Text
-
>.t i uneoAe.+. a.' ; A.
DOCKET No. 50 - 277 DATE JUNE 12, 1981 O
COMPLETED 6Y PMILADFLPHIA ELFCTRIC COMPANY W.M.ALDEN ENGINEER-IN-4NARGE NUCLEAR SFCTION GENERA T!0N DIVISION-N'JCLE AR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAME: PFACH BOTTOM UNIT 2 1 NOTES: THIS UNIT EXPERIENCED l
l l
- 2. REPORTING PER!c0 MAY, 1981 1
ONE MAJOR DUTAGE.
I l
l
- 3. LICENSED THERMAL POWER (MWTit 1293 I
I l
l
- 4. NAMEPLATE RATING (GROSS MWE) 1152 I
I l
l
- 5. DESIGN ELECTRICAL RATING (NET MWE)*
1065 l
l 1
I
- 6. MAXIMUM DE*ENOABLE CAPACITY (GROSS MWEl* 1098 l
l I
l l
- 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWE18 1051 l
l 8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBFR 3 THROUGH 7) SINCE LAST REPORT, GLVF REASONS:
- 9. PONER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEls
- 10. RE ASDNS FOR RE STRICTIONS, IF ANY:
THIS MONTH YR-TC -0 A TE CUMULATIVE
- 11. HOU45 IN REPORTING PERIOD 744 3,623 60,551
- 12. NUMBER OF HOURS RE ACTOR WAS CRITICAL 0
2,640.1 45,192.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 0.0 2,507.0 44,109.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 8,149,370 128,570.442
- 17. GROSS ELECTRICAL ENERGY GENFRATED (MWH) 0 2,745,600 42,358,700
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
-4,205 2,650,450 40,610,114
- 19. UNIT SERVICE FACTOR 0.0 71.7 72.8
(
- 20. UNIT AVAILABILITY FACTOR 0.0 71.7 72.8
- 21. U417 CAPACITY FACTOR (USING MOC NET) 0.0 69.6 63.8 l
l
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 68.7 63.0
- 23. UNIT FORCEO 09TAGE R ATE 100.0 28.3 7.7
- 24. SHUTOOWNS SCHEDULED DVER NEXT 6 MON 1;'S (TYPE, DATE, AND DURATION OF EACH):
L
- 25. IF SHUTDOWN AT END OF AEPORT PERIOD, ESTIMATED OATE OF STARTUP: Unit 2, June 22, 1981 1,
L
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED ll
?.
INITIAL CRITICALITY
- [
INITIAL ELECTRICITY
?
8106170/47 COMMEPCIAL OPERATION 0 - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY C3MMISSION REPORTS.
g
1 l
'* F. 9 88 I opi"Aiti;r. HA:
DOCNET NO. 50 - 278 j
DATE JUNG 12, 1981 i
COMPLETED BY PHILADFLPHIA FLFCTRIC COMPAfiY I
W.M.ALDFN E NGINE ER-IN-CH A R GE NUCLEAR SFCTION GENERATION DIVISION-NUCLFAR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAMFt PEACH BOTTOM UNIT 3 l NOTES: THIS UNIT IS DOWN FOR l
I I
- 2. REPORTING PER100:
MAY, 1961 1
REFUELING AND MAINTENANCE.
1 1
I
- 3. LICENSED THERMAL POWER (MWT):
3293 I
I 1
I
- 4. NAMEPLATE RATING (GROSS MWE):
1152 l
1 1
I
- 5. DESIGN ELECTRICAL 4ATING INET MWE):
1065 I
i 1
I
- 6. MAXIMUM DEPENDA8LE JAPACITY (GROSS MWE): 1098 i
1 1
I l
- 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls 1035 l
I
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 73 SINCE LAST REPORT, GIVE REASt 9 POWER LEVEL TO WHICH RESTRICTED, I F AN Y (NET MWEls p
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE D
- 11. HOURS IN REPORT!4G PERIOD 744 3,623 56,447
?
h
- 12. NUMBER OF HnuRS REACTOR WAS CRITICAL 0
1,547.7 43,709.9
- 13. REACTOR RESkRVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENER ATOR ON-LINE 0.0 1,541.0 42,566.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.b
{
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4,932,216 121,775.165
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHI O
1,643,900 39,745,940 I
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)
-4,205 1,576,938 38,15$.501 19 UNIT SERVICE FACTOR 0.0 42.6 75.4
- 20. UNIT AVAILARILITY FACTOR 0.0 42.6 "I'.
