MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20095F5891995-12-12012 December 1995 Proposed Tech Specs Re Containment Sys ML20094D0611995-10-31031 October 1995 Proposed TS Page 6-18,deleting TS 6.9.2.d, Seismic Event Analysis ML20098C5181995-10-0202 October 1995 Proposed Tech Specs,Revising TS Section 5.0,design Features & Adopting Improved STS for B&W Plants Format & Content ML20098C4111995-09-29029 September 1995 Proposed TS 3/4.1.2.8 Re Reactivity Control Sys - Borated Water Sources - Shutdown TS 3/4.1.2.8 Re Reactivity Control Sys - Operating & TS 3/4.5.1 Re ECCS - Core Flooding Tanks ML20098C1121995-09-29029 September 1995 Proposed TS 3.4.3 & Associated Bases,Modifying Lift Setting of Pressurizer Code Safety Valves to Greater than or Equal to 2,575 Psig,Corresponding to Lift Setting Tolerance of +3% of Nominal Lift Pressure 1999-09-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20216E6111999-09-0707 September 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210H0731999-07-28028 July 1999 Proposed Tech Specs 3/4.7.5.1, Ultimate Heat Sink, Allowing Plant Operation in Modes 1-4 with Water Temp Less than or Equal to 90 F ML20210G4311999-07-27027 July 1999 Proposed Tech Specs,Changing TSs 6.4, Training, 6.5.2.8, Audits, 6.10, Record Retention, 6.14, Process Control Program & 6.15, Odcm ML20210G4801999-07-26026 July 1999 Proposed Tech Specs 3/4.3.2.1 Re Safety Features Actuation Sys Instrumentation & Associated Bases ML20210G9161999-07-26026 July 1999 Proposed Tech Specs 3/4.3.3.1, Radiation Monitoring Instrumentation, 3/4.3.3.2, Instrumentation - Incore Detectors & 3/4.3.3.9, Instrumentation - Waste Gas Sys Oxygen Monitor ML20210G5391999-07-26026 July 1999 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B for Type B & C Containment Leakage Rate Testing ML20195F9351999-06-10010 June 1999 Proposed Tech Specs,Revising TS 3/4.6.4.4, Hydrogen Purge Sys, TS 3/4.6.5.1, Shield Bldg Emergency Ventilation Sys & TS 3/4.6.5.1, Crevs ML20207E7941999-05-21021 May 1999 Proposed Tech Specs Allowing Use of Expanded Spent Fuel Storage Capability ML20205E5031999-03-19019 March 1999 Proposed Tech Specs Withdrawing Proposed New Action B, Previously Submitted in 981027 Application ML20204F1821999-03-0909 March 1999 Proposed Tech Specs,Adopting Changes in Frequency & Scope of Volumetric & Surface Exams Justified by W TR WCAP-14535A ML20155E4971998-10-28028 October 1998 Proposed Tech Specs 4.0.2 Re Applicability of 25% Surveillance Interval Extension Allowance ML20197G5521998-10-28028 October 1998 Rev 8 to Dbnps,Unit 1 Technical Requirements Manual ML20155E3231998-10-28028 October 1998 Proposed Tech Specs Revising Various Sections of 6.0, Administrative Controls, Including Relocation of 6.11 Contents to Plant Ufsar,Per NUREG-1430,Rev 1 ML20155D7791998-10-27027 October 1998 Proposed Tech Specs Relocating TS SR 4.6.5.1.d.4 Re Evs Negative Pressure Testing to TS 3/4.6.5.2,deleting TS Definition 1.24 & Making Related Changes Associated with Deletion of Subject Definition ML20155D8521998-10-27027 October 1998 Proposed Tech Specs Revising SRs 4.8.2.3.2.d,4.8.2.3.2.e, 4.8.2.3.2.f & Table 4.8-1 Re Testing of 125 Volt DC Station Batteries & Applicable TS Bases ML20155E0721998-10-27027 October 1998 Proposed Tech Specs Revising 3/4.3.1.1 Re RPS Instrumentation & 3/4.3.2.3 Re ARTS Instrumentation,To Provide Potential Reduction in Spurious Trip Rate for Potential Cost Savings in Excess of $50,000 ML20151W3071998-09-0808 September 1998 Proposed Tech Specs Permitting Use of Framatome Cogema Fuels M5 Advanced Alloy for