ML19350E214

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1981
ML19350E214
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/12/1981
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19350E209 List:
References
NUDOCS 8106170169
Download: ML19350E214 (8)


Text

- --

uneoAe.+. a .' ; A . >.t i DOCKET No. 50 - 277 DATE JUNE 12, 1981 .

l O COMPLETED 6Y PMILADFLPHIA ELFCTRIC COMPANY W.M.ALDEN ENGINEER-IN-4NARGE NUCLEAR SFCTION GENERA T!0N DIVISION-N'JCLE AR TELEPHONE (215) 841-5022 OPERATING STATUS

1. UNIT NAME: PFACH BOTTOM UNIT 2 1 NOTES: THIS UNIT EXPERIENCED l l l
2. REPORTING PER!c0 MAY, 1981 1 ONE MAJOR DUTAGE.

I l l

3. LICENSED THERMAL POWER (MWTit 1293 I I l l
4. NAMEPLATE RATING (GROSS MWE) 1152 I I l l
5. DESIGN ELECTRICAL RATING (NET MWE)* 1065 l l 1 I
6. MAXIMUM DE*ENOABLE CAPACITY (GROSS MWEl* 1098 l l

, I l l 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWE18 1051 l l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBFR 3 THROUGH 7) SINCE LAST REPORT, GLVF REASONS:

. 9. PONER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEls

10. RE ASDNS FOR RE STRICTIONS, IF ANY:

THIS MONTH YR-TC -0 A TE CUMULATIVE

11. HOU45 IN REPORTING PERIOD 744 3,623 60,551
12. NUMBER OF HOURS RE ACTOR WAS CRITICAL 0 2,640.1 45,192.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 0.0 2,507.0 44,109.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 8,149,370 128,570.442
17. GROSS ELECTRICAL ENERGY GENFRATED (MWH) 0 2,745,600 42,358,700
18. NET ELECTRICAL ENERGY GENERATED (MWH) * -4,205 2,650,450 40,610,114
19. UNIT SERVICE FACTOR 0.0 71.7 72.8

( 20. UNIT AVAILABILITY FACTOR 0.0 71.7 72.8

, 21. U417 CAPACITY FACTOR (USING MOC NET) 0 .0 69.6 63.8 l

l 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 68.7 63.0

!. 23. UNIT FORCEO 09TAGE R ATE 100.0 28.3 7.7

24. SHUTOOWNS SCHEDULED DVER NEXT 6 MON 1;'S (TYPE, DATE, AND DURATION OF EACH):

L 25. IF SHUTDOWN AT END OF AEPORT PERIOD, ESTIMATED OATE OF STARTUP: Unit 2, June 22, 1981 1,

L 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED ll

?.

INITIAL CRITICALITY

[ INITIAL ELECTRICITY

? 8106170/47 COMMEPCIAL OPERATION g 0 - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY C3MMISSION REPORTS.

1 l

opi"Aiti;r. HA: *

, , '* F . 9 88 I DOCNET NO. 50 - 278 j DATE JUNG 12, 1981 i

COMPLETED BY PHILADFLPHIA FLFCTRIC COMPAfiY I W.M.ALDFN E NGINE ER-IN-CH A R GE NUCLEAR SFCTION GENERATION DIVISION-NUCLFAR TELEPHONE (215) 841-5022 OPERATING STATUS .

1. UNIT NAMFt PEACH BOTTOM UNIT 3 l NOTES: THIS UNIT IS DOWN FOR l I I
2. REPORTING PER100: MAY, 1961 1 REFUELING AND MAINTENANCE. 1

- - 1 I

3. LICENSED THERMAL POWER (MWT): 3293 I I 1 I
4. NAMEPLATE RATING (GROSS MWE): 1152 l 1

- 1 I

5. DESIGN ELECTRICAL 4ATING INET MWE): 1065 I i 1 I
6. MAXIMUM DEPENDA8LE JAPACITY (GROSS MWE): 1098 i 1

-- 1 l I

7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls 1035 l I
8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 73 SINCE LAST REPORT, GIVE REASt p 9 POWER LEVEL TO WHICH RESTRICTED, I F AN Y (NET MWEls
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE D

?

11. HOURS IN REPORT!4G PERIOD 744 3,623 56,447 h 12. NUMBER OF HnuRS REACTOR WAS CRITICAL 0 1,547.7 43,709.9
13. REACTOR RESkRVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENER ATOR ON-LINE 0.0 1,541.0 42,566.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.b

{ 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4,932,216 121,775.165

17. GROSS ELECTRICAL ENERGY GENERATED (MWHI O 1,643,900 39,745,940 I . . . .
18. NET ELECTRICAL ENERGY GENERATED (MWH) * -4,205 1,576,938 38,15$.501 19 UNIT SERVICE FACTOR 0.0 42.6 75.4
20. UNIT AVAILARILITY FACTOR 0.0 42.6 "I'. 4
21. UNIT CAPACITY FACTOR ( UF IFG MDC NE T ) 0.0 42.1 <^.3
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 40.9 63.5
23. UNIT FORCED OUTAGE RATE 0.0 1.1 $$3 24 5HUTDOWNS SCHEDULED OVER NEXT. 6 MONTHS (TYPE, DATE, AND DURATION OF EACHIS REFUELING / MAINTENANCE, 3/06/81, TWENTYTHREE WEEKS
25. IF SHUTDOWN AT END OF REPORT PERICO, ESTIMATED DATE 05 STARTUP Unit 3, August 15, 1981
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION 38 FORECAST ACHIEVED INITIAL CRITICALITY j INITIAL ELECTRICITY CDMMERCIAL OPERATION e - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY ""*'JL???P" 70MMISSION . _ . _

i AVFDAGE DAILY UNIT I'0WE R LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE JUNE 12, 1981 COMPANY PHILADFLPHIA FLECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 MONTH MAY 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWF-NET) 5 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 .

