Ack Receipt of Requesting Further Partial Rescission of 790815 Order.Authorizes Firms to Commence Receipt Insp in Contracted Disciplines
ML20002A862
Person / Time
Site: Marble Hill
Issue date: 11/13/1980
From: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20002A863 List:
References
NUDOCS 8011210741
Download: ML20002A862 (5)


Text

_._

w

~

-r g n._.. e... -wu ru u 5 CuA 3E QQ 3 Docket Nos. 50-546 50-547

.<a Public Service Company of Indiana i3 ATTN: Mr. S. W. Shields 2

Sr. Vice President - Nuclear Division N

y P. O. Box 190 W

2 Gentlemen:

h

.Ej New Washington, Indiana 47162 s

-e h

My letter to you dated May 15, 1980 enclosed the " Graduated Rescission of Order dated August 15, 1979" and the guidelines (in the Appendix to the Graduated Rescission) for a controlled, stepwise resumption of activities at the Marble Hill site when certain prerequisites have been met.

I have received your letter dated November 7,1980 requesting further partial rescission of the Order dated August 15, 1979 in accordance with the guide-lines referenced above.

Specifically you stated that those activities of Public Service Company of Indiana, Inc. (PSI) and of two firms under contract (Cherne Contracting Corporation and Commonwealth-Lord J.V.) necessary to authorize resumption of receipt inspections by these firms had been completed.

You requested written permission as required by Section B.8 of the referenced guidelines to allow resumption of receipt inspections by these two contractors.

Pursuant to the NRC hold point in item B.7 of the Restart Program, NRC inspectors have inspected adjustments which satisfy items B.5 and B.6 of the Restart Program as they apply to receipt inspection activities by Cherne Contracting Corporation (CCC) and Commonwealth-Lord J.V. (C-LJV).

Based upon the inspection findings by Region III, which confirm the informa-tion reported in your November 7,1980 letter, I have concluded that the prerequisites necessary for resumption of receipt inspection by the 'two firms, CCC and C-LJV, have been completed satisfactorily.

Accordingly, PSI is authorized to allow these two firms to commence receipt inspections in the specific disciplines for which they are contracted.

This authoriza-tion is consistent with Paragraph B.8 of the Appendix to the Graduated Rescission of Order dated August 15, 1979.

Sincerely,

" Origi::21 = ; -.si Sf 71stc; 5tella Victor Stello, Jr.

Director 7

/

Office of Inspection m

4 e,%

and Enforcement f

l Enclosure-See next page WPU:JD RRRI:IE 0:EEEI:IE EI ELD 00:IE D:I 11/13/80 EBBlackwood JHSniezek DThompson JMurray RCDeYoung VS o

Job C(2) 11/ /80 11/. /80 11/ /80 11/ /6u 11/ /80 80 11/ /80 EBB 2 f(

--,7

~

NOV 181988 Public Service Company of Indiana.

Enclosure:

Restart Program (Appendix to the Graduated Rescission)

Distribution:

Chairman Ahearne Commissioner Gilinsky Commissioner Hendrie Commissioner Bradford W. J. Ofrcks, EDO H. R. Denton, NRR H. K. Shapar ELD J. P. Murray, ELD J. Cook, MPA R. C. DeYoung, IE J. H. Sniezek, IE 4

E. L. Jordan, IE E. B. Blackwood, IE J. B. Henderson, IE

^

R. E. Shewmaker. IE J. N. Wilson, NRR J. P. Keppler, RIII G. Fiorelli, RIII OPE OGC SECY OCA PDR (50-546-/547)

LPDR (50-546/547)

EDO Reading IE Reading Central Files IE Files (50-546/547) 1 1

1

APPENDIX RESTART PROGRAM FOR MARBLE HILL UNITS 1&2 WITH NRC HOLD POINTS At each point in this schedule identified as an NRC hold point, NRC will conduct a special inspection or series of inspections to review the ap-prLiriate procedures and practices for the particular operation.