Fuel Rod Cladding & Fuel Assembly Spacer Grids ML20151W2991998-09-0808 September 1998 Proposed Tech Specs Revising Section 3/4.7.6, Plant Systems - CREVS & Associated Bases ML20206D2721998-08-28028 August 1998 Rev 11,change 1 to Odcm ML20217P8351998-04-24024 April 1998 Proposed Tech Specs Clarifying Discussion of Margin Between RPS High Pressure Trip Setpoint & Lift Setting for Pressurizer Code Safety Valves ML20217P8811998-04-24024 April 1998 Proposed Tech Specs 3/4.3.1.1,3/4.3.2.1,3/4.3.2.2 & Associated Bases Relocating Tables of Response Time Limits to Plant USAR Technical Requirements Manual ML20217C4881998-03-20020 March 1998 Proposed Tech Specs SR 4.4.5.3.c.1,providing Greater Specificity as to Location of Addl Insps in Unaffected SG ML20217N4471998-02-27027 February 1998 Proposed Tech Specs Pages Provided to Modify Proposed New Action 3.7.6.1.b to Make More Consistent w/NUREG-1431 ML20203L1111998-02-26026 February 1998 Proposed Tech Specs Pages Re Amend to License NPF-3 Involving Incorporation of New Repair Roll Process for SG Tubes W/Defects in Upper Tube Sheet ML20197J2621997-12-23023 December 1997 Proposed Tech Specs Pages Re Changes to TS Definition 1.2, TS 3/4/9.5 & New TS 3.0.6 & Associated Bases.Ts Index Rev to Reflect Change to TS 3/4.9.5,included ML20197J5971997-12-23023 December 1997 Proposed Tech Specs Pages,Revising TS Surveillance Requirements for ISI Requirements of Internal Auxiliary Feedwater Header,Header to Shroud Attachment Welds & External Header Thermal Sleeves ML20217M5601997-09-0505 September 1997 Rev 11.0 to Davis-Besse Odcm ML20217R2821997-08-26026 August 1997 Proposed Tech Specs,Clarifying LCO 3.6.1.3.a & Revising Surveillance Requirement 4.6.1.3.c ML20217R2871997-08-26026 August 1997 Proposed Tech Specs,Modifying TS 3.2.5 Action Statement to Require Power Reduction to Less than 5% of Rated Thermal Power within Four Hrs If RCS Flow Rate Is Less than Specified Limit for Greater than Two Hrs ML20217G5981997-07-29029 July 1997 Proposed Tech Specs 3/4.4.3 Re Safety Valves & Pilot Operated Relief valve-operating ML20141F1101997-06-24024 June 1997 Proposed Tech Specs,Deleting Requirements for Safety Features Actuation Sys Containment High Radiation Monitors ML20138C3261997-04-18018 April 1997 Proposed Tech Specs 3/4.7.6 Revising Limiting Condition for Operation to Include New Required Actions in Event That One or Both Channels of Radiation Monitoring Instrumentation Becomes Inoperable ML20138A6891997-04-18018 April 1997 Proposed Tech Specs 3/4.5.3.2.1 & 3/4.5.2 Modifying Presently Specified 18-month Surveillance Frequencies to New Specified Frequencies of Once Each 24-months ML20140D9481997-04-0909 April 1997 ODCM, Rev 10 ML20138M1281997-02-14014 February 1997 Proposed Tech Specs 3.5.2 Re Emergency Core Cooling Systems & 4.5.2.f Re Surveillance Requirements ML20134L0561997-02-13013 February 1997 Proposed Tech Specs Re Changes Made Concerning Decay Heat Removal Sys Valve ML20134F1811997-01-30030 January 1997 Proposed Tech Specs Re Possession & Use of SNM as Reactor Fuel ML20134D7621997-01-30030 January 1997 Proposed Tech Specs Revising SR Intervals from 18 to 24 Months Based on Results of DBNPS Instrument Drift Study & TS 2.2, Limiting Safety Sys Settings, Based on Results of Revised Framatome RPS Instrument String Error ML20134B0591997-01-20020 January 1997 Proposed Tech Specs 3/4.5.3 Re ECCS Subsystems ML20132B7031996-12-11011 December 1996 Proposed Tech Specs Revising TS Definitions,Instrumentation TS & ECCS TS for Conversion to 24 Month Fuel Cycle for License NPF-3 