ML19354E712
| ML19354E712 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 01/23/1990 |
| From: | Knop R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shelton D TOLEDO EDISON CO. |
| Shared Package | |
| ML19354E713 | List: |
| References | |
| NUDOCS 9002010187 | |
| Download: ML19354E712 (2) | |
See also: IR 05000346/1989026
Text
-
y
a ;: t
8c i
_ on t r mi A nna s aim m a n- m q
j.
,,
v4 u s w v , n o , i,., s a se usuiu 6
m
,
-
'JAN 2 31990
Docket No. 50-346'
Toledo Edison Company
ATTN:
Mr. Donald C. Shelton
'Vice President
Nuclear.
"
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
q
i
Gentlemen:
'
This refers to_the routine safety inspection conducted;by Messrs. P. M. Byron,
~
1
D. C. Kosloff,:J. M. Ulie, and R. K. Walton of this office!on November 7 1989,.
.
7
through January 2,1990, of activities at- Davis-Desse ' Nuclear Power Statun
authorized by Facility Operating License No.-'NPF-3 and to the discussion of
our findings with Mr. L. Storz at the conclusion:of'the inspection.'
The enclosed copy of our inspection report identifies areas; examined during.
the inspection. Within these areas, the-inspection consisted of- a selective
y
examination of procedures and representative records,1 observations, and
{
interviews with personnel.
During this inspection, certain of your activities appearsd-to be in-violation
i
of NRC requirements, as specified'in the enclosed Notice.-- A~ written response
is required.
With regard to the violation discussed in Attachments.1 and 2
,
to this report, the inspection showed that actions.have been taken to correct
l
-
the identified violation and to prevent recurrence.
Consequently, no reply .to
this violation is required and we have no further questions regarding;this
matter at this time.
In accordance with 10 CFR 2.790 of the Commission's~ regulations,.a copy of
this letter, the enclosures, and your response to' this' letter will:be.placed i_n
the NRC Public Document Room.
In addition, 'another area examined during this
j
inspection concerns a subject matter which is~ exempt from disclosure'according;
j
to Part 73, Title 10, Code of Federal Regulations,: Section 73.21(c)(2).
This
Li
information must be handled end protected in accordance with the provisions of'
i
Consequently, Attachments 1 and 2 to this report willicot be
1
placed in the NRC Public Document Room,
i
i
The responses directed by this letter and the accompanying' Notices are not subject
!
to the clearance procedures of the Office of Management and. Budget as requi_ red by
n i
the Paperwork Reduction Act of 1980, PL-96-511.
~
u
I
1
i
. - ~ y ~tutt-
M
!
o ac.n , , w
,
vn, m . ,. . _ .
. u viuvin i
.
,
$
.
. . - .,
. -
i
--
OArrn'eannn
spr AnMC'n
\\
,_
von Lu u, u m .
i
. . . . . .
.
. .
,
-
.
-,
,
Toledo Edison Company
2 ' AN 2 31330 '
J
,
We will gladly discuss any questions you have concerning' this inspection.
l
Sincerely,
fl
R. C. Knop, Chief
ReactorProjects-Brsnch3
Enclosures:
1.
-
2.
Inspection Report
. ,
No. 50-346/89026(DRP)
J
cc w/ enclosures:
L. Storz, Plant Manager
DCD/DCB (RIDS)
Licensing Fee Management Branch-
Resident Inspector, RIII
'
James W.- Harris, State of Ohio
Roger Suppes, Ohio
Department of Health
A, Grandjean, State of Ohio,
'
Public Utilities Commission
'l
t
.
'
t
i
.
.
k
4
'?
g
YO'
RIII
Rill
RIII
RII
RIII
RIII
t1 Y
%% 9pL
>
Dunlop/kjc
Ulle
d-
ger
Kn p . ,
, I W n < s n ' .+11 ${'l p
'
I-II '10
( i
,
,
_
gp , r n t,, ,,
.
~
l L. V V i u w v ii 41 VlilI AIII IUI1
I
.
%
,
, , , -
i