ML19350E312
| ML19350E312 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/06/1981 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML19350E313 | List: |
| References | |
| NUDOCS 8106170290 | |
| Download: ML19350E312 (2) | |
See also: IR 05000445/1981007
Text
y-
t
g# %'e,
UNITED STATES
l
[ -)
NUCLEAR REGULATORY COMMISSION
,,
,, p
.j
RI GION IV
.
611 RYAN PLAZA DRIVE. SulTE 1000
% ,. ,
/
APUNG*.ON. TEXAS 76011
,
May 6, 1981
f 75
-
-
In Peply Refer To:
g,
l h ({
[
'
kei 50-445/Rpt. 81-07
.
i
q
50-446/Rpt. 81-07
, . -
if
JUN 1 G 1981*
.
{
v.s.
w oes
Texas Utilities Generating Company
%
/
ATTN: Mr. R. J. Gary, Executive Vice
y
President and General Manager
2001 Bryan Tcwer
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert and L. E. Martin
of our staff during the period April. 6-10,1981, of activities authorized by NRC
Construction Pennits CPPR-126 and CPPR-127 for the Comanche Peak facility,
Units 1 and 2, and to the discussion of our findings with Mr. R. G. Tolson of
your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
. selective examination of procedures and representative recr
, interviews
with personnel, and observations by the inspectors.
Within the scope of the inspection, no violations or deviations were identified.
We have also examined actions you have taken with regard to previously identi-
fied inspection findings.
The status of these items is identified in para-
graph 2 of the anclosed report.
l
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
'
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe to
be exempt fmm disclosure under 10 CFR 9.5(a)(4), it is necessary that you
(a) notify ,this office by telephone within 10 days trom the date o'f this letter
-
of your intention to file a request for withholding; and (b) submit within 25
days. fmm the date of this letter a written application to this office to
withhold such infonnation.
If your receipt of this letter has been delayed such
.
that less than seven days are available for your review, please notify this
Consistent with
office promptly)so that a new due date may be established.Section 2.790(b (1), any su
executed by the owner of the information which identifies the document or part
sought to be withheld, and which contains a full statement of the reasons on
the basis which it is claimed that the information should be withheld from
public disclosure.
This section further req'uires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The infonnation
I
sought to be withheld shall be incorporated as far as possible into a separate
8 3 0 617 0 '),,,,%
-.
.
---
.
_
-.
.
.
._ _
'
.
,
'
Texas Utilities Generating Company
2
May 6, 1981
part of the affadavit.. If we .do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this inspection', we will be pleased
,
to discuss them with you.
,.-
Sincerely,
,
~ JB%w
-
G. L. Madsen, Chief
Reactor Projects Branch
Enclosure:
IE Inspection Report 50-445/Rpt. 81-07
50-446/Rpt. 81-07
cc: w/ enclosure
Texas Utilities Generating Company
ATTN: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
-
Dallas, Texas 75201
,
e
e
O
.
..
4
, , - + - - - -. - ~ - - , - , ,
. , . - , - . . . . . .
-..n.
,. - . . - . - -,-
--
,.n..
,-,- --, - , ,, - . . - . - , -
-- , -
- - - , , - , . ,
. . _ , - , . , - . , - - . .