05000334/LER-1980-069-01, /01T-0:on 800920,during Surveillance test,motor- Driven Fire Pump Malfunctioned.Caused by Cooling Loss to Motor Bearing,Due to Clogged Water Supply Valve.Isolation Valve Cleared & Supply Line Checked

From kanterella
(Redirected from ML19351D512)
Jump to navigation Jump to search
/01T-0:on 800920,during Surveillance test,motor- Driven Fire Pump Malfunctioned.Caused by Cooling Loss to Motor Bearing,Due to Clogged Water Supply Valve.Isolation Valve Cleared & Supply Line Checked
ML19351D512
Person / Time
Site: Beaver Valley
Issue date: 10/03/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19351D510 List:
References
LER-80-069-01T, LER-80-69-1T, NUDOCS 8010100310
Download: ML19351D512 (2)


LER-1980-069, /01T-0:on 800920,during Surveillance test,motor- Driven Fire Pump Malfunctioned.Caused by Cooling Loss to Motor Bearing,Due to Clogged Water Supply Valve.Isolation Valve Cleared & Supply Line Checked
Event date:
Report date:
3341980069R01 - NRC Website

text

-

U.S. NUCLEAR RE ULATMY COMMIS&lON teac Pomas 3e6 f7 7M LICENSEE EVENT REPORT CONTROL SLOCIC: l l

l l

l l

l@

(PLEAsE PAINT GR TYPt ALL REQUIREO INFORMATIONI i

o ! i I l P l A l 5 l V l S 11 l@IS0 l0 l-- l 0 { 0 l0 l 010 l-l0 l0

@l4 l1 l1 l1 l1 l@l l

l@

8 9 UCEM6EE CQQE le r.aCENSENuusen 2h 26 uCEP,5E TYPE 40 6 7 GA T S4 f

ol2I sou,$C l L @l 015 l 0 l 010 l 3 l 3 l 4 l@l 0 l 9 l 210 ] 810 ]@l 11 O l 0l 31810l@

CowT e4 69 (V ENT QATE 74 75 REPQMT DArg 60 60 61 QoCKET NumetR f

8 EVENT DESCRIPTION AND PROS ASLE CONSEQUENCES h

["ITTI l During a surveillance test, the Motor-Driven Fire Pump [FP-P-1] failed due to a loss [

The Diesel-Driven Fire Pump [FP-P-21 l

g i of cooling water to the upper motor bearing.

A temporary fire pump was available that]

g l vas on clearance for piping modifications.

Io i s i i cotild supply 40% of system design flow.

[FP-P-21 was restored to service

{

I I o is t I approximately six hours af ter the [FP-P-1] failure.

I 10671 l l

Io la i I

+

so COM8.

vaLv E

$YSTEM

CAUSE

CAUSE CCOS CCD4 SuSCCOE COMPONENT CODE

$4sCCOE SuecocE l A l B l@ lE l@ lX l@ l Ml Ol Tl Of Rl Xlh lz l@ lz ( @

10691 7

8 9

to it 12 IJ 18 39 20 SEQUENTIAL OCCURRENCE REPCmv mEVIStoM (VENT YEAR REPORT NO.

CoCE TYPE No.

a,*g 8101 l-l '

I o f 61 91 1/l 1011 l l Tl 8

l01 O"sy<Em/mol21_.22 23 24 26 27 28 29 30 3

J2 L

EN 'ACii'"4 eVA'Kr 5""a?5" auas @

^s".'S #1s'

,o"00..

'"s'u"/,5"/~

M3u',"f#u"'.

Laj@l zl@

l zl@

l zl@

10 l0. l 010 I W@

lNl@

lzl@

l 219l 9l 9f@

33 34 JS 28 37 40 4

42 43 a

47 CAUSE DESCRIPTION AND CCRRECTIVE ACTIONS @

g ] Loss of cooling to the motor bearing was caused by a clogged cooling water supply l

Cooling water supply had been verified when the pump was started, as per thet g l valve.

)

During the pump run, a large piece of debris became lodged in l

g l testing procedure.

The valve has been cleared and the line checked.

l g l the isolation valve.

I 3'

LLL*Jl so 7

8 9 48oWER oTHER $7ATUS Ots O RY CISCOVER 7 0ESCRIPTioN Desian l

lB[@l Operator observation [7

A Q W @ l010l0l@l a

Minii' '* " "

LoCATio,,o,..uA.E@

A!nviTy C=4 TINT AMouMTo..CTivin @ I 8 I z I @c.. u.sEL zJ@l N/A l

N/A l

.E u.s.o naso 'd ex,oss,.s o.,C.,,T,eN @

Nu...

l 8 1010l01@l:l@l N/A n.so,,N.'L,,uu'J,is otsCaiPfioN@

l Nuusta 8 lol0l01@l N/A 80 7

8 9 81 12 Loss 08 Cm OAM ACE To.aCILITv TV't CE5 cpi 8 TION I

8 LzJ@l N/A 60 7

4 9 10

~ac usE o~'v

"T.",C.,,T,

,,,u,'ISI LN N/A I

I!IIIIi!IIiiIi 2 o

" J2-643-8325

"}

80M10D&/f,tE,,,,R w. S. tacey

Attachment To LER 80-69/01T Beaver Valley Power Station Duquesne Light Company Docket No. 50-334 Failure Of The Motor-Driven Fire Pump [FP-P-1].

At 0851 hours0.00985 days <br />0.236 hours <br />0.00141 weeks <br />3.238055e-4 months <br /> on September 20, 1980, with the plant in Operational Mode 5, the Motor-Driven Fire Pump (FP-P-1] was started for a surveillance

  • test.

The Diesel-Driven Fire Pump (FP-P-2].was on clearance for piping modifications. At 1429 hours0.0165 days <br />0.397 hours <br />0.00236 weeks <br />5.437345e-4 months <br />, while (FP-P-1] was being shutdown after completion of the test, the pump was discovered running with oil running down the motor housing. The motor was smoking *and a small pool of oil was on the floor. The pump was immediately shut down.

Investigation revealed that cooling water had been lost to the upper motor bearing cooler. The valve lineup was verified to be correct.

A temporary fire pump was verified to be operational, this pump supplies 40% of the fire system design flow.

At 2050 hours0.0237 days <br />0.569 hours <br />0.00339 weeks <br />7.80025e-4 months <br />, [FP-P-2] was returned to service but the modification remained to be completed. An additional temporary pump has been made available and the modification completed.

The loss of cooling water to the motor bearing cooler was caused by debris lodged in the cooling water isolation valve upstream of the strainer.

When the fire pump was started as per the surveillance procedure, the cooling water flow was verified. During the pump run, a large piece of debris became lodged in the cooling water isolation valve'and, thus, stopped cooling water flow. This occurrence is considered to be random in nature.

The cooling water isolation valve has been cleared. The motor has not at this time been repaired. This is the second occurrence of this type (see Special Report dated March 5, 1980). The testing procedure requires that the couling water flow be ensured. No further corrective action is deemed necessary.