Forwards IE Insp Rept 50-364/80-47 on 801028-30.No Noncompliance Noted
ML19351E763
Person / Time
Site: Farley 
Issue date: 11/13/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19351E764 List:
References
NUDOCS 8012190196
Download: ML19351E763 (2)


See also: IR 05000364/1980047

Text

.

'

a na

o

UNITED STATES

.

8

3,([g

NUCLEAR REGULATORY COMMISSION

(

.r

REGION il

k

'gf*

101 MARIETTA sT., N.W., SUITE 3100

g ..v 4 8

ATLANTA. G EoRG I A 30303

j

...

In Reply Refer To:

R}I GbT --

(50-364/80-4h-

Alaba:aa Pcwer Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by G. L. Troup of this office on October 28-30,

1980, of activities authorized by NRC Construction Pennit No. CPPR-86 for the

Farley facility, and to the discussion of our findings held with J. D. Woodard

at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any= information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

l

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

.

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

l

separate part of the document. If we do not hear from you in this regard within

l

the specified period, the report will be placed in the Public Document Room.

l

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

!

J .'

r, Chief

.

i

Fuel Facility and Material

Safety Branch

Enclosure:

(See Page 2)

.

.

_

__.

- -

.

. -

-

- - .

-

s

Alaban Power Company

-2-

NOV 131980

Enclosure:

Inspection Report

No. 50-364/80-47

.cc w/ encl:

,

W. O. Whitt, Executive Vice President

H. O. Thrash, Manager, Nuclear Generation

F. L. Clayton, Jr., Senior Vice President

W. C. Petty, Manager-Quality Assurance

(Design and Construction)

W. G. Hairston, III, Plant Manager

R. E. Hollande, Jr., QA Supervisor'

O. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services