ML20002B139
| ML20002B139 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/22/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20002B140 | List: |
| References | |
| NUDOCS 8012090513 | |
| Download: ML20002B139 (2) | |
See also: IR 05000321/1980040
Text
f
. .
-
1
p.W** p.
.
e asa
o
UNITED STATES
g
,8
JgLEAR REGULATORY COMMISSION
o
g ^13
Q
- *gsh3 g
REGION 11
t
.r.-
'
101 MARIETTA ST N.W sulTE 3100
%**"'o
ATLANTA, GEORGIA 30303
g 94 9 03
0CT 221o80
In Reply RefeMNb
RII:LDZ --~._
50-321/80-40
m ccg3
50-366/80-40 M y U ]
.
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by L. D. Zajac of this office on September 24
through 25, 1980 of activities authorized by NRC Operating License No. DPR-57 and
License No. NPF-5 for the Hatch facility, and to the discussion of our findings held
with T. Greene at the conclusion of the inspection.
Areas examined during the inspection and our findings are discusse/. in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any info;mation that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary infor-
nation identified in the application is contained in a separate part of the
,
'
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
,
8012090
5/3
i
.-..-
.
- ,
.)
?-
.
OCT 2 21980
- .g
Georgia Power Company
-2-
.i
Should you have any_ questions concerning this letter, we will be glad to discuss
them with you.
~
Sincerely,
'C.
E. Mur y , G.
Reactor Constru a.on and Engineering
'
Support Branch
Enclosure:
Inspection Report Nos. 50-321/80-40
and 50-366/80-40
,
cc w/ enc 1:
M. Manry, Plant Manager
C. E. Belflower, Site QA Supervisor
- '
W. A. Widner, Vice President and
General Manager-Nuclear Generation
8
,
i
i
?
4
-e.
-
-
-v.--
,m.im-,
, +, - - - , - - - , -