ML20134F1891996-10-28028 October 1996 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20117P5311996-09-17017 September 1996 Proposed Tech Specs,Supporting Conversion of DBNPS from 18 Month to 24 Month Fuel Cycle ML20117N8531996-09-12012 September 1996 Proposed Tech Specs Re Reactivity Control Systems & Emergency Core Cooling Systems ML20117M2201996-09-0404 September 1996 Proposed Tech Specs 6.2.3,removing Specific Overtime Limits & Working Hours ML20116K2631996-08-0707 August 1996 Proposed Tech Specs Re Definitions,Applicability Bases, Containment Spray Sys & Containment Isolation Valve for Conversion to 24 Month Fuel Cycle ML20117K1911996-05-28028 May 1996 Proposed Tech Specs 3/4.3.1.1 - RPS Instrumentation & TS 3/4.3.2.3 - Anticipatory RTS Instrumentation Increasing Trip Device Test Interval ML20101M1921996-03-29029 March 1996 Proposed Tech Specs 3/4.6.4.4 - HPS,3/4.6.5.1 - Shield Building Evs & 3.4.7.6.1 - CREVS Re Changing Surveillance Requirements for Charcoal Filter Lab Testing to Revise Methodology Used to Determine Operability in ESF AHUs ML20101C6961996-03-0606 March 1996 Proposed Tech Specs,Allowing Deferment of SR 4.5.2.b for ECCS Flowpath Containing HPI Pump 1-2 Until 10th Refueling Outage,Scheduled to Begin 960408 ML20100E0101996-02-0505 February 1996 Proposed TS 3/4.3.2.1,Table 3.3-3,safety Features Actuation Sys Instrumentation,Reflecting Design & Actuation Logic of Plant Sequencers & Essential Bus Undervoltage Relays ML20107C3101995-12-21021 December 1995 Rev 9 to Odcm 1999-09-07
[Table view] |
Text
-_ _ _ . . _ _ _ _ .__ . _ _ .. _ _ _ _ _ _ . _
i i O INSTRUMENTATION i
l FIRE DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION i
3.3.3.8 As a minimum, the fire detection instrumentation for each fire
. detection zone shown in Table 3.3-14 shall be OPERABLE.
j APPLICABILITY: Whenever equipment in that fire detection zone is required to be OPERABLE.
1 I ACTION: With the number of OPERABLE fire detection instrument (s) less than j the minimum number OPERABLE requirement of Table 3.3-14:
- a. Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the
- accessible zone (s) with the inoperable instrument (s) at least once per hour, and i
l- b. Restore the inoperable instrument (s) to OPERABLE status within L 14 days or, in lieu of any other report required by Specifi-
- cation 6.9.1, prepare and submit a Special Report to the 4
Commission pursuant to Specification 6.9.2 within the next 30 j days outlining the action taken, the cause of the inoperability 1 and the plans and schedule for restoring the instrument (s) to OPERABLE status.
]
', c. The provisions of Specifications 3.0.3 and 3.0.4 are not
! applicable.
i I
SURVEILLANCE REQUIREMENTS i
4.3.3.8.1 Each of the above required accessible fire detection instruments
, shall be demonstrated OPERABLE at least once per 6 months by performance 2
of a CHANNEL. FUNCTIONAL TEST. Each of the above required inaccessible fire detection instrument shall be demonstrated OPERABLE at len.,e once i
per 18 months by performance of a CllANNEL FUNCTIONAL TEST.
l 4
'4.3.3.8.2 The NFPA Code 72D Class A supervised circuits supervision associated with the detector alarms of each of the above required fire
- detection instruments shall be demonstrated OPERABLE at lease once per ,
1 6 months. l I
i 1 4.3.3.8.3 The non-supervised circuits between the local panels in
- Specification 4.3.3.8.3 and the control room shall be demonstrated ,
r ' OPERABLE at least once per 31 days. !
l DAVIS-BESSE, UNIT 1 3/4 3-52 Amendment No.
1 8 01014Op e . . -. - ._ - .- -- - .. - -. .
