ML19350E745
| ML19350E745 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/02/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19350E746 | List: |
| References | |
| NUDOCS 8106230490 | |
| Download: ML19350E745 (2) | |
See also: IR 05000348/1981010
Text
...
.,
,
/
UNITE 3 STATES
8'
7.
NUCLEAR REGULATORY COMMISSION
'
3
I
REGION ll
g ' ' * " g[
101 MAR'IETTA $7 N.W..SulTE 3100
{
ATLANTA, GEORGaA 30303
.
JUN 0 21981
k
,
by f~R/B' BNM
Alabama Power Company
ATTN: Mr. R. P. Mcdonald
-
JUN 2 21981 * -
Vice President-Nuclear Generation
E
i
u.s. wam m.aum
~
'
" 55 "
'
P. O. Box 2641
'
JU
Birmingh'm, AL 35291
O}
6 //
Gentlemen:
9
Subject: Report Nos. 50-348/81-10 and 50-364/81-13
This refers to the ' routine safety inspection conducted by Mr. R. L. Fiedler of
this office on April 29 through May 1,1981, of activities authorized by NRC
License Nos. NPF-2 and NPF-8 for the Farley facility and to the discussion of our
findings held with Mr. W. G. Hairston, III, Plant President, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection recort.
Within these areas, the inspection consisted of
selective examinations of roceduras and representative records, interviews with
personnel, and observations by the inspector.
.
Within the scope of this inspection, no violations or deviations we.re * disclosed.
,
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
such information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis af which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the aff ? davit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
f 9i
i
8306230Yf0
k
9
.
_ . _
--
,
,.; . .
Jt'N 0 21981
,
.
Alabama Power Company
2
Should you.have any questions'concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
_s.
4?. dC.
Oss
R. C.
ewis, Acting Director
Division of Resident and
Reactor Project Inspection
Enclosure: Inspection Report Nos.
50-348/81-10 and 50-364/81-13
.
cc w/ encl:
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr., Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsley, Jr., Manager, Nuclear Engineering
and Technical Services
J. W. McGowan, Manager-Operations
Quality Assurance
. e,
W. G.,Hairston III, Plant Manager
'
W. C. Petty, Manager-Quality Assurance
'
' (Design and Construction)
R. E. Hollands, Jr. , QA Supervisor
.
.
4
,
i
'
'
.
.
- - -