Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-461/81-09. Addl Info Re as-built Cable Installation Requested
ML19350E813
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/19/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gerstner W
ILLINOIS POWER CO.
Shared Package
ML19350E814 List:
References
NUDOCS 8106230546
Download: ML19350E813 (2)


See also: IR 05000461/1981009

Text

-

.#

UNITED STATES

l'

'*t

NUCLEAR REZULATCRY COMMISSION

s

i

REGION lli

% . . . * g*[

7M ROOSEVELT ROAD

o,

GLEN ELLYN, ILLINOIS 60137

'lI SII

'

-

e

A

&

y eECWE

'

Docket No. 50-461

r~ an 2 3,h -o

' o 86 8, %

a

Illinois Power Company

-

ATTN:

Mr. W. C. Gerstner

\\Q

%:m ,%y

Executive Vice President

%A

500 South 27th Street

/

/,

Decatur, IL 62525

p;,

Gentlemen:

Thank you for your letter dated June 5, 1981, informing us of the action

taken concerning the two items of noncompliance which we brought to your

attention in Inspection Report No. 50-461/81-09 forwarded by our letter

dated May 4, 1981.

With respect to Item 1, your actions will be reviewed during a subsequent

inspection.

.

With respect to 'tems 2a and 2b, we do not consider the actions delineated

in your letter to be fully respodsive. While we acknowledge your request

for 90 days in which to prepare a comprehensive evaluation of the correc-

'

tive action to be taken in regards to these '.tems, your response did not

address the following:

(1) The corrective action taken to identify and control the failure of

the as-built PGCC cable installation to conform to the requirements

of the design criteria (NED0-10466-A).

(2) The measures taken to prevent recurrence of this noncompliance.

Therefore, we request that you submit a second letter to this office

within thirty days of the date of this letter, to respond to our concerns

regarding Items 2a and 2b.

Your response should be submitted under oath

or affirmation and should include for this item of noncompliance:

(1)

$Y

81002307 %

.

.

=

,

d

Illinois P;wer Company -

-2-

jg '. g} Jgg,-

.

corrective action taken and the results achieved; (2) corrective action

to be taken.to avoid further noncompliance; and (3) the date when full

compliance will be achieved.

Your cooperation with us is appreciated.

Sincerely,

C. E. Norelius, Acting Director

Division of Engineering and Technical

Inspection

,

cc w/ltr dtd 6/5/81:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

Gary N. Wright, Deputy Director

Randall L. Plant, Prairie

Alliance

th

.

.

.

,

.

.

e

- RI(I

RIII

RIIJ

RIII

RP Le7

\\-

t Hp,

dj(

sr,.

t

/

,

Sp asard/so

Wil'11ams

Rei ann

Gardner

11u

.

- 6

/81

-

G -I $f

},)

'

.

- + - -

e