Forwards Safety Insp Rept 50-443/89-19 on 891128-1207.No Violations Noted.Number of Items Requiring Resolution Prior to Exceeding 5% Rate Power Identified.Response to Encl Requested within 30 Days
ML19354D996
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/09/1990
From: Knapp M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Ellen Brown
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML19354D997 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 9001250171
Download: ML19354D996 (3)


See also: IR 05000443/1989019

Text

Q-

  • >

I

.

JAN 0 91990

<

Docket No. 50-443

I

I

Public Service. Company of New Hampshire

j

ATTN: Mr. Edward A. Brown, President

and Chief Executive Officer

New Hampshire Yankee Division

,

Post Office Box 300

'

Seabrook, New Hampshire 03874

Gentlemen:

Subject: NRC Inspection Report No. 50-443/89-19

A special safety inspection of your post-accident sampling and monitoring

systems was conducted by NRC Region I staff members at the Seabrook Station

during the period November 28 - December 7,1989.

The findings of the

inspection were discussed with Mr. W. A. DiProfio. Areas examined during

the inspection and our inspection findings are discussed in the enclosed NRC

Inspection Report.

'

No violations were observed. However, a number of items requiring resolution

prior to exceeding five percent rated power were identified. These items are

listed in Enclosure 1 to this letter.

A number of items for improvement were

also identified. Your staff was very responsive to the inspection findings and

initiated immediate action to review and resolve all findings.

Detailed closecut

I

packages for these latter items were provided by your staff.

'

You are requested to review the items identified in Enclosure 1 and rerpond

within 30 days of the date of this letter on actions planned or taken in regard

to these items.

i

The responses requested by this letter are not subject to the clearance

procecares of the Office of Management and Budget as required by the Paperwork

i

Reduction Act of 1980, PL 96-511. Your cooperation with us in this matter is

appreciated.

Sincerely,

Original Signed By:

,

Mal:;olm R. Knapp ,

j

Malcolm R. Knapp, Director .

1

Division of Radiation Safety and

4

Sa feguards

I

\\

OFFICIAL RECORD COPY

50-443/89-19-0001.0.0,jf

l2 Q

I

h

h,

9001250171 900109

"

POR

ADOCK 05000443

o

PDC

i

.Il

,

o

Public Service Company of New

2

Hampshire

JAN 0 91993

Enclosures:

1.

Items Requiring Action Prior to Exceeding Five Percent Rated Power

2.

NRC Inspection Report No. $0-443/89-19

cc w/encls:

J. C. Duffett, President and Chief Executive Officer, PSNH

T. C. Feigenbaum, Senior Vice President ar.d Chief Operating Officer, NHY

J. M. Peschel, Operational Programs Manager, NHY

D. E. Moody, Station Manager, NHY

T. Harpster, Director of Licensing Services

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts

S. Woodhouse, legislative Assistant

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire, SLO

Commonwealth of Massachusetts, SLO Designee

Seabrook Hearing Service List

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

E. McCabe, DRP

J. Johnson, DRP

SRI - Seabrook (w/ concurrences)

V. Nerses, NRR

K. Abraham, PA0 (20) All Inspection Reports

l

l

RI:DRSS

RI

S

RI:DRSS

RI:DRSS

RI:DRSS

I

lj

Etan

P

e

B

1/1/90

AJ/9

1/4 /9

W/p/0

1/*( /90

RggS

RI:pS

RI

RA

RI:

Jbynr

Kn p

rtin

Russell

,

1/}/90

1/

90

1/f /90

1/ /90

0FFICIAL RECORD COPY

50-443/89-19 - 0002.0.0

01/05/90

A

.

-o

-

Enclosure 1

Items Requiring Action Prior to Exceeding

Five Percent of Rated power

1.

Establish backup post-accident particulate, iodine and noble gas monitoring

to meet Technical Specification 6.7.4.f... Accident Monitoring

Instrumentation.

(See Report Sections 5.3 and 6.3)

2.

Repair the heat trace for the containment atmosphere sampling line. '(See

Report Section 4.4.2)

3.

Provide documentation to justify a 65'F heat trace temperature for the

plant vent sampling line or increase the heat trace temperature to' prevent

condensation in the sample line.

(See Report Section 6.3)

4.

Provide training of appropriate personnel in the revised post-accident

sample collection, transport, and analysis procedures. Also, provide

training of appropriate personnel in design changes made.

(Action Item

neces ,itated by the need for licensee personnel to be trained in the

procedure revisions and design changes made in response to the inspection

findings; see Report Sections 4.4.2, 5.4, and 6.3).

The above four items will be reviewed prior to exceeding five percent of rated

power (50-443/89-19-01).