PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET R[

c P.O. BOX 8699 PHILADELPH!A. PA.19101 f$.

A) 0 0fl 2 6 r

e.gk gg N P

saisi e4i.4ooo J

June 12, 1981 p

'ou t s

Director Office of Management Information &

Program Analysis U.S. ;bclear Aegulatory Coassission Washington, CC 20555

SUBJECT:

Peach Gottaen Atomic Power Station Monthly Operatiz Report Gentlemen:

Attached is the Monthly Operating ieport for Peach 3ottom Units 2 and 3 for the conth of day 1961.

7 Very trulf yours, M. J. Cconey Ouperintendent Generation Division / Nuclear FAR:cas Attachment cc Mr. Soyce H. Grier Girector Director, Region I

]ffice of Insoection 5 Enforcement Of fice of Inspection & Enforcement u.3. Nuclear.segulatory ;ccani ssion U. O. Nuclear Regulatory somaission

=ashington, CC 20555 631 Park Ave m King of Prussia, PA 19406 SGkl hh hhh.

'810 617 0 //f 7#

f

1 Peach Bottcm Atomic Power Station Narrative ';umnary of Operating Experiences May 1981 UNIT 2 OPERATIONS The unit remains shutdown following failure of the 2B Recirculation Pump seals and motor bearings. The motor has been replaced and work is underway to remove a bend in the pump shaft.

During the month, annual inspections were performed on three of the four emergency diesel generators. The post-TMI

" Lessons Learned" items which were committed to be done by the first of July 1981 have been completed during this outage.

Headway was also gained on other " Lessons Learned" iterns due January 1, 1982.

UNIT 3 OPERATIONS The unit remains chutdown to acconimoda'te refueling, modifica-tions and maintenance work. The Suppression Pool modifications are approximately 60% complete. Control rod drfve changeout and LPRM replacement are conplete. The Feedwater nozale machining is essentially complete with fitup of the last two spargers remaining.

1 i

Replacement of the in-drywell Core Spray piping, removal of the Recirculation Pump discharge 4" bypass line and replacement of certain off-gas system piping continues.

Inspection of the HPCI system components subjected to water and oil insnersion in April is in progress.

l l

i I

l' -.-