Text
.
/V $ / U
.
'
o
UNITED STATES
-
'g
O ['
NUCLEAR REGULATORY COMMISSION
g,
~,
p
REGION V
vg
1
1990 N. CALIFORNI A BOULEVARD
t,
g
% %#
,e
SUITE 202. WALNUT CREEK PLAZA
- e,,*
WALNUT CREEK, CALIFORNI A 94596
AUG 20 E0
Docket No. 50-206
Southern California Edison Company
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Dr. L. T. Papay
Vice President, Advanced Engineering
Gentlemen:
Subject: NRC Inspection - San Onofre Unit 1
This refers to the inspection conducted by Mr. L. Miller of this office on
June 30 - July 24,1980, of activities authorized by NRC License No. DPR-13,
and to the discussion of our findings held by Mr. Miller with Mr. Brunet and
other representatives of the Southern California Edison Company at the con-
clusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and obser-
vations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Appendix A.
These
items of noncompliance have been categorized into a level as described in our
correspondence to all NRC licensees dated December 31, 1974.
In accordance with
Section 2.790(d) of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations, documentation of findings of your facility security procedures are
exempt from disclosure; therefore Paragraph 3 to the enclosure to this letter,
your response to that item and the Addendum to the inspection report will not
be placed in the Public Document Room and will receive limited distribution.
Thi
. tice is sent to you pursuant to the provisions of Section 2.201, of
th
C's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
.
Section 2.201 requires you to submit to this office within twenty (20) days
of your receipt of this notice , a written statement or explanation in reply
including (1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further violations;
and (3) the date when full compliance will be achieved.
l
\\
80100so ll$
l
.
_
_ . _
_ _ - -
,
,
.
.
V
80
Southern California Edison Company
-2_
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20 days
of the date of this letter, requesting that such information be withh61d from
public disclosure.
The application must include a full statement of the
reasons why it is claimed that the information is proprietary. The applica-
tion should be prepared so that any proprietary information identified is
contained in an enclosure to the application, since the application without
the enclosure will also be placed in the Public Document Room.
If we do not
hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad to
discuss them with you.
Sincerely,
.
//..'/[ fib %,/
,.
t
J
. C ews, Chief
'
RfactorOperationsandNuclear
Support Branch
Enclosures:
1.
Notice of Violation - APPENDIX A
2.
IE Inspection Report
No. 50-206/80-21
cc w/o enclosures:
Mr. R. Dietch, Vice President, Nuclear Engineering & Operations
J. M. Curran, SCE - P. O. Box 128, San Clemente, CA 92672