If the NRL determines that the licensee has met satisfactorily all the necessary requirements, a letter of approval will be written by the Director of the Office of Inspection and Enforcement (IE) to the licensee to state that the matter has been resolved satisfactorily and to confirm the types of activities which may be restarted.

A.

Revised QA Program 1.

Public Service of Indiana (PSI) will accomplish the following actions before any new safety related construction can occur:

(a) Respond to the specific concerns expressed in the Office of Nuclear Reactor Regulation's April 1,1980 and April 28, 1980 questions relative to the upgrading of the quality assurance program and provide a Consolidated Quality Assurance Program description that includes the licensee's res onses.

s (b) Develop a Project Quality Assurance Manual (PQAM).

(c) Develop an ASME Quality Assurance Manual (AQAM).

(d) Increase project staff experience levels in accordance with the licensee's submittal dated February 28, 1980, 2.

NRC HOLD POINT:

NRC will review the adequacy of items b, e and d above, and if the adequacy is c.onfirmed, the Director of IE will issue a written statement to that effect to PSI.

B.

Receipt Inspection 1.

PSI will develop project management and other related procedures and will qualify its staff for receipt inspection.

2.

NRC HOLD POINT:

NRC will review PSI's program, procedures, and staffing for receipt inspection.

3.

If the results of the NRC's review are satisfactory, PSI may resume receipt inspection upon written notification from the Director of IE.

'h

4

. 4.

PSI will start receipt inspection and retain administrative custody of the equipment and materials.

5.

Each contractor will make adjustments as necessary to its QA program, procedures, and staffing for receipt inspection activities.

6.

PSI management will review and approve the above adjustments for receipt inspection for each contractor as required by planned activities and inform the Director of NRC Region III in writing of the adjustments.

7.

NRC HOLD POINT:

NRC will review the adequacy of the adjustments noted in item B.5 and B.6.

8.

If the results of the NRC's review are satisfactory, contractors within the subject discipline may start receipt inspection, and storage and maintenance of PSI equipment and materials upon written notification from the Director of IE.

The four main disciplines are:

Civil / Structural; Mechanical; Electrical; and Piping.

C.

Material Verification Program - Currently in progress and inay be accomplished in parallel with Receipt Inspection.

4 1.

PSI will complete appropriate project management and-special process procedures and conduct a Material Verification Program for all disciplines.

2.

PSI management will review and approve the Material Verifica-tion Program results and inform the Director of NRC Region III in writing of the results.

3.

NRC HOLD POINT:

NRC will review the material verification efforts of PSI and confirm adequacy of the program in each discipline.

D.

Construction Verification Program - Currently in progress and may be accomplished in parallel with Receipt Inspection.

1.

PSI will cotplete appropriate project management procedures, special process procedures and conduct a Construction Verifica-

- tion Program.

2.

PSI management will review and approve the Construction Verifi-cation Program results and inform the Director of NRC Region III in writing of the results.

i

.+

. 3.

NRC HOLD POINT:

The NRC will review the construction verification efforts of PSI and confirm the adequacy of the program in each discipline.

E.

Resumption of Construction 1.

NRC HOLD POINT:

NRC will review PST's program and its implementation as discussed in B, C, and D above for all disciplines.

If the adequacy is confirmed, the Director of IE will issue written notifica-tion te proceed as described in Item 2 below.

2.

Contractors' Program Adjustments-a.

Each contractor will adjust its QA program, procedures, and staffing to be consistent with PQAM, AQAM, and other PSI pro-gram requirements for each discipline.

b.

PSI management will review and approve the above adjustments for each discipline and inform the Director of NRC Region III in writing of the adjustments.

3.

NRC HOLD POINT:

The NRC will review the program adjustments for a particular discipline and the Director of IE will provide written notification that construction activities in a particular discipline may proceed in whole or in part if the adjustments are acceptable.

(

.