ML19353A354

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-440/80-25 & 50-441/80-23 on 801001-31 & Notice of Violation
ML19353A354
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 11/19/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19353A355 List:
References
NUDOCS 8101080264
Download: ML19353A354 (2)


See also: IR 05000440/1980025

Text

RfC

.f'pA

jo

UNITED STATES

/

1

g

!\\ S

NUCLEAR REGULATORY COMMISSION

5 )d *g p) n

J/

E

REGION lil

's

-

24

J

799 ROOSEVELT ROAD

o

,

{ ' %,r /

GLEN ELLYN, ILLINolS 60137

NOV 19 G80

. :;

-

d

T;

3

c.3

a

0,

CS

y

Docket No. 50-440

0

M

Docket No. 50-441

M

,

,

cn

. . ,

55

-

The Cleveland Electric Illuminating

ut

S

company

O

j

eq

ATTN: Dalwyn R. Davidson

v

Vice President - System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Mr. J. Hughes of this office on

October 1-31, 1980, of activities at t:.c Perry Nuclear Plant Project, Units 1

and 2, authorized by NRC Construction Permits No. CPPR-148 and No. CPPR-149

and to the discussion of our findings with Messrs. M. R. Edelman and

G. W. Groscup and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice -is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office

within thirty days of your receipt of this notice a written statement

or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective

action to be taken to avoid further noncompliance; and (3) the date

when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter,

the enclosures, and your response to this letter will be placed in the

NRC's Public Document Room, except as follows.

If the enclosures contain

infomation that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter,

to withhold such information from public disclosure.

The

application must include a full statement of the reasons for which the

information is considered proprietary, and shculd be prepared so that

proprietary information identified in the application is contained -in

an enclosure to the application.

8101080N'/

t

.

The Cleveland Electric

-2-

Illuminating Company

NOV 19 080

,

we will gladly discuss any questions you have concerning this

'

inspection.

Sincerely,

h[

Pb

G.

Fiorelli, Chief

Reactor Construction and

,

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice

Violation

2.

IE Inspection Reports

No. 50-440/80-25 and

No. 50-441/'90-23

cc w/encls:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

liarold W.

Kohn, Power

Siting Commission

Mr. Daniel D. Wilt, Attorney

Helen W. Evans, State of Ohio

-