Forwards IE Insp Repts 50-254/81-08 & 50-265/81-08 on 810504-08.No Noncompliance Noted
ML19351A170
Person / Time
Site: Quad Cities  
Issue date: 06/11/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19351A171 List:
References
NUDOCS 8106260176
Download: ML19351A170 (2)


See also: IR 05000254/1981008

Text

..

'

I

o

,

'o,,

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

l

o

8

I

REGION Ill

'

o

799 ROOSEVELT ROAD

o

GLEN ELLYN, ILLINOIS 40137

.....

JUN 1 1 1981

&

@

9

C)

P 1

5

Docket No. 50-254

,h f

.

-

Docket No. 50-265

S

6

iU i4

JUN 2 51981>

Commonwealth Edison Company

-

ATTN:

Mr. Cordell Reed

F W"M* 7 II

Vice President

Post Office Box 767

4

..Q,

Chicago, IL 60690

,,,

Gentlemen:

This refers to the routine safety inspection conducted by Mr. L. J. Haeter

of this office on May 4-8, 1981, of activities at Quad-Cities Nuclear Power

Station, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-29 and

No. DPR-30 and to the discussion of our findings with Mr. N. Kalivianakis

and other members of your staff at 'the conclusion of the inspection.

ihe inspection was an examination of activitics conducted under your license

as they relate to radiation safety and to compliance with the Cornission's

rules and regulations and with the conditions of your license. The inspec-

__

tion consisted of a selectiv'e examination of procedures and representative

records, observations, independent measurements, and interviews with

,

personnel.

No items of aoncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this ( .. ce to withhold such infor-

mation. Section 2.'90(b)(1) requires that any such applice.cion must be

accompanied by an affidavit executed by the owner of the information which

identifies the d ecument or part sought to be withheld, and which contains

a full statenant of the reasons on the basis which it is claimed that the

information should be sithheld from public disclosure. This section further

$f0

f }.m

1

-a

,$s t

{

e' C . ;'

u

)

.

qua2sq p79

-

.

. -

- -

.

. -

- -

.

Commonwealth Edison Company

-2-

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Reports No. 50-254/81-08

and No. 50-265/81-08

.

'

cc w/e'cl:

n

J. S. Abel, Director

-

of Nuclear Licensing

N. Kalivianakis,

-

Plant Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

,

i

l

i

-RIII

RIII

RIII ,/ '

RIII

l

WEd

OrrfN

Y

l

l

Hueter/db

Greger

Reiman

.

g joqgg

.

6/4/81

4

c

,

9 -

,-.n

.. ,,

__

,,.--, ,

.,,.9,..y

s,,

p.

-

,

,v.

, . , .