ML19351F317

From kanterella
Jump to navigation Jump to search

Forwards Amend 17 to License NPF-2,safety Evaluation & Notice of Issuance & Availability
ML19351F317
Person / Time
Site: Farley 
Issue date: 12/10/1980
From: Varga S
Office of Nuclear Reactor Regulation
To: Clayton F
ALABAMA POWER CO.
Shared Package
ML19351F319 List:
References
TAC-10471, NUDOCS 8101120228
Download: ML19351F317 (3)


Text

)

~

l

, -[ p pn noe UNITED STATES fl Jg NUCLEAR REGULATORY COMMISSION 2

y c

g 2 E WASHtNCTON, D. C. 20655 o

%*'....}

December 10, 1980

~y 7;

Docket No. 50-348

.. ?

,z L':

c% -

(G M

Mr. F. L. Clayton

^

ES l

Senior Vice President cn

~3 l

Alabama Power Comcany y

y i

Post Office Box 2541 g

a.a Bir:ningham, Alabama 35291

Dear Mr. Clayton:

The Cc : mission has issued the enclosed Amendment No.17 to Facility Ocerating License No. NPF-2 for the Joseph M. Farley Nuclear Plant, Unit No. 1.

The amendment consists of changes to the Technical Specifica-tions in resconse to your application transmitted by letters dated October 15,1979 (modified by letter dated October 3,1980) and October 23, 1979.

The amendment provides the following:

1.

Revised Administrative Controls Technical Specifications for entry into high radiation areas; 2.

Added feecwater control system bypass valves response times to Tech-nical Specifications; and 3.

Added license condition relating to the approved " Joseph M. Farley Nuclear Contingency Plan." This condition is a followup action to our "ay 1,1980 letter which aooroved the plan.

inor changes were made to some of your proposals. These changes have been discussed with your staff who concur with our changes.

%- 4tter dated May 1,1980 approved the Safeguards Contingency Plan 23, 1979 as revised October 8,1979 and March 20, 1980. Our dated March action at this time adds a requirement to the license to fully imolement and 'naintain in effect all provisions of the approved plan, including.

amendments and changes made pursuant to the authority of 10 CFR 50.54(p).

e will centinue to withhold your Contingency Plan and related materiais I

'roa public disclosure in accordance with the provisions of 10 CFR 2.790(d).

Cur Order of Octocer 20, 1980 issued Technir.al Specification pages 6-19 and 5-22 relating to Envircnmental Qualifications of safety-related elec-i These pages plus index page XVIII have been reissued l

trical ecuipment.

in this letter to correct the page numbers ar.d are transmitted herewith

  1. r inser-ion into the Technical Soecificatfors.

l Blo12oo n g r

Mr. F. L. Clayton Alabama Pcwer and Light Company December 10, 1980 Copies of the Safety Evaluation and the Notice of Issuance are also enclosed.

Sincerely, 1

Dh b

h Operating Reacto Branch fl Division of Licensing 1

Enclosures:

1.

Amendment No.17 to NPF-1 2.

Safety Evaluation 3.

Notice of Issuance cc: w/ enclosures See next page l

l l

L

Mr. F. L. Clayton Alabama Pcwer Company December 10, 1980 cc:

Mr. W. O. Whitt U. S. Environmental Protection Agency Executive Vice President Region IV Office Alabama Power Company ATTN: EIS COORDINATOR Post Office Box 2641 345 Courtland Street, N.E.

Birmingham, Alabama 35291 Atlanta, Georgia 30308 Ruble A. Thomas, Vice President Southern Company Services, Inc.

Post Office Box 2625 Birmingham, Alabama 35202 George F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C.

20036 Chairman Houston County Commission Dothan, Alabama 36301 Mr. Robert A. Buettner, Esquire Balch, Bingham, Baker, Hawthorne, Williams and Ward Post Office Box 306 Birmingham, Alabama 35201 George S. Houston Memorial Library 212 W. Burdeshaw Street Dothan, Alabama 36303 Resident Inspector U. S. Nuclear Regulatory Commission Post Office Box 1814 Dothan, Alabama 36302 State Department of Public Health l

ATTN: State Health Officer State Office Building Montgomery, Alabama 36104 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)

U. S. Environmental Prctection Agency Washington, D. C.

20460

,