a na
o
UNITED STATES
.
8
3,([g
NUCLEAR REGULATORY COMMISSION
(
.r
REGION il
k
'gf*
101 MARIETTA sT., N.W., SUITE 3100
g ..v 4 8
ATLANTA. G EoRG I A 30303
j
...
In Reply Refer To:
R}I GbT --
(50-364/80-4h-
Alaba:aa Pcwer Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by G. L. Troup of this office on October 28-30,
1980, of activities authorized by NRC Construction Pennit No. CPPR-86 for the
Farley facility, and to the discussion of our findings held with J. D. Woodard
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any= information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
l
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
.
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
l
separate part of the document. If we do not hear from you in this regard within
l
the specified period, the report will be placed in the Public Document Room.
l
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
!
J .'
r, Chief
.
i
Fuel Facility and Material
Safety Branch
Enclosure:
(See Page 2)
.
.
_
__.
- -
.
. -
-
- - .
-
s
Alaban Power Company
-2-
NOV 131980
Enclosure:
Inspection Report
No. 50-364/80-47
.cc w/ encl:
,
W. O. Whitt, Executive Vice President
H. O. Thrash, Manager, Nuclear Generation
F. L. Clayton, Jr., Senior Vice President
W. C. Petty, Manager-Quality Assurance
(Design and Construction)
W. G. Hairston, III, Plant Manager
R. E. Hollande, Jr., QA Supervisor'
O. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
4
l
.
O
a
l
i
i
i
I
I
I
i
L _ __ _ _
_ _ _ _ _
. _ _ _ _ _ _ _ _ _ . _
_ _ . . _ _ _ _ . .
. . , -
_