Forwards IE Insp Repts 50-416/80-25 & 50-417/80-15 on 801028-31,notice of Violation & Notice of Deviation
ML19351F262
Person / Time
Site: Grand Gulf  
Issue date: 11/21/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19351F258 List:
References
NUDOCS 8101120081
Download: ML19351F262 (2)


See also: IR 05000416/1980025

Text

!

-

-

.

.

,

t

e asog'o

UNITED STATES

,

8

NUCLEAR REGULATORY COMMISSION

0E,

Ag)E

o

.s E

REGION 11

e

+"

101 MARf ETTA ST., N.W., sulTE 3100

g**Q [

ATLANTA, GEORGIA 3o3o3

NOV21ago

In Reply Refer To:

RII:WHM

50-416/80-25

50-417/80-15

Mississippi Power and Light Company

ATTN:

N. L. Stampley

,

Vice President of Production

P. O. Box 1640

Jackson, MS 39205

Gentlemen:

This refers to the inspection conducted by W. H. Miller, Jr. of this office on

October 28-31, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-118 and CPPR-119 for the Grand Gulf facility, and to the discussion of our

findings held with J. P. McGaugby, Jr. at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and lepresentative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This natice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

During the inspection it was found that certain activities under your license

appear to deviate from commitments to the Commission and from applicable guides,

codes or standards which are approved by the Comm.9sion and have safety signifi-

This item identified in the Notice of Deviation enclosed herewith as

cance.

Appendix B.

Please provide us in writing within 20 days of your receipt of this

,

letter your comments including a description of corrective actions that h.c.ve

been or will be taken, corrective actions which will be taken to avoid further

deviations, and the dato corrective actions were or will be completed.

81033 ROD 37

-

. . _ . _ , _

. .

_

_

_ _ _

_ . . _ . .

_.

.

. . . .

-.

- -~

.

.

.

~

Mississippi Power and Light Company

-2-

.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the documer.t. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, ~ Chic

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Appendix B, Notice of Deviation

3.

Inspection Report Nos. 50-416/80-25

and 50-417/80-15

,

cc w/ enc 1:

C. K. McCoy, Plant Manager

,