ML19351G522

From kanterella
Jump to navigation Jump to search
Safety Evaluation Re Actions Taken in Response to IE Bulletin 79-13, Cracking in Feedwater Sys Piping. Cracks Are Unique to Westinghouse & C-E Fabricated Facilities
ML19351G522
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/02/1981
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19351G516 List:
References
IEB-79-13, NUDOCS 8102240115
Download: ML19351G522 (2)


Text

.

!aus ~$

UNITED STATES Q8 NUCLEAR REGULATORY COMMISSION o

n

.j wAsHmotow. o. c. 2oses

/

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ACTIONS TAKEN IN RESPONSE TO BULLETIN 79-13 " CRACKING IN FEECWATER SYSTEM PIPING" FOR TOLED0 EDIS0N COMPANY AND CLEVELAND ELECTRIC ILLUMINATING COMPANY DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 DOCKET NO. 50-346 Background and Discussion On May 20, 1979 Indiana and Michigan Power Company notified the NRC of pipe cracks in two feedwater lines at their D. C. Cook Unit 2 facility. Pipe cracks were discovered following a shutdown on May 19 to investigate leakage inside containment. Circumferential cracks were identified as leaking in tne 16-inch feedwater elbows adjacent to two steam generator nozzle to elbow welds.

Subsequent radiographic examinations revealed cracks in all eight steam genera-tor feedwater lines at this location on both Units 1 and 2.

On May 25,1979, a letter was sent to all PWR licensees by the Office of Nuclear Reactor Regulation which infomed licensees of the D. C. Cook failures and re-quested specific infomation on feedwatar system design, fabrication, inspection and operating histories. To further explore the generic nature of the cracking problems, the Office of Inspection and Enforcement requested licensees of PWR plants in current outages to imediately conduct volumetric examination of certain feedwater pipe welds. As a result of these actions several other licensees reported cracking in the steam generator nozzle to feedwater piping weld vicinity. On June 25, 1979, IE Bulletin 79-13 was issued. The Bulletin re-quired inspection of the steam generator nozzle-to-pipe welds and adjacent areas to be conducted within 90 days. The Bulletin also required an expanded inspec-tion program to be conducted during the next refueling outage consisting of the reinspection of all previously inspected welds, main feedwater pipe welds to the first support, main feedwater pipe welds to the containment penetration and auxiliary feedwater pipe joining the main feedwater pipe.

Instrumentation was installed at several plants which had experienced feedwater pipe cracking. As a result of this instrumentation and other modelinp and analysis by a Westinghouse Owners's Group, significant cyclic stresses were discovered to hhve occurred in the feedwater piping in the vicinity of the steam generator nozzle.

The cyclic stresses were caused by mixing and stratification of cold auxiliary feedwater with hot water from the steam generator in the feedwater piping during low flow conditions. Metallurgical analysis of the cracked feedwater piping has identified tne mode of failure as fatigue assisted by corrosion which supports the findings of the Westinghouse Owner's Group.

ir-

.m,,.m-e%-.

...m.,c-4

-y.-..%,,.,,,.c-,.y-3 3.f..,.w,,,,.

y

,__.,,,y,,

.,4g,

. In an August 24, 1979 meeting with the Babcock & Wilcox (B&W) Owner's Group at Bethesda, Maryland, the grouo identified steam generator design differences between those fabricated by B&W and those fabricated by Westinghouse and Com-bustion Engineering. Furthermore, operating conditions of the B&W plants pre-cludes the occurrences of stratification of cold auxiliary feedwater with hot water from the steam generator.

In addition, the B&W Owner's Group reported that 95 welds in the main and auxiliary feedwater piping at Crystal River Unit No. 3 and at Davis-Besse 1 (DB-1) had been radiographically examined and no cracks had been detected.

By letters dated June 19, July 13 and August 8,1979, and August 6,1980, the Toledo Edison Company responded to our May 25, 1979, letter and to Bulletins 79-13 and 79-13(2) concerning the feedwater pipe cracks as they relate-to DB-1.

In these submittals, Toledo Edison addressed the design, fabrication, preservice/ inservice inspections, and operatinn history of the feedwater systems.

Evaluation Based upon the identified mode of cracking of the feedwater to nozzle weld, the operating and design characteristics of the B&W steam generator, the satisfactory inspection results on welds in the main and auxiliary feedwater piping on Crystal River Unit No. 3 and on DB-1, and the review of Toledo Edison's response, we conclude that feedwater nozzle cracks are unique to the Westinghouse and Combustion Engineering fabricated facilities;

+

Furthermore, stratification of the cold and hot water is imoossible to occur under all modes of plant operation (including analyzed accident conditions) at the B&W fabricated facilities includin9 08-1 because the cold auxiliary.

feedwater enters the steam generator thru a separate line, and thus cannct mix with the hot water that would backup from steam generator into the main feedwater pipe where cracks have been observed. This is the case for the B&W main feedwater system because the licensee has indicated that main feed-water is always preheated before entering the steam generator for all modes of high temperature operation ($>360*F).

In addition, the velocities are high enouch ($>10 ft/sec.) to prevent the high temperature water or steam from backing up from the steam generator into the feedwater lines. On this basis, we have concluded that feedwater pipe cracks caused by thennal cycling similar to those observed at the Westinghouse fabricated facilities will not occur at the B&W fabricated facilities (including TMI-1). For this reason, we have exempted the B&W fabricated facilities from the augmented inspection program under I&E Bulletin 79-13. This decision was conveyed to all licensees by issuing a revision to Bulletin 79-13. On this basis, TMI-l is exempted from the inspection requirements of Bulletin 79-13. We conclude that granting the exemption from Bulletin 79-13 will not in any way endanger puolic health and safety.

Feedwater nozzle to pipe weld cracking is still under generic review by the staff.

Should the staff determine that actions beyond those stated in IE Bulletin 79-13 are necessary to ensure adequate feedwater line integrity,_ the licensee will be notified at that time.

Dated: February 2, 1981

-