Forwards IE Insp Rept 50-370/81-07 on 810428-0501.No Noncompliance Noted
ML19350E854
Person / Time
Site: Mcguire
Issue date: 05/26/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19350E855 List:
References
NUDOCS 8106230588
Download: ML19350E854 (2)


See also: IR 05000370/1981007

Text

y

.-

A'

,

a nog n

'

D

UNITED STATES

o

-[

'

~ , ,

NUCLEAR REGULATORY COMMISSION

3

REGION 11

g,

f

101 MARIETTA ST., N.W., SUITE 3100

...../~

.

.

ATLANTA, o EoRotA 30303

MAY 2 61981

k

'

Ouke Power Company

'

ATTN:

W. O. Parker, Jr.

g

9[ JUll 2 2 '991 * C

Vice President, steam Production

-

'

-i

P . O. Box 2.' 78

-j

Charlotte, fC 23242

' c.au.s. ocumraeon [?

comosscw

.

Gentlemen:

\\A

e

$'jk .( .f

d tro

Subject: Report No. 50-370/81-07

This refers to the routine safety inspection conducted by Mr. T. D. Gibbons of

this office on April 23 - May 1,1981, of activities authori:ed by NRC Construc-

tion Permit No. CPPR-34 for the McGuire facility and to the discussion of'our

findings held with Mr. J. C. Rogers, Project Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed i n the

enclosed inspection report.

Within these areas, the inspection consisted c

selective examinations of procedures and representative records, interviews with

personnel, and cbservations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Roor..

If the report contains any information that you believe to be exempt from disclo-

sure uncer 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by

telephone within ten days from the date of this letter of your intention to file

a request for withholding; and (b) submit withia twenty-five days from the date

of this letter a written application to this office to withhold such information.

If your receipt of this letter has been delayed such that less the's seven days

are available for your review, please notify this office promptly so that a new

due date may be established. Consistent with section 2.790(b)(1), such applica-

tion must be accompanied by an affadavit executed by the own ' of the information

which identifies the document or cart thereof sought to be withheld, and a ftll

statement of the reasons on the bas'.s of which it is claimed tnat tne information

should be withheld from oublic disclosure. This section further requires the

statement to address with specificity the considerations listed in 10 CFR

2.790(b)(4). The information sought to be witnheld shall be incorporated as far

as possible into a separate part of the afficavit.

If we do not hear from you in

this regard within tne specified periods noted above, tne recort will be placec

in the Public Occument Room.

o

,

k

,

i

9

.r

-

,

7

Ouke Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

pb?.l:,

R. C.

wis, Acting Director

Division of lesident and

Reactor Project Insoection

Enclosure:

Inspection Report No. 50-370/81-07

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

,