Forwards IE Insp Repts 50-321/80-40 & 50-366/80-40 on 800924-25.No Noncompliance Noted
ML20002B139
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/22/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20002B140 List:
References
NUDOCS 8012090513
Download: ML20002B139 (2)


See also: IR 05000321/1980040

Text

f

. .

-

1

p.W** p.

.

e asa

o

UNITED STATES

g

,8

JgLEAR REGULATORY COMMISSION

o

g ^13

Q

  • *gsh3 g

REGION 11

t

.r.-

'

101 MARIETTA ST N.W sulTE 3100

%**"'o

ATLANTA, GEORGIA 30303

g 94 9 03

0CT 221o80

In Reply RefeMNb

RII:LDZ --~._

50-321/80-40

m ccg3

50-366/80-40 M y U ]

.

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by L. D. Zajac of this office on September 24

through 25, 1980 of activities authorized by NRC Operating License No. DPR-57 and

License No. NPF-5 for the Hatch facility, and to the discussion of our findings held

with T. Greene at the conclusion of the inspection.

Areas examined during the inspection and our findings are discusse/. in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any info;mation that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate part of the

,

'

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

,

8012090

5/3

i

.-..-

.

- ,

.)

?-

.

OCT 2 21980

.g

Georgia Power Company

-2-

.i

Should you have any_ questions concerning this letter, we will be glad to discuss

them with you.

~

Sincerely,

'C.

E. Mur y , G.

Reactor Constru a.on and Engineering

'

Support Branch

Enclosure:

Inspection Report Nos. 50-321/80-40

and 50-366/80-40

,

cc w/ enc 1:

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

'

W. A. Widner, Vice President and

General Manager-Nuclear Generation