Sheet 1 of 4 TABLE 3.3-14 FIRE DETECTION INSTRUMENTS INSTRUMENT LOCAFION MINIMUM INSTRUMENTS OPERABLE HEAT FLAME SMOKE
- 1. Containment
- a. FDZ-RCP 1 Elev. 603' 0 0 1*
- b. FDZ-RCP 2 Elev. 603' O O 1*
- c. FDZ-RCP 3 Elev. 603' 0 0 1*
- d. FDZ-RCP 4 Elev. 603' O O 1*
- e. FDZ-PZR Elev. 603' O O 1*
- f. FDZ 214 - Core Flooding Tank 1-1 Area Elev. 565' O O 3*
1 #g. FDZ 215 - Ctet. Letdown Cooler Area Elev. 565' O O 2*
- h. FDZ 220 - Incore Instrument Trench Area Elev. 565' O O 4*
- 1. FDZ 317 - Hatch Area - Elev. 565' O O 20 *
- j . FDZ 410 - East Passage - Elev. 603'/657' O O 9*
l l 2. Containment Annulus
- a. FDZ-A208 Elev. 590' O O 10
- b. FDZ-236H Elev. 774' O O 3
- c. FDZ-236L Elev. 590' 0 0 9
- 3. Auxiliary Building
- a. FDZ 402 - #1 Electrical Penetration Rm.
Elev. 603' 0 0 12
- b. FDZ 405 - Auxiliary Building Storage Rm.
Elev. 603' 0 0 1
- c. FDZ 427 - #2 Electrical Penetration Rm.
Elev. 603'
~
O O 7
- d. FDZ 303 - #3 Mechanical Pentration Rm.
Elev. 585' O O 12
- e. FDZ 304 - Corridor to Mech. Pent Rms 3&4 Elev. 585' O O 4
- f. FDZ 310 - Passage to BA Mix Tank Elev. 585' O O 8 g._ FDZ 312 - Spent Fuel Pool Pump Rm.
Elev. 585' O O 4
- h. FDZ 314 - #4 Mech. Pent. Room Elev. 585' 0 0 17
- 1. FDZ 300 - Fuel Handling Area Elev. 585' 0 0 5 i
- Fire Detectors in high radiation areas which are NOT accessible.
1 4
.-r g., --
m -
,, .,c ,, - - ,,e- , , - --- n
. ~, >
Sheet 2 of 4 I_'STRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE HEAT FLAME SMOKE
- 3. Auxiliary Building (Continued) i~
- j. FDZ 209 - Corridor to il Mech. Pent. Rm.
Elev. 565' O O 3
- k. FDZ 227 - Boric Acid Evap Passageway Elev. 565' 0 0 6
- 1. FDZ 208 - #1 Mechanical Penetration Rm.
Elev. 565' 0 0 10
- m. FDZ 231 - Clean Waste Booster Pump Rm.
Elev. 565' 0 0 1
- n. FDZ 232 - Primary & Deborating Demin Viv Rm. - Elev. 565' O O 1
- o. FDZ 234 - Boric Acid Evaporator Rm 1-2 l Elev. 565' 0 0 1
- p. FDZ 235 - Boric Acid Evaporator Rm 1-1 Elev. 565' f 0 1
- q. FDZ 236 - #2 Mechanical Penetration Pa.
Elev. 565' J 0 4
. r. FDZ 240 - Boric Acid Addition Tank Rm.
} Elev. 565' C 0 5 l s. FDZ 241 - Passage to B.A. Addition Tk Rm.
- Elev. 565' O O 2
) t. FDZ 101 - Equipment and Pipe Tunnel l' Elev. 545' O O 1
- u. FDZ 105 - ECCS Pump Room 1-1 Elev. 545' O 0, 4
- v. FDZ 110 - Corridor to Central Aren of j Aux Bldg. - Elev. 54C5 0 0 5 l w. FDZ 113 - Decay Heat Exchange. Pit l i Elev. 545' O O 1 l
- x. FDZ 115 - ECCS Pump Room 1-2 Elev. 545' O O 2
- y. FDZ 124 - Clean Waste Receiver Tank Rm. 1 Elev. 545' O O 4
- 4. Auxiliary Building Fan Rooms
- a. FDZ 500 - Radwaste & Fuel Handling Area and Air Supply Area -
Elev. 623' O O 20 l
- b. FDZ 501 - Radwaste Exhaust Equipment and Main Station Exhaust Fan Room Elev. 623' O 0 22
- c. FDZ 515 - Purge and Exhaust Equipment Rm.
Elev. 623' O O 22
- d. FDZ 516 - Non-rad Air and Exhaust Equip.
