ML19351D535

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/80-07 & 50-509/80-07 on 800811-14.No Noncompliance Noted
ML19351D535
Person / Time
Site: Satsop
Issue date: 09/03/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19351D536 List:
References
NUDOCS 8010100366
Download: ML19351D535 (2)


See also: IR 05000508/1980007

Text

, p+* * * %g

o

UNITED STATES

'g

!*

NUCLEAR REGULATORY COMMISSION

o

$

aE

REGION V

0,

8

1990 N. CALIFORNIA BOULEVARD

% * *w

o

SUITE 202, WALNUT CREEK PLAZA

,e*

WALNUT CR EE K, CALIFORNI A 94596

sEn

3 1980

.

Docket No. 50-503, 50-509

Uashington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: fir. R. L. Ferguson

flanaging Director

Gentlemen:

Subject: NRC Inspection - WNP 3 and 5

This refers to the inspection conducted by Messrs. D. P. Haist and G. Hernandez

of this office on August 11-14, 1980 of activities authorized by NRC Construction

Permit Nos. CPPR-154 and CPPR-155, and to the discussion of our findings held

by Mr. Haist with Mr. W. J. Talbott and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and observations

by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection,

j

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

j

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

,

inspection report will be placed in the NRC's Public Document Room.

If this

'

report contains any information that you believe to be proprietary, it is necessary

that you submit a written application to this office, within 20 days of the

date of this letter, requesting that such information be withheld from public

disclosure. The application must include a full statement of the reasons why

it is claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in

an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in the

Public Document Room.

89/#/# acc

-

- - -

-

- - - -

-

-

-

-

-

..

-

-

.

. -

.

.

Washington Public Power Supply System

-2-

SEP

3 1939

,.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

,

I

. Sincerely,

d

G. S. Spencer, Chief

Reactor Construction and

,

Engineering Support Branch

Enclosure:

IE Inspection Report

Nos. 50-508/80-07

50-509/80-07

cc w/o enclosure:

M. E. Witherspoon, Division Manager

,

Quality Assurance, WPPSS

'

W. J. Talbott, Division Manager,-WPPSS

1

.

3

,

.

e

-

.

.

.

.

.

. . .

-

.

. -

-

m

.