Responds to NRC Re Violations Noted in IE Insp Rept 50-461/81-09.Corrective Actions:Qc Personnel Given Addl Training in Class IE Electrical Cable Installation Procedure.Refutes Noncompliance Items 2a & 2b
ML19350E818
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/05/1981
From: Koch L
ILLINOIS POWER CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19350E814 List:
References
0981-L, 981-L, Q37-81(06-05)-L, Q37-81(6-5)-L, U-0243, U-243, NUDOCS 8106230550
Download: ML19350E818 (2)


Text

c - -

I 4

ILLIN0/S POWER COMPANY CLINTON POWER STATION, P.O. BOX 399, CLINTON, ILLINOIS 61727 0981-L U-0243 Q37-81(06-05)-L June 5, 1981 Mr. C. E. Norelius, Acting Director Division of Engineering and Technical Engineering U. S. Nuclear Regulatory Commission Region III 799 Roosuvelt Road Glen Ellyn, Illinois 60137

Dear Mr. Norelius:

This is in response to your Notice of Violation and Inspection Report Number 50-461/81-09.

Illinois Power Company's response for two items of noncompliance cited is as follows:

1.

T.nstructions. Procedures and Drawings:

The Notice of Violation states, in part:

" Contrary to the above, as of April 9, 1981, the electrical contractor's Power Generation Control Complex (PGCC) interconnecting cable pulling activities were not accomplished in accordance with paragraph 5.2.1(f) of Baldwin Associates Procedures 3.3.7 which states, " Obstructions are cleared from cable pan /PGCC floor ducts, allowing cables to be pulled free of any sharp edges within the ducts."

Sharp edges in the PGCC floor duct were observed at three locations resulting in damage to two cables."

The following corrective action is being taken in this matter.

Damage to the above cited cables has been documented on a Noncon-formance Report as noted by the inspector in your report (50-461/81-09).

Disposition of the nonconforming condition will be handled in accordance with normal design control practices.

Most of the cable pulling activities for the PGCC floor ducts have been completed.

However, an inupection effort is presently underway to identify all floor c.ucts in which rubber edge guards are missing or are inadequate.

Where these guards are found to be missing or inadequate, they are being replaced in order to achieve a final equipment condition consistent with the approved design.

In order to prevent future noncompliances of this nature, cognizant Quality Control personnel have received additional training in the Class lE Electrical Cable Installation Procedure which addresses inspections for protection of cable from sharp edges in this and other cable pulling activities.

taloo nc550 m, o asi

r ~;

..Mr 1C. E. N roliua U-0243 Q37-81(06-05)-L June 5, 1981 Page 2 l[t is expected that:a11' corrective action to this item of noncompliance will be completed by June 30, 1931 and we will be in full compliance at that time.

2.

Design' Control The Notice of. Violation states, in part:

" Contrary to the above, as of April 10, 1981, the following instances of failure to maintain the required separation criteria were identified.

a.

The non-divisional utility power cable which connects Termination Cabinet H13-P709, Bay B, to panel H13-P672 and which is enclosed in flexible conduit is routed in a division 4 floor duct containing division 4 cables.

b.

The cable'for the smoke detector and fire detector located in a division 2 floor duct at coordinates X-008, Y-015 in unit G of the PGCC floor duct complex and which is enclosed in flexible conduit is routed from the division 2 floor duct into a division 4 floor duct from which it enters a non-divisional f.loor duct.

The above described concerns have been referred to General Electric, the responsible design organization.

General Electric, based upon preliminary evaluations, presently considers that the current design is acceptable and will provide justification for this position within 90 days.

Illinois. Power will review this justification and provide the Commission a written supplement to this letter regarding this issue.

I hereby affirm that the above information contained in this letter is correct to the best of my knowledge.

Sincerely, L

fo{

L.

. Koch Vice President