M
UNITED STATES
O/h.Ae
'
~uc-
-u-
m-ssm~
f
fj
nEcion i
e
g
$31 P Ann AVENUE
-S
[
MING OF peuSSI A P(NNSYt.V AN6 A 19408
%,
SEP ic :D
DocketYo'..#
50-245
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operaticas
P.O. Box 270
Hartford, Connecticut 06101
Gentlemen:
i
~
Reference: Your letter dated May 12, 1980 in response to our letter dated
April 17, 1980 which forwarded a copy of Investigation Report No. 50-245/30-02
l
.
'
We have reviewed your response in the subject letter ant find that additional
infomation is necessary for us to evaluate your ccmpliance with the require-
ments of Section 2.201 of the NRC " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Your response indicated that the Job Order System provides for the required
reviews and approvals and satisfies the requirements of 10 CFR 50, Appendix B.
'
The infornation which we examined during our investigation did not reveal that
procerly documen.ted, controlled and approved repair procedures were developed
'
in advance of the repair.
In addition, we did not find evidence of adequate
documentation of the corrective actions (repairs) which were actually perfomed.
j
Please provide infomation describing in detail how the requirements were
satisfied, including, as appropriate, any modifications or additions necessary
or made to directives, procedures, training, etc. to ensure requirements are
satisfied in the future.
Your response indicated that NNECo used the best engineering judgement available
to evaluate the integrity of the Isolation Condenser System. Your response also
'
indicated that the Engineering Staff has been sufficiently sensitized to preclude
The infomation which we obtained during our investigation indicated
recurrence.
that adequate effort was not made to obtain available infomaticn regarding the
1
conditions in the facility to fom the basis for good engineering judgement.
It
also is not apparent that.the transient effects of sensitizing individuals to
certain requirements will provide adequate long tem assurance of proper future
'
actions in the absence of appropriate directives and training.
Please provide
additional infomation regarding your actions to ensure adequate investigation
of future problems which may occur.
<
1
8011200
t//[
.
-
.
.
_
_
.
.
.
Northeast Nuclear Energy
Company
2
You are requested to provide the additional information discussed above to this
office within 20 days. You should also specify the date when full compliance
was or will be achieved. This additional response will be considered in deter-
mining whether any further action is necessary and appropriate.
Sincerely,
0
LN
ijqp [./ C/wv,/
f
- ,
/
Boyce H. Grier
Directo:-
cc:
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J.
R.' Himelwright, Licensing Safeguards Engineer
,