Forwards IE Insp Rept 50-317/80-21 on 801022-24,1105-07 & 13-14 & Notice of Violation
ML19352A018
Person / Time
Site: Calvert Cliffs 
Issue date: 12/11/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19352A016 List:
References
NUDOCS 8102250455
Download: ML19352A018 (2)


See also: IR 05000317/1980021

Text

A

e

p Kgg

o

UNITED STATES

g

! f 3 s,

g

NUCLEAR REGULATORY COMMISSION

'

';; '

8

REGION I

o, '

8

631 PARK AVENUE

O'

'

%, ..... d

KING OF PRUSStA, PENNSYLVANIA 19406

j

-

DEC .1 :::)

Docket No. 50-317

Baltimore Gas and Electric Company

ATTN:

Mr. A. E. Lundvall, Jr.

Vice President, Supply

P. O. Box 1475

Baltimore, Maryland 21203

Gentlemen:

Subject:

Inspection 50-317/80-21

This refers to the routine inspection conducted by Mr. E. Jernigan of this

office on October 22-24, November 5-7 and November 13-14, 1980, at Calvert

Cliffs Nuclear Power Plant, Unit 1, at Lusby, Maryland, of activities authorized

by NRC License No. OPR-53 and to the discussions of our findings held by Mr.

Jernigan with Mr. L. Russell at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

This item of noncom-

pliance has teen categorized into the levels as described in our correspondence

to you dated December 31, 1974.

This notice is sent to you pursuant to the

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further items of noncompliance; and (3) the date when full

compliance will be achieved.

In accordance with Sectiora 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room.

If this report contains any

90 '3I

.

gg-

,

--

w-

y

o

.

Baltimore Gas and Electric Company

2

information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790.

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

/'

W

d~

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Branch

.

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection Report Number

50-317/80-21

cc w/encls:

R. M. Douglas, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Principal Engineer

J. A. Tiernan, Manager, Nuclear Power

R. E. Denton, General Supervisor, Training and Technical Services