Text
.g(
SOUTH CAR 0tlNA ELECTRIC a GAS COMPANY POST OF FICE BOW 79-CotuMeA, SouTx CARottNA 29218 T. C. NicMots, JR.
December 2, 1980 VICE Petsiocar ano Gnovo Carcema N904 f As Ort =4rio s Mr. Harold R. Denton, Director Offi,ce of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555
{
Subject:
Virgii. C. Summer Nuclear Station Docket No. 50/395 Equipment Qualification - Seismic
Dear Mr. Denton:
Recently Mr. Bill Kane requested South Carolina Electric and Gas Company previde information regarding Westinghouse topical reports pre-seated in the seismic qualification tests of safety related electrical equipment. Specifically, the information was in regard to items 1 through 5 on page 12 of an 8/26/76 letter from Mr. J. P. Knight to Mr. R. C. DeYourg. A copy of pages 11 and 12 of that letter are attached.
Our responses as follows:
e 1.
The Virgil C. Su mer Nuclear Station constructi,n permit application was docketed prior to October 1972.
2.
WCAPs 8848(P) aad 8849(NP), 8830(p) and 8831(NP), 8828(P) and 8829(NP) have been completed and formally submitted to the NRC by Westinghouse.
3.
Concur - No action required by SCEEG.
4.
The final version of WCAP 8830(P) addresses the structural "N
O capability of the NIS rack.
(
E:3 5.
Eagle Signal Timers are not used by Westinghouse. Reference
%l letters NS-CE-692 dated 7/10/75, NS-CE-1472 dated 6/4/77 and-i c' NS-TMA-2059 dated 5/14/79.
f;':.:
F If you require additional information, please let us know.
c.>
Very truly yours,
./
/
T. C. Nichols, Jr.
RBC:TCN:rh cc: Page Two L
8012000 230 t
4 Mr. Harold R. Denton December 2, 1980 Page Two cc:
V. C. Sumrer G. H. Fischer T. C. Nichols., Jr.
E. H. Crews, J..
O. W. Dixon, Jr.
R. B. Clary W. A. Williams, Jr.
O. S. Bradham D. A. Nauman A. R. Koon B. A. Bursey J. L. Skolds J. B. Knotts, Jr.
NPCF/Whitaker File
~
/
_ 11 _
WCAP-8624 (P), WCAP-8695 (NP), and Draf t-3 (P), " Development of Required Test Inputs and Sucmary of Test Input Results for WCID-7300 Bistable Test", July 1976.
We ME3 has cocpleted its evaluation of this information.
find the retects to be acceptable.
Instrument Bus Distribution Panels - Retests were conducted f.
with sine-beat blaxial input for verifying operability under' directional coupling. effects. Infor=ation regarding retesting was documented in the previously mentioned, report WCAP-7821, Supplement 2, Add. 1.
ME3 has completed evaluation of this infor=ation. - We find that the retests are acceptable.
s IV.
CONCLUSIONS /WD REGUI ATORY POSITIONS The Mechar. cal Engineering Branch, Division of Systems Safety has tested completed the seismic audit of Westinghouse electrical equipment prior to May 1974. Eased on our evaluation of topical reports, inspections of equipment on the plant sites, numerous meeting discusaions, laboratory visits, and our evaluation of confirmatory retesting for equipment in question, we conclude that adequate assurance is achieved for these to sustain seissic excitations to their designated SSE levels.
equipment The following is a list of Westinghousa topical reports which present.a package of information regarding their effort in seismic qualification tests of safety related electrical equipment:
O e
,e e e em e.
e
,.e-,-
p
,'g
.* " c.
.... ? : :...,.l '. '._ : *. 4,,'j_..
P -. L.~ 9 'f l.. '
WCAP 7817 (NP)
WCAP-7821 (NP)
WCAP-7558 (tm)
WCAP-8373 (NP)
- WCAP-8234-A (NP)
WCAP-8673 (P) and WCAP-8674 (NP) j
. WCAP-8694 (P) and WCAP-8655 (NP)
.WCAP-8624 (P)'and'WCAP-8695 (NP)
Draf t 1 (P) WCAP EbVf ff) & IUCAA [V'M (/JP Draf t - 2 (P) V/[AA,[f30 (f) 04k WCAA M l 0 bE.7 W
Draft - 3 (P)
The topical reports listed above are acceptable for reference only if the following conditions are met:
4 1.
The listed topical reports are only applicable for plants having con-
~
struct' ion permit application docketed priorf:stober 1972. _
f,!
i
'j jgg,,
, '2. ' All listed non-proprietary topical reports shall be referenced as a group
/
(f re.
y car,uf-/,'..3
[
and every topical report ~shall have its non-proprietary version properly I
'"E I 2 documented. Three of the above have not been completed.
if3k.ll N
3.
Electrical performance during and af ter the test or retest shall be J
^
e i acceptable to the evaluation o. Electrical Instrumentation and Control 1
Syste=s Branch.
/"4.
The' structural' capability of the NIS rack should be reassessed as
.i.dicated in III(D)(3)(c) ~1n the final version of report Draf t - 2 (P).
5.
Justification' for Eagle Signal Timer shall be ' ovided as indicated in -
- - p.
III -(D) (2) (a) j j
m.
.....c
.. = z..
. _e
. - _ -., -. -. ~ ~. -
+--
.s
\\-
. f-
.,r.
4
,~v
,e.
-r
,-.m.,.,r.
v
-r.y
,..-v,
-.