Ack Receipt of Forwarding Interim Rept Re 3-inch Gate Valves in Safety Injection & Chemical & Vol Control Sys
ML19353A163
Person / Time
Site: Beaver Valley
Issue date: 12/24/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
References
2DLC-3806, NUDOCS 8101070350
Download: ML19353A163 (1)


Text

,

WI AS N Cocket No. 50-412 Ouquesne Light Company ATTN:

Mr. E. J. Woolever Vice President 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Gentlemen:

Subject:

3" MOV Gate Valves in Safety Injection and Chemical and Volume Control System Thank you for your letter, dated Novemoer 20, 1980, which forwarded an-interim report pursuant to 10 CFR 50.55(e) regarding the subject matter.

We look forward to receiving your next interim report which you plan to submit on June 1, 1981.

Your cooperation with us is appreciated.

Sincerel'y, Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch cc:

R. J. Washabaugh, Quality Assurance Manager bec:

IE Mail & Files (For Approprit;e Ofstribution)

Central Files Public Document Room (POR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

Technical Information Center (TIC)

REG:I Reading Room Commonwealth of Pennsylvania 3

Y$

\\

\\

mm 8101070350 5

.~.

t 2DLC-3303 Duquesne UdTt maar. n

ws November 20, 1980 United States Nuclear Regulatory Ccmmission Regicn I 631 Park Avenue King of Prussia, PA 19406

)

AT"TNTICN :

Mr. Boyce H. Grier, Director i

l

SUBJECT:

SEAVER VAI. LEY PCWER SIATICN - CNIT NO. 2 Docket No. 50-412 3" Mov Gate valves in Safety Injection and Chemical and Volume Control Sistem - Sienificant Deficiencv 90-06

- Gentlemen:

Westinghouse has notified us that problems were encountered dur Ang preoperational testing at a dc=estic station and at a foreign statien of three-inch gate valves manufactured by their Electro-Mechanical Division.

Beavec Valley Unit No. 2 has received several of the subject valves as part of the NSSS scope of supply.

"'his problem was reported to your office on Cctober 29, 1980 as a significant deficiency.

l An investigatien into the acove valve deficiency is currently l

underway.

Pursuant to the requirements.of ICCFR5 0. 55 (e ), enclosed is

  • Interim Report en 3" MCV Gate valves in Safety Injection and Chemical and Wlume Centrol System at Seaver valley Power Station - Unit No. 2.*

We plan to issue another interim report en June 1, 1981.

DUQUESE LIGHT CCMPANY Ywd e.

sy E uJ. Woolever Vice President t

l Enclosure l

. r. V. Stello (13)

CO:

.%. K. Jabbcur DUPLICATE DOCUMENT Entire document previously entered into system under: