspection
aport.
Within these areas, the inspection consisted of
.
j
selective examinations of procedures and representative records, interviews with
i
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
!
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
l
in the enclosed report.
!
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
l
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
I
inspection report will be placed in the NRC's Public Document Room.
If this
l
report contains any information that you (or your contractor) baieve to be
i
proprietary, it is necessary that you make a written application within 20 days
'
to this office to withhold such information from public disclosure. Any such
application must include a - full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
l
separate part of the document. If we do not hear from you in this regard within
!
the specified period, the report will be placed in the Public Document Room.
l
Should you have any questions concerning this letter, we will be glad to discuss
'
them with you.
Sincerely,
[
.
C. E. Murphy, Chief " ~
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
TO 12090 M[
p
-
r .T 2 31980
s
Georgia Power Company
-2-
4
Enclosure:
Inspection Report Nos. 50-424/80-14
and 50-425/80-14
cc w/ encl:
K. M. Gillespie, Construction
Project Manager
E. D. Groover, QA Site Supervisor
D. E. Dutton, Project General Manager
e
!3
%
.