Rm. - Elev. 623' O O 5 l
l g- v-- y , - , - ,, . - - _ - - - - . -
Sheet 3 of 4 INSTRUMENT LOCATION MINIMUM INSTRUMENTS OPERABLE HEAT FLAME SMOKE
- 5. Control Room Complex l
- a. FDZ 505 - Main Control Board Cabinets 3
Elev. 623' O O
- b. FDZ SOS - Control Cabinet Room Elev. 623' O O 5 FDZ 505 - Computer Room - Elev. 623' O O 1 c.
l
- 6. Cable Spreading Room 0 0 5
- a. FDZ 422A - Elev. 613' l
l
- 7. A/C Equipment Room
- a. FDZ 603 - Elev. 643' O O 11
- 8. Diesel Generator Rooms
- a. FDZ 318 - Diesel Generator Rm. 1-1 Elev. 585' 0 0 5
- b. FDZ 319 - Diesel Generator Rm. 1-2 Elev. 585' 0 0 4
- c. FDZ 321A - Diesel Generator Day Tank Room 1 E1Ev. 5 0 0 1
- d. FDZ 320A - Diesel Generator Day 'fank Room,1 Elev. 5 0 0 1
- 9. Battery Rooms FDZ 428A - Battery Room B - Elev. 603' O O 2
- a. '
FDZ 429B - Battery Room A - Elev. 603' O O 2 b.
- 10. Component Cooling Water Pump Room 0 0 9
- a. FDZ 328 - Elev. 585'
- 11. Feed Pump Rooms
- a. FDZ 237 - Auxiliary Feed Pump 1-1 O 3 Elev. 565' O
- b. FDZ 238 - Auxiliary Feed Pump 1-2 0 3 Elev. 565' 0
d
".* Sheet 3 of 4 MINIMUM INSTRUMENTS OPERABLE INSTRUMENT LOCATION HEAT FLAME SMOKE I
i 5. Control Room Complex l a. FDZ 505 - Main Control Board Cabinets 3 O O l
Elev. 623'
- b. FDZ 505 - Control Cabinet Room 5 O O j , Elev. 623' 1 FDZ 505 - Computer Room - Elev. 623' O O
~
c.
l 6. Cable Spreading Room O O 5 i a. FDZ 422A - Elev. 613' 1
i
. 7. A/C Equipment Room O O 11
- a. FDZ 603 - Elev. 643' i
i 8. Diesel Generator Rooms 4
- a. FDZ 318 - Diesel Generator Rm. 1-1 Elev. 585' 0 0 5 l
- b. FDZ 319 - Diesel Generacor Rm. 1-2 4 Eler. 585' 0 0
- c. FDZ 321A - Diesel Generator Day Tank Room 1 Elsv. 5 0 0 1
- d. FDZ 320A-- Diesel Generator Day Tank 0 0 1 Room 1 Elev. 5
}1
- 9. Battery Rooms r
O 2
- a. FDZ 428A - Battery Room B - Elev. 603' O 0 0 2
- b. FDZ 429B - Battery Room A - Elev. 603'
- 10. Component Cooling Water Pump Room 0 0 9
- a. FDZ 328 - Elev. 585'
- 11. Feed Pump Rooms
- a. FDZ 237 - Auxiliary Feed Pump 1-1 0 0 3 Elev. 565'
- b. FDZ 23f; - Auxiliary Feed Pump 1-2 0 0 3 Elev. 565'
- _ _ - _ _ _ _ _ = _ . - - - - . - - - - . . _ _ _ _ - _ _ _ - - - _ _ _
o s
Sheet 4 of 4 MINIMUM INSTRUMENTS OPERABLE INSTaUMENT LOCATION 4
HEAT _ FLAME SMOKE
- 12. Switchgear Roomg
- a. FDZ 324 - CD ~31gb Voltage Switchgear O O 3 01ev. 585'
' b. FDZ 325 - A High Voltage Switchgear 8 O
Elev. 585' O
- c. FDZ 323 - B High Voltage Switchgear O O 11
. Elev. 585' l l
- d. FDZ 428 - F High Voltage Switchgear l O O 12 j Elev. 603'
, c. FDZ 429 - E High Voltage Switchgear 6 O O
- 13. Intake Structure
- a. FDZ 052 - Diesel Fire Pump Room O O 1 Elev. 576' j b. FDZ 052- Service Water Pump Room O O 3 j Elev. 576'
- c. FDZ 053 - Service Water Viv. Room 0 6 Elev. 565' 0 4
i J
i l j
+
l l
1
- The fire detection instruments located within the Containment are not required to be OPERABLE during the performance of Type A Containment Leakage Rate Tests.
- These detectors automatically actuate fire suppression systems.