4
- 21. UNIT CAPACITY FACTOR ( UF IFG MDC NE T )
0.0 42.1
<^.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 40.9 63.5
- 23. UNIT FORCED OUTAGE RATE 0.0 1.1
$$3 24 5HUTDOWNS SCHEDULED OVER NEXT. 6 MONTHS (TYPE, DATE, AND DURATION OF EACHIS REFUELING / MAINTENANCE, 3/06/81, TWENTYTHREE WEEKS
- 25. IF SHUTDOWN AT END OF REPORT PERICO, ESTIMATED DATE 05 STARTUP Unit 3, August 15, 1981
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION 38 FORECAST ACHIEVED INITIAL CRITICALITY j
INITIAL ELECTRICITY CDMMERCIAL OPERATION e - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY ""*'JL???P" 70MMISSION
i AVFDAGE DAILY UNIT I'0WE R LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE JUNE 12, 1981 COMPANY PHILADFLPHIA FLECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 MONTH MAY 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWF-NET) 5 1
0 17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
AVERAGF DAYLY UNIT,50WER LFVFL i
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JUNF 12, 1981 COMPANY PHILADELPHIA FLECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION-GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022
=-
MONTH MAY 1981
_..._ _-_ _ DAY __ AVERAGE _ DAILY.. POWER _ LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
l 6
0 22 0
7 0
23 0
i l
8 0
24 0
9 0
25 0
l 10' O
26 0
11 0
27 0
12 0
28 0
13 0
~~
29 0
t 14 0
30 0
15 0
31 0
16 0
i e
1
..-..--..-.....-------c.,,--,.
4 6
a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 27T UNIT NAME *EACH 80TTOM UNIT 2
'l DATE JUNE 12, 1981 j
REPORT MONTH MAYe 1981 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY 4
W.M.ALDEN EN GINE E R-IN-C HA R GE NUCLEAR SECTION GENERATION DIVISION-NUCLEdR TELEPHONE (2151 841-5022 i
... _ = ___ -
i i
I I
l METHOD OF l LICENSEE ISYSTEMICDNPONFNTl CAUSE AND CORRECTIVE i
I ITYPElDURATIONIREASONISHUTTING DOWN1 EVENT l CODE I CODE I AC140N 10 NO.1 DATE I (118 (HOUR $ll (2) I REACTOR (3) l REPORT e 1 (4) l (5) l PREVENT RECURRENCE g
g I
==
I I
I i
l 1
I I
I 13 l 810501 1 F l 744.0 l
A l 1
1 NA I C8 l MOTORX l CONTINUATION OF OUTAGE DUE TO 29 REACTOR I
I I
I l
I I
l RECIRCULATION PUMP MOTOR SEARING FAILURE.
i 1
1-1 I
I I
I I
l l
I 74'.0 l
l l
I l
l (1)
(21 (3) 14)
F - FORCED REA$0N METHDD EkHIBIT G - INSTRUCTIDNS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - NANUAL FOR PREPARAT!DN OF DATA S - MAINTENANCE OR TEST 2 - M ANUAL SCR AM.
ENTRY $HEETS FOR LICENSEE b'
d C - REFUELING 3 - AUTDMATIC SCRAM.
EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE INUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION i
F - ADMINIST.tATIVE I
(5)
G - OPERATIGNAL ERROR (EXPLAIN)
H - OTHER(EXPLAINI EXHIBIT I - SAME SOURCE i
l 4
d
/
I h
)
~
)
k UNIT SHUTDOWNS AND POWER REDUCTIDNS DOCKET NO. 50 - 278
=
UNIT NANE PEACH BOTTON UNIT 3 i
DATE JUNE 12, 1981
)
REPORT MONTH MAYe 1981 COMPLETED BY PHILA0FLPHIA ELECTRIC COMPANY
)
W.N.ALDEN ENGINE E R-IN-C HA RGE NUCLEAR SECTION
)
GENERA TION DIVISIDN-NUCLEAR TELEPHONE (215) 841-5022
=
)
l l
l l
l NETH00 0F 1 LICENSEE ISYSTEMICOMPDNENTl CAUSE AND CORRECTIVE l
lTYPEIDURATIONIREASONISHUTTING DOWNI FVENT l CODE I CODE l ACTIDN TO NO.]
DATE i (111 (HOUR $ll 125 l REACTOR (3) l REPORT 8 l (4) I (51 1 PREVENT RECURRENCE
)
~
l I
i l
l I
l i
I O l 810501 l 5 l 744.0 l
C l I
l NA l RC l FUELXX l CONTINUATION 08 REFUELING DUTAGE.
)
i I
I ----- 1 I
I I
l I
l l
l 744.0 I
I l
l l
l l
1 (Il (2) i (3)
(4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURF (EXPLAIN) 1 - NANUAL FOR PREPARATION OF DATA B - NAINTENANCE OR TEST 2 - NANUAL SCRAN.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTDMATIC SCRAM.
EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE INUREG-01613 E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE
(
(5)
G - OPERATIONAL ERROR (EXPLAINI H - OTHERIEXPLAIN)
EXHIBIT I - SAME SOURCE S
e 4
[
Docke t. No. 93-2'/*/
Attachmont to Monthly Cporating Roport For May 1981 l
REFUELING TNFORMATION i
i l
1.
Name of facility:
i Peach Botton Unit 2 2.
Dhadulad date for next refnaling shutdown:
January 2, 1982 3
+hadulad date for restart following rei'ushng:
February 13, 1982 14 Will refnaling or resumption of operation thereafter require a t=ahniaal specification change or other licenso amendmont?
Yes.
If answer is yes, what,'in ganam1, will those bo?
Taahniad Spooifications to maan==adate roload fuel.
Modifications to reactor coro operating limita are orpootod.
5 Wn'ed date(s) for submitting proposed 11conoing action and supporting information:
' November 13, 1981 6.
Important 14aan=4ng canaidarations associated with rofuohng, o.g.,
new or different fuel design or supplier, unrot10wod dosip or perfozmance analyala methods, sian4P4aant changos in fuel doni p,
new operating procedures None orpectod.
7 N n"-x r of fuel assemblica (a) in the coro and (b) in tho upont h 1 atorngo Pool:
(a Core - 7 % Fuel Assemblica (b
h l Pool - 910 h l Assemblica 8.
h present liconned upont fuel pool storago capacity and tho ui::,o of any increase in licensed storage capacity that has boon roquouted or la plannod, in number of fuel asacablion:
b upont M 1 pool otcrage onpacity has boon roliconaod for 2816 h 1 accomb11os.
9 h pzo,jooted date of the last rol'nal 4ng that can be discharbd to the upunt h1 pool auuusing the procent liconced capacity.
September, 1990
~.
%c4ut, ho. $0-278 Attachment to Monthly Operating Roport For May 1981 REWELING INMRKATION 1.
Name of facility:
Peach 3otton Unit 3 2.
+h-anlad date for next zufueling shutdowns Refueling Began March 6, 1981 3
h %i"'~1 date for restart following refueling:
Ausuat 14,1981
- 4. Will refna'4"r or resumption of operation thorocfter roquire a t-^hnia-1 s==aifi^etion change or other licenso==andmant?
Yes.
If answer la yes,' what, in genazal, will thoso bo?
Technical opocification changou to aco~"^1ato roload bl.
Modifications to reactor oore operating limito aro expootod.
5-Scheduled date(s) for submitting proposed lionnaing action and supporting information:
Submitted March 30, 1981 6.
Important lia-a-4=e - G-m tions ---^^tetod with rofueline, o.g.,
new or different fuel design or supplier, unroviewod donign or perfoznance analysis methods, si6nificant changon in ruol douign, now opozating procedurou:
None expected.
7.
N number of fumi accomblion (a) in W coro ami (b) in h upunt fuel atcrage pools a
coro - 764 m l An - 149u b
Puol Pool - 712 W i=tod Puel Ascombliou 8.
h present '4--M opont fuel pool otozago capacity and the uizo of any increase in 11aan"~2 storage capacity that huu boon xvquuuted or la plannod, in numbor of fuel asuomblion:
The upont fuel pool utorage capucity huu buon ruliuuuuud for 2816 fuel acuumblico.
9 The projected date of the last refueling that con be diochargod to W opont fuel pool auuumine the prooont licenced capacity:
September, 1991
- -.