Forwards Insp Repts 50-424/89-31 & 50-425/89-36 on 891030-1103 & 1113-17 & Notice of Violation
ML19354D613
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/19/1989
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
GEORGIA POWER CO.
Shared Package
ML19354D614 List:
References
NUDOCS 8912280239
Download: ML19354D613 (4)


See also: IR 05000424/1989031

Text

1

r

c

I'

(

'* *

.

..

.

.

December 19, 1989

j

'

e

'

I

Docket Nos. 50-424. 50-425

License Nos. NPF-68. NPF-81

l

!

!

t'

Georgia Power Company

i

ATTN: Mr. W. G. Hairston, 111

!

Senior Vice President -

t

Nuclear Operations

I

P. O. Box 1295

Birmingham. At 35201

Gentlemen:

,

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-424/89-31 AND 50-425/89-36)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

S. G. Tingen on October 30 - November 3. 1989 and November 13 - 17, 1989, and

to the related telephone conference on November 17. 1989.

The inspection

included a review of activities autiorized for your Vogtle facility.

At the

conclusion of the inspection. the finiings were discussed with those members of

your staff identified in the enclosed Inspection Report,

d

Areas examined during the inspection are identified in the report.

Within

'

these areas. the inspection consisted of selective examinations of procedures

i

and representative records, interviews with perscnnel, and observation of

'

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC reQuiremonts.

The violation and references to pertinent requirements are

1

described in the enclosed Notice of Violation.

,

The enclosed Inspection Report documents an oral consnitment (see paragraph 4)

made by a licensee representative and discussed in the exit interview.

If your

,

understanding of this consnitment differs from the report statements, please

inform this office promptly.

On Ncvember 17, 1989, a telephone conference was conducted between Region 11.

NRp. Olant Vogtle. Plant Farley. Georgia Power Corporate and Alabama Power

Corporate personnel.

The topic of this conference was to discuss the

November 15. 1989, memorandum from R. C. Jones to D. B. Matthews concerning the

Vogtle (and Farley1 Interpretation of Technical Specification (TS1 3.4.4

. l.imiting Condition for Operation. Relief Valves and its applicability.

This

memorandum is enclosed as Enclosure 3.

Based on this conference it is our

understanding that Plants Vogtle and Farley conrnitted to conduct testing

of the power operated relief valves (those not previously tested) on

November 17. 1989.

On November 17. 1989, this testing was performed

satisfactorily.

8912280239 6:91219

PDR

ADOCK 05000424

)(

Q

PDC

Ltc

'

.

l-

.

,

Georgia Power Company

2

December 19, 1989

Enclosure 3 presents the NRR staff position that the satisfactory testing of

the automatic function of the relief valves is required to prove that these

relief valves are operable.

Since the corrective actions for this issue have been fully discussed and were

satisfactorily completed, a response to the Noti <,e of Violation is not

required.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2

Title 10 Code of Federal Regulations, a copy of this letter and its enclosures

wi'l be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Original Signed by

Ellis W. Merschoff for

Albert F. Gibson, Director

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

2.

NRC Inspection Report

3.

Menorandum from R. C. Jones to

D. B. Matthews

cc w/encis:

R. P. Mcdonald

Executive Vice President-Nuclear

Operations

Georgia Power Company

P. O. Box 1295

Birmingham, AL 35201

C. K. McCoy

Vice President-Nuclear

Georgia Power Company

,

!

P. O. 1295

Birmingham, AL 35201

G. Bockhold, Jr.

General Manager, Nuclear Operations

Georgia Power Company

l

P. O. 1600

l

Waynesboro, GA 30830

l

(cc w/encls cont'd - see page 3)

1

.

'

.

=

l-

r.

,.

.

)

Georgia Power Company

3

December 19, 1989

cc w/enci cont'd:

>

J. A. Bailey

l

Manager-Licensing

)

!

Georgia Power Company

'

P. O. Box 1295

Bimingham, AL 35201

]

B. W. Churchill

Esquire

'

Shaw, Pittman, Potts, and Trowbridge

1

2300 N Street NW

Washington, D. C.

20037

!

J. E. Joiner Esquire

Troutman, Sanders, Lockerman, and

',

Ashmore

1400 Candler Building

i

127 Peachtree Street, NE

Atlanta, GA 30303

D. Kirkland III, Counsel

Office of the Consumer's

Utility Council

Suite 225, 32 Peachtree Street, NE

Atlanta, GA 30302

Office of Planning and Budget

Room 615B

270 Washington Street, SW

Atlanta, GA 30334

Office of the County Consnissioner

Burke County Connission

Waynesboro, GA 30830

J. Leonard Ledbetter Director

Environ'nental Protection Division

Department of Natural Resources

205 Butler Street. SE, Suite 1252

Atlanta, GA 30334

Attorney General

Law Department

132 Judicial Building

Atlanta, GA 30334

State of Georgia

(bec w/encls - see page 4)

..

,

..

._- _ _

- _ _ _ .

. _ _ _ _ _ - - _ - - _ _ _ _ .

._-_ -

.:

,

_. ,

r

,.

.-

,

Georgia Power Company

4

December 19, 1989

"-

i,

bec w/ enc 1:

E. Reis. OGC

'J. Hopkins, NRR

K. Brockman, RII

M. Shymlock, RII

l

G. Belisle, RI!

S. Tingen RI!

S. Sparks, RII

~

Document Control Desk

-NRC Resident Inspector

U.S. Nuclear Regulatory Comission

P. 0. Box 572

Waynesboro, GA 30830

,

,

i

.

i;

,

o

RII:DRS

RII:DRS

RII: DSS

RII

S

RII:DRP

l

1Ab

]

STingen:gb

SSparks

GBefisle

CJ

n

"Sh;r'

MbNe

89

12/jg/89

12/I /89

12/I /89

12/,/89

12/j

i

Y

NW

i