Second Interim Deficiency Rept Re 800701 Notification of Incomplete Documentation for Biological Shield Wall Insp. Bechtel Performed Ultrasonic Survey of Outer Shell to Base Plate Weld & Plate
ML20002A188
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/15/1980
From: Martin T
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20002A179 List:
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8011050119
Download: ML20002A188 (2)


Text

.

$.y .

()

Thoms: J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Vice Pres 4ent Engineering and Construction September 15, 1980 Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

BIOLOGICAL SHIELD 10CFR50.55(e), POTENTIAL SIGNIFICANT DEFICIENCY NO. 1 UNIT HOPE CREEK GENERATING STATION On July 1, 1980, a verbal report concerning a potential significant item was reported to Region 1, Office of Inspection and Enforcement representative, Mr. McGaughy.

It was reported that documentation pertaining to quality verifica-tion for the lower subassembly of the biological shield supplied by PX Engineering was found lacking inspection and NDE of several welds.

Supplemental information was submitted in writing to Region 1, Office of Inspection and Enforcement on August 7, 1980.

The following is a second interim report concerning incomplete documentation on the biological shield:

Bechtel Power Corporation Technical Specification 10855-C-139(Q) requires the outer shell to base plate weld and the plate in the area of the weld to be 100 percent examined by the ultrasonic method. Since the documentation does not verify the acceotability of the joint, the vendor has performed the required examination in the field. As a result of this examination, a number of minor weld deficiencies have been found and are being repaired. The examina-tion of documentation continues.

i 8011059 ,,

\sg * ,

Mr. B. H. Grier 9/15/80 The determination of corrective actions deemed necessary and the assessment of reports.bility in accordance with 10CFR50.55(e) is progressing and it is expected that a report will be made to the NRC by November 17, 1980.

Ver" truly yours, f.flyk CC: Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.C.