ML19353A321
| ML19353A321 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 12/23/1980 |
| From: | Seidle W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Oprea G HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML19353A322 | List: |
| References | |
| NUDOCS 8101080131 | |
| Download: ML19353A321 (1) | |
Text
-
C
+p"s as"O',%}
UNITED STATES NUCLEAR REGULATORY COMMISSION 2;L J.+
, 3; nm <.
'g.
4 s
%j 1 jc
' REGION IV :
[g k
8 611 RYAN PLAZA DRIVE, SUITE 1000 N
h,
,,8
}
ARLINGTON. TEXAS 76011 (n
, ii _.
(#
h,jb 2
[
December 23, 1980 In Reply Refer To:
RIV fo N
Docket No. 50-498/Rpt. 79-19 50-499/Rpt. 79-19 Houston Lighting and Power Company ATTN: Mr. G. W. Oprea, Jr, Executive Vice President Post Office Box 1700 Houston, Texas 77001 Gentlemen:
Thank you for your letter (ST-HL-AE-526) of September 4,1980, which transmitted documentation pertaining to the Complex Concrete Restart Program and STP Welding Program in response to the NRC Order to Show Cause dated April 30, 1980.
We will review this documentation and implementation of corrective actions during future inspections.
Sincerely, f
h W. C. Seidle, Chief l
a Reactor Construction and Engineering Support Branch 1
8103080 I3I A