Forwards IE Insp Repts 50-348/80-20 & 50-364/80-25 on 800804-07 & Notice of Violation
ML19351D940
Person / Time
Site: Farley  
Issue date: 09/17/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19351D930 List:
References
NUDOCS 8011200449
Download: ML19351D940 (2)


See also: IR 05000348/1980020

Text

..

  • /pu rg

.

D

UNITED STATES

i-~

8

$

NUCLEAR REGULATORY COMMISSION

,

j

g

,a

REGION 11

'

'

e

101 MARIETTA ST

N.W., SUITE 3100

'

j'

ATLANTA. GEORGIA 3o303

.....

SEP 171980

In Reply Refer To:

RII:WHM

50-348/80-20

50-364/80-25

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by W. H. Miller of this office on August 4-7,

1980, of activities authorized by NRC Operating License No. NPF-2 and Construction

Permit No. CPPR-86 for the Farley facility, and to the discussion of our findings

held with K. W. McCrackin and R. E. Hollands, Jr. at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

Five new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

appear to be in noacompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

'

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

I:1 accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

,

inspection report will be placed in the NRC's Public Document Room. If this

'

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so-

that proprietary information identified in the application is contained in a

80i3 200 M

.

_

_

_ -

. . - .

. -

.

..

.

.

.

.

..

.

%

n,

,

s.'H

M

M

'%

W

.

.

.

.

.

.

.

SEP 171980

Alabama Power Company

-2-

.

4

i

separate part of the document. If we do not hear'from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any-questions-concerning this letter, we will be glad to discuss

them with you.

,

.

Sincerely,

,

1

/

i

C. E. Murphy, Chie

Reactor Construction and Engineering

"

Support Branch

.,

I

Enclosures:

'

1.

Appendix A, Notice of Violation

2.

Inspection Report.Nos. 50-348/80-20

and 50-364/80-25

4

'

cc w/ encl:

A. R. Barton, Executive Vice President

F. L. Clayton, Jr., Senior Vi e President

L

~H. O. Thrash, Manager-Nuclear Generation

O. D. Kingsley, Jr., Manager, Nuclear Engineering

l,,

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

j

W. G. Hairston, III, Plant Manager