12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 l

AVERAGF DAYLY UNIT ,50WER LFVFL i

DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JUNF 12, 1981 COMPANY PHILADELPHIA FLECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION-GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022

=- ____

MONTH MAY 1981

_..._ _-_ _ DAY __ AVERAGE _ DAILY.. POWER _ LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 l 6 0 22 0 i 7 0 23 0 l

8 0 24 0 9 0 25 0 l 10' O 26 0 11 0 27 0 -

12 0 28 0

~~

13 0 ' - -

29 0 t

14 0 30 0 15 0 31 0

! 16 0 i

e 1

, - - . . - - . , . . , - - . . _ . . , , . , , , , , - , . . . - . . . . . . . . , . . - - . . ..-..--..-.....-------c.,,--,. . . . - - - . . . . . - - - . , , , . , - .

. 4 ,

6 a

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 27T UNIT NAME *EACH 80TTOM UNIT 2

'l .__ __- _. _.-

DATE JUNE 12, 1981 j,

REPORT MONTH MAYe 1981 4

COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN EN GINE E R-IN-C HA R GE NUCLEAR SECTION GENERATION DIVISION-NUCLEdR TELEPHONE (2151 841-5022 i _.--_ - ---

__ . . . _ = ___ - -

i i i I I I l METHOD OF l LICENSEE ISYSTEMICDNPONFNTl CAUSE AND CORRECTIVE ITYPElDURATIONIREASONISHUTTING DOWN1 EVENT l CODE I CODE I AC140N 10 NO.1 DATE I (118 (HOUR $ll (2) I REACTOR (3) l REPORT e 1 (4) l g (5) l PREVENT RECURRENCE I == ._- g I I I i l -

1 I I I 13 l 810501 1 F l 744.0 l A l 1 1 NA I C8 l MOTORX l CONTINUATION OF OUTAGE DUE TO 29 REACTOR

! I I I I l I I l RECIRCULATION PUMP MOTOR SEARING FAILURE.

i 1 1- 1 I I I I l l I I 74'.0 l l l I l l (1) (21 (3) 14)

F - FORCED REA$0N METHDD S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) EkHIBIT G - INSTRUCTIDNS

' 1 - NANUAL FOR PREPARAT!DN OF DATA S - MAINTENANCE OR TEST 2 - M ANUAL SCR AM.

d C - REFUELING ENTRY $HEETS FOR LICENSEE b' 3 - AUTDMATIC SCRAM. EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE INUREG-0161) '

E - OPERATOR TRAINING + LICENSE EXAMINATION i F - ADMINIST.tATIVE I G - OPERATIGNAL ERROR (EXPLAIN) (5)

H - OTHER(EXPLAINI

EXHIBIT I - SAME SOURCE i

l 4

d

/ I h

)

~

) k UNIT SHUTDOWNS AND POWER REDUCTIDNS DOCKET NO. 50 - 278

=

UNIT NANE PEACH BOTTON UNIT 3 i

DATE JUNE 12, 1981

) REPORT MONTH MAYe 1981 COMPLETED BY PHILA0FLPHIA ELECTRIC COMPANY

) W.N.ALDEN ENGINE E R-IN-C HA RGE NUCLEAR SECTION

) GENERA TION DIVISIDN-NUCLEAR TELEPHONE (215) 841-5022

.- .- = .

l . ___

) l l l l l NETH00 lTYPEIDURATIONIREASONISHUTTING DOWNI 0F 1 LICENSEEFVENT ISYSTEMICOMPDNENTl CAUSE AND CORRECTIVE NO.] l CODE I CODE l ACTIDN TO

)~

. DATE... i (111 (HOUR

$ll 125 l REACTOR (3) l REPORT --

8 l (4) I (51 1 PREVENT RECURRENCE l I i l l Ol 810501 l 5 l 744.0 l C l I I l i I i l NA

) I I ----- 1 I I l I

RC l FUELXX l l CONTINUATION 08 REFUELING DUTAGE.

l l l 744.0 I I

I l l l l l

1 (Il (2) i (3) (4)

F - FORCED REASON S - SCHEDULED METHOD A - EQUIPMENT FAILURF (EXPLAIN) EXHIBIT G - INSTRUCTIONS 1 - NANUAL FOR PREPARATION OF DATA B - NAINTENANCE OR TEST 2 - NANUAL SCRAN. >

C - REFUELING ENTRY SHEETS FOR LICENSEE D - REGULATORY RESTRICTION 3 - AUTDMATIC SCRAM. EVENT REPORT (LER) 4 - OTHER (EXPLAIN) FILE INUREG-01613 E - OPERATOR TRAINING + LICENSE EXAMINATION (

F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAINI H - OTHERIEXPLAIN)

EXHIBIT I - SAME SOURCE S

e 4

)

[ Docke t. No. 