Text
..
- o
50-445/ff-7/; 50-446/fY-7/
!
,
DISTRIBUTION:-
, , . , . . . . ~ . ~ -
-.w.-.
...
.- .
,
.DocketLFileE(50-445/446)z
l
NRC PDR
LPDR
,
'
CPPD-LA
CPPD Reading (HQ)
,
ADSP . Reading
-
- Site Reading File
- R. Warnick
- J. Wiebe
- H.
Livermore
t
- MIS System,-'RIV
.
- RSTS Operator, RIV
i
,
RPB, RIV
'
a
RIV Docket File
J. Gilliland, RIV
- L.
Shea, ARM /LFMB
'
C. I. Grimes
J. H. Wilson
a
J. Lyons
M. Malloy
J. Moore, OGC
M.' Fields
.D.
Crutchfield
T. Quay
.
'
E. Jordan
B. Grimes
B. Hayes
C. Vandenburgh
J. Partlow
- w/766
1
p
l
l'
l
l
i
J
1
i
!
1
89120B0030 891201
,
ADOCK 05000445
'
e
am
-
.
. .
- .. . .
.
.
p
-
-
-
. - -
-.
+
a
l 'f -
!
i
i
y
DEC - l 1939
1
<
,
L
In Reply Refer Tot-
)
t
Dockets:
50-445/89-71
l
50-446/89-71
j
Mr. W. J. Cahill, Jr.
'.
Executive'Vice President-
1
'
ll
TU Electric
<'
'400 North Olive Street, Lock Box 81
Dallas,-Texas
-75201
l
e
Dear Mr. Cahill:
)
This-refers.to *.he inspection' conducted by Mr. R. M. Latta and NRC
consultants,during the period October.4 through November 7, 1989, of
'
activities authorized by NRC Construction Permits CPPR-126 and.
CPPR-127 for the. Comanche Peak Steam Electric Station, Units'1
and-2, and to the discussion of our findings with you and. members of.
N youn staff at the conclusion of the inspection.
,
'
The enclosed copy of our inspection report identifies areas examined.
'during the inspection.. Within these areas, the inspection consisted
t
of selective examination of procedures.and. representative records,
interviews with personnel,.and observations by the inspectors.
During this inspection (. it was found thaticertain of your activities
were in violation of VRC requirements, as specified.in the enclosed
,
'A written response to these violations is
required.
l
In.acebrdance with 10 CFR 2.790 of the Commission's regulations, a
,
copy of this letter, the enclosures, and your response to this.
. letter will be placed in the NRC Public Document Room.
y
The responses directed by this letter and the accompanying Notice.
are not subject to the clearance procedures of the office.of-
Management and Budget as required by the Paporwork Reduction Act of-
l 1980, PL 96-511.
v
Rfk)
CPPD NRR
CPPD:NRR
AD:CPPD:NRR
RLatta:ww
HLivermo e
RWarnick-
12/ /
9
12/\\/8
12/I /89
g
m
5
<
e
-
,
4 v
.
DEC - 1 1939
.
'
W. J. Cahill, Jr.
-2-
- .'
Should you have any questions concerning this inspection, we will be
- pleased to discuss them with you.
Sincerely,
brijaniit sicNED BY n. r, Vit.rmCK
(
'
,
R. F. Warnick, Assistant Director
'
for Inspection Programs
Comanche Peak Project Division
'
Office of Nuclear Reactor Regulation.
l
Enclosures
Appendix A - Notice of Violation
Appendix B - Inspection Report 50-445/89-71; 50-446/89-71
"
cc w/enclosurest
See next page
..
i
.
h
!
!
,
1-
l
,
6:-
,w-
n.~n
.
.
.
.-.
. - - _. .
.-- _
. -.
. .
,
,
'#
?*
- E
UNITED STATES
NUOLEAR REGULATORY COMMISSION
4
E
WASHINGTON, D. C. 20666
\\...../)
!
i
.
ac -i 1989
1
1[n Reply Refer To:
-Dockets:
50-445/89-71
50-446/89-71
!
Mr. W. J. Cahill, Jr.
!
Eaecutive Vice President
!
.TU Electric-
,
400 North Olive Street, Lock Box 81
Dallas, Texas
75201
. ;
Dear Mr. Cahill:
This refers to the inspection conducted by Mr. R. M. Latta and NRC
consultants during the period October 4 through November 7, 1989, of
activities authorized by NRC Construction Permits CPPR-126 and
l
CPPR-127 for the Comanche Peak Steam Electric Station, Units 1
,
and 2, and to the discussion of our findings with you and members of
l
your staff at the conclusion of the inspection.
The enclosed copy of our inspection report-identifies areas examined
during the inspection.
Within these areas, the inspection consisted
of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspectors.
During this inspection, it was found that certain of your activities
were in violation of NRC requirements, as specified in the enclosed
A written response to these violations is
1
required.
>
In accordance with.10 CFR 2.790 of the Commission's regulations, a
!
copy of this letter, the enclosures, and your response to this
letter will be placed in the NRC Public Document Room.
i
The responses directed by this letter and the accompanying Notice
are not subject to the clearance procedures of the Office of
Management and Budget as required by the Paperwork Reduction Act of
.
1980, PL 96-511.
.
7-
, ,
.
~
, .
-.
.,,,,,...r,.,-,
, - - , - ,, - ,, , - ,
--,e--
..,.w-
.w--*
,
y,, - - , - - - , -
.
,o1, .
,
s
,
.
..-
"
W. J. Cahill, Jr.
-2-
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
RFW O
R. F. Warnick, Assistant Director
for Inspection Programs
Comanche Peak Project Division
office of Nuclear Reactor Regulation
Enclosures:
Appendix A - Notice of Violation
Appendix B - Inspection Report 50-445/89-71; 50-446/89-71
cc w/ enclosures:
See next page
!
.
-
1
.
-
-
~.
.
- - -
-
- - .
..
.--. -
.. - .
L
W. J. Cahill, Jr.
DEC - 1 EG9
L
cc w/ enclosure:
!
Roger D. Walker
TU Electric
'
Manager, Nuclear Licensing
c/o Bethesda Licensing
TU Electric
3 Metro Center, suite 610
Skyway Tower
Bethesda, Maryland
20814
-
400 North Olive Street, L.B. 81
Dallas, TX
75201
E. F. Ottney
i
P. O. Box 1777
Juanita Ellis
Glen Rose, Texas
76043
President - CASE
{
1426 South Polk Street
Jack R. Newman
'
Dallas, TX
75224
Newman & Holtzinger
1615 L Street, NW
Texas Radiation Control
Suite 1000
Program Director
20036
Texas Department of Health
1100 West 49th Street
George R. Bynog
78756
Program Mgr./ Chief Inspector
,
Texas Dept. of Labor & Standards.
GDS Associates, Inc.
Boiler Division
1850 Parkway Place, Suite 720
P.O. Box 12157, Capitol Station
Marietta, GA
30067-8237
78711
Honorable George Crump
County Judge
'
Glen Rose, Texas
76043
-
Ms. Billie Pirner Garde, Esq.
,
Robinson, Robinson, et al.
103 East College Avenue
Appleton, WI
54911
Regional Administrator, Region IV
i
U.S. Nuclear Regulatory Commission
i
611-Ryan Plaza Drive, Suite 1000
Arlington, Texas
76011
William A. Burchette, Esq.
Counsel for Tex-La Electric
Cooperative of Texas
Heron, Burchette, Ruckert & Rothwell
1025 Thomas Jefferson St., NW
- Washington, DC
20007
l
l
l
.
!
~
.
. .
.
_ _ .
-
. .
.
. .