ML19353A064
| ML19353A064 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/18/1980 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Morisi A BOSTON EDISON CO. |
| References | |
| NUDOCS 8101070052 | |
| Download: ML19353A064 (1) | |
Text
{{#Wiki_filter:*# 'o UNITED STATES 7
- g
!}3, NUCLEAR REGULATORY COMMISSION , (7" s(g gy,n j REGION I o, 3 g 631 PARK AVENUE %.V ,e KING OF PRUSSIA, PENNSYLVANIA 19406 a ], Docket No. 50-293 DEC 181980 Boston Edison Company M/C Nuclear l ATTN: Mr. A. V. Morisi w ~i Nuclear Operations Support Manager J y 800 Boylston Street Boston, Massachusetts 02199 Gentlemen: The enclosed Supplement No. 4 to IE Bulletin No. 80-17, " Failure of Control Rods to Insert During a Scram at a 8WR" is forwarded to you for action. A written response is required. In order to assist the NRC in evaluating the value/ impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the Bulletin. Please estimate separately the manpower associated with corrective actions following identification of problems through the Bulletin. If you desire additional information regarding this matter, please contact this office. Sincerely, L171/C-Na /4M. - ce H. Grier irector
Enclosures:
1. Supplement No. 4 to IE Bulletin No. 80-17 2. List of Recently Issued IE Bulletins CONTACT: D. L. Caphton (215-337-5266) l l cc w/encis: R. D. Machon, Nuclear Manager - Pilgrim Station l I t
SSIMS No.: 6820 Accessien No.: 1 8006190074 UNITED STATES IEB 80-17 Sup. 4 NUCLEAR REGULATORY CDPMISSION 0FFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 December 18, 1980 IE Supplement 4 to Bulletin No. 80-17: FAILURE OF CONTROL RODS TO INSERT DURING A SCRAM AT A BWR NRC staff evaluation uf failures of the continuous monitoring system (CM.S) for the scram discharge volume (SDV) at an operating BWR has identified the need for licensee actions in addition to those requested by IEB 80-17 and l S@plements 1-3.- The purpose of these actions is to provide assurance that the CMS has been tested to demonstrate operability as installed, remains operable during plant peration, and is periodically surveillance tested to demonstrate continued operability. l The occurrence of CMS failures at Dresden Nuclear Power Station was discussed in l IE Information Notice 80-43, which was issued on December 5, 1980 to those l operating BWR's with CMS recently installed. Subsequently, investigation into the cause of the failure to receive the alarm with the SDV essentially full revealed several items which required correction, including: 1. Excess portions of transducer cable were placed in physical positiors which vauld increase external noise sensitivity. 2. The UT transduenrs were not placed in a physical po,sition to optimize system sensitivity. I 3. A certain amount of " cross-talk" was occuring between redundant trans-ducers located a few feet apart on the same run of 4" pipe. l Station and vendor personnel shortened and rerouted transducer cables to improve noise rejection. Vendor specialists optimized transducer placement and synchronized both transducers to the same ultrasonic instrument internal clock to minimize cross-talk and improve signal to noise characteristics. Following these actions the CMS appeared to function properly. Further difficulties were encountered when apparently minor quantities of water leaked into the SDV as a result of control rod drive scram valve maintenance l activities and minor scram outlet valve leakage. It appears that the trans-ducers are located on a section of SDV piping which forms a local low point. Accordingly, small amounts of water can accumulate to a depth which triggers l the high level alarm (at 1-1/4") before the water drains to the instrument volume. The licensee in conjunction with the NSSS vendor, performed a unit ^~ specific analysis for a conservative point to 2-1/2". The system now appe i alarm time delay was also installed DUPLICATE DOCUMENT t j Entire document previously entered into system under: ANo SDOG19e 67 l No. of pages: W
= = = = = = -~}}