ML19354D830
| ML19354D830 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 01/12/1990 |
| From: | Warnick R Office of Nuclear Reactor Regulation |
| To: | William Cahill TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19354D831 | List: |
| References | |
| NUDOCS 9001220228 | |
| Download: ML19354D830 (5) | |
See also: IR 05000445/1989090
Text
=r
.
- , '
.
,
i
- 2 Q i
"
l1 $' t. ,
5
'
.
,
'
'
%*s
,
,
] . r*
'
,
-
-
,
,
V
'
m
,
E,
In-Reply Refer,To:
Jm 121990
-
Dockets:
50-445/89-90
-
-50-446/89-90-
1:
_
1
- TU Electric
.
.
. .
.
'
- ATTN:
W..'J.
Cahill, Jr., Executiv'e
W
Vice President, Nuclear
,
^
-Skyway, Tower
I
.
400 North- Olive, L.B. 81
{
"
Dallas,. Texas
75201
s
'
Gentlemen:'
1
This refersutorthe inspection' conducted by Mr. H. F. Bundy of this
'
~
'
office during the period December 18-26, 1989, of activities
authorized by NRC Construction Permits CPPR-126 and CPPR-127 for
9
Comanche Peak Steam Electric Station (CPSES), Units 1 and 2, and to
.
.the discussion of our findings with Mr. D. Deviney, and other
. members of your staff at the conclusion of the onsite inspection on
DecemberJ21, 1989.
<
The area examined'during the' inspection was your actions in response
toLGeneric Letter 88-17 to prevent and, if necessary, respond to
. loss of decay heat removal.
Within these areas, the inspection
(
-consisted'of selective examination of procedures and representative
,
records,Jinterviews with personnel, and obser'
,.'s by the
' inspector.. The' inspection findings are docun-
'n the enclosed
'
inspection: report.
.-Within the scope of the inspection, no violatio..a or deviations were
s
! identified.
However, there are three open items, identified in
paragraph 2 as 445/8990-01, 445/8990-02, and 445/8990-03, which you
should resolve prior to exceeding 5% power for Unit 1.
you should
also endeavor to complete the installation of the improvements
,
identified in Document 4 in the attachment to the inspection report:
. prior to operating at reduced inventory during the first refueling
s
outage,orather-than prior to the end of this first outage.
4
LShould you have any questions concerning this inspection, we will be
,
. pleased to discuss them with you.
Sincerely,
6
onicm71 CaGNED BY R. F. V7MICC
R. F. Warnick, Assistant Director
{
h. .$45
for Inspection Programs
..
12
Comanche Peak Project Division
g
Office of Nuclear Reactor Regulation
Enclosure:
(See next page)
~
AD:ChP
TPS:RIV
C: P
o
HBundy:lm
WSeidle
LJCallan
RWarnick
7
1/' /90
1/ fl 190
1/12./90
1/11/90
g
ch.ger were eli.reur.mt wifA reh Ph
. mL w% Cayen on
s m Bu % warn $n.TA
4.f add >Ycanenard yMN co esmn0
'Y
'
r%' ~tue
_
-
_
.
.
7 ['[ . . ~coey*(
.
a
j
UNITEO STATES
jy(*i
- >
E'
NUCLEAR REGULATORY COMMISSION.
,
-
, ?/
WASHINGTON, D. C. 20086 .
JAN I 21990
'
.
,
-In Reply ReferLTo -
Dockets: .50-445/89-90
50-446/89-90
"
~v
1
- TU Electric
ATTN: _ W.-- J. . Cahill, Jr. , Executive
,
Vice President, Nuclear
Skyway Tower
400 North Olive, L.B. 81
Dallas, Texas- 75201
-Gentlemen:
This. refers to the inspection conducted by Mr. H. F. Bundy of this
office during the period December 18-26, 1989, of activities
authorized by NRC. Construction Permits CPPR-126 and CPPR-127 for
Comanche Peak-Steam Electric Station (CPSES), Units 1 and-2, and to
"the discussion of our findings with Mr. D. Deviney, and other
members of your staff:at the conclusion of the onsite inspection'on
-
December. 21, 1989.
The area examined during the inspection was your actions in response
to Generic Letter 88-17 to prevent and, if necessary, respond to
loss'of decay heat removal.- Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the
inspector.. The inspection' findings are documented in the enclosed-
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
However,-there are three open items, identified in
paragraph 2 as 445/8990-01, 445/8990-02, and 445/8994-03, which you
should resolve prior to exceeding 5% power for Unit 1.
You should
also endeavor to complete the installation of the inprovements-
m
. identified in Document 4 in the attachment to the inspection report
"
priorito operating at reduced inventory during the first refueling
outage,~rather'than prior to the end of this first outage.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
R F WM
R. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
Office of Nuclear Reactor Regulation
l
Enclosures
(See next page)
.
__
..
- -.
. . .
..
.....,.,,.....u,,
.. j .... . ,. . .
_
- O .
<
.
9) ,.s
,x,
.
TU Electric'
-2-
M I2 M
,
Enclosure:
'
-Appendix:- NRC-Inspection Report
- 50-445/89-90 w/ attachment
50-446/89-90 w/ attachment
cc w/ enclosure:
..
TU Electric-
..
K
ATTN: Roger D. Walker, Manager,
Nuclear Licensing
iSkyway Tower
s
400 North Olive Street, L.B. 81
Dallas, TXL 75201
Juanita Ellis
President - CASE'
- 1426~ South Polk Street
Dallas, TX -75224
GDS Associates, Inc.
Suite 720.
1850 Parkway Place
- Marietta, GA 30067-8237
Billie Pirner Garde, Esq.
Robinson, Robinson, et. al.
103 East College Avenue
Appleton, WI-- 54911
.
'TU Electric-
f
- Bethesda Licensing
.
3 Metro Center, Suite 610
Bethesda, MD 20814'
Heron, Burchette, Ruckert, & Rothwell
ATTN: William A..Burchette, Esq.
Counsel' for Tex-La Electric
Cooperative of Texas-
1025 Thomas Jefferson St., N.W.
~ Washington, DC 20007
E..F. Ottney
r
P.O. Box 1777
' Glen Rose, TX 76043
Newman & Holtzinger, P.C.
ATTN: Jack R. Newman, Esq.
-1615 L. Street, N.W.
Suite 1000.
Washington,DC 20036
..___
/ :.. . r ,; .
'{J; ::
1.:
g
'
iTU Electric
-3-
E I2IE
,
-
' Honorable George Crump _
County Judge
. Glen Rose, TX 76043
- Texas Department of' Labor 8- Standards
- ATTN:
G. .R. Bynog, Program Manager /
'
-
Chief Inspector
- -Boiler Division
P.O. Box'12157, Capitol Station
-
-Austin, TX ~78711:
Texas Radiation Control. Program Director
1100 West 49th Street .
4
'
f(;N.A, ;. ;;, :;;.;
>
[, F '
T-
.y
.'
w
'
'
'*
'
'
}sy ) . - i,
n
I
,
y t. t .
< . -
-
,
,
i, -*
h,
150-445/89-90;L50-446/89.-90.
~
-
., DISTRIBUTION:-
.t
w emn.~,,-~mn,--,
.
,
>-
d
.
-
.
4,
,
NRC,PDR
'
LPDR
.CPPD-LA-
.CPPD Reading'(HQ)-
/ADSP . Reading
4
,
.* Site: Reading' File
,
--
- R. Warnick
'
- J.:Wiebe-'
.
h
-*H. Livermore
p ~.
- MIS: System,.RIV
'
- RSTS Operator, RIV
4
RPB, RIV.
I
'
- RIV-Files
'
J. Gilliland,.RIV
- L.
Shea,' ARM /LFMB-
C. I. Grimes
'J.-H. Wilson-
J. Lyons-
M. Malloy
.-J. Moore, OGC
,"
'M.
Fields.
D.-Crutchfield
'-
T. Quay
'
E. Jordan'
..
'
'B. Grimes-
-
-
.B.- Hayes
-
'C..Vandenburgh
,
-J.
Partlow:
- DRSS-FRPS,.RIV
,
- W.
Seidle, RIV
'
~*DRP,'RIV
'
. *R. Martin, RIV
t
'
- H.
Bundy, RIV
*W.
Johnson, RIV
- DRS
>
>
- w/766
l
- - -
-
-
- -
-
-
-
-
-
-
.