ML19351G180

From kanterella
Jump to navigation Jump to search
Advises That IE Bulletin 80-25,originally Transmitted 801219,for Info,Requires Action within 90 Days.Forwards Corrected Transmittal Ltr & Encl
ML19351G180
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 01/14/1981
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Pollock M
LONG ISLAND LIGHTING CO.
Shared Package
ML19351G181 List:
References
IEB-80-25, NUDOCS 8102230230
Download: ML19351G180 (1)


Text

.

p one h

o UNITED STATES

,o g

s.}gN)y g

NUCLEAR REGULATORY COMMISSION y

.j REGION I t 'h'e 631 PARK AVENUE

%, V

,o#

KING O F PRUSSIA, PENNSYLVANIA 19406 JAff 141981 Docket No. 50-322 f[

Long Island Lighting Company P

IfB()gIS81A qj ATTN: Mr. M. S. Pollock l::

Vice President - Nuclear 5 4 k,$.g ifh 175 East Old Country Road Hicksville, New York 11801 A

Gentlemen:

IE Bulletin No. 80-25, " Operating Problems with Target Rock Safety-Relief Valves at BWRs," was forwarded to you for infonnation on December 19, 1980.

It should have been transmitted to you for action, however.

Enclosed for information and as a matter of con-venience for you, is a copy of the transmittal letter which you should have received, including the two enclosures to the letter.

The Bulletin requires a response within 90 days of the date of the Bulletin.

In this case, the dete by which you must respond is extended to 90 days from the date of this letter.

If you have any questions or desire additional information regarding this matter, please contact this office.

Sincerely, W

s Boyc[H. Grier Director

Enclosure:

Letter to Long Island Lighting Company from the Director, Region I dated January 14, 1981 with two enclosures CONTACT:

D. L. Caphton (215-337-5266) cc w/ enclosure:

J. P. Novarro, Project Manager Edward M. Barrett, Esquire Edward J. Walsh, Esquire T. F. Gerecke, Manager, Engineering QA Department 8102230p %