ML19350E745

From kanterella
Jump to navigation Jump to search
Forwards IE Safety Insp Repts 50-348/81-10 & 50-364/81-13 on 810429-0501.No Noncompliance Noted
ML19350E745
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/02/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19350E746 List:
References
NUDOCS 8106230490
Download: ML19350E745 (2)


See also: IR 05000348/1981010

Text

...

.,

,

/

UNITE 3 STATES

8'

7.

NUCLEAR REGULATORY COMMISSION

'

3

I

REGION ll

g ' ' * " g[

101 MAR'IETTA $7 N.W..SulTE 3100

{

ATLANTA, GEORGaA 30303

.

JUN 0 21981

k

,

by f~R/B' BNM

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

-

JUN 2 21981 * -

Vice President-Nuclear Generation

E

i

u.s. wam m.aum

~

'

" 55 "

'

P. O. Box 2641

'

JU

Birmingh'm, AL 35291

O}

6 //

Gentlemen:

9

Subject: Report Nos. 50-348/81-10 and 50-364/81-13

This refers to the ' routine safety inspection conducted by Mr. R. L. Fiedler of

this office on April 29 through May 1,1981, of activities authorized by NRC

License Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our

findings held with Mr. W. G. Hairston, III, Plant President, at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection recort.

Within these areas, the inspection consisted of

selective examinations of roceduras and representative records, interviews with

personnel, and observations by the inspector.

.

Within the scope of this inspection, no violations or deviations we.re * disclosed.

,

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your inten-

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

such information. If your receipt of this letter has been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis af which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the aff ? davit. If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

f 9i

i

8306230Yf0

k

9

.

_ . _

--

,

,.; . .

Jt'N 0 21981

,

.

Alabama Power Company

2

Should you.have any questions'concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-

_s.

4?. dC.

Oss

R. C.

ewis, Acting Director

Division of Resident and

Reactor Project Inspection

Enclosure: Inspection Report Nos.

50-348/81-10 and 50-364/81-13

.

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, Manager-Nuclear Generation

0. D. Kingsley, Jr., Manager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Operations

Quality Assurance

. e,

W. G.,Hairston III, Plant Manager

'

W. C. Petty, Manager-Quality Assurance

'

' (Design and Construction)

R. E. Hollands, Jr. , QA Supervisor

.

.

4

,

i

'

'

.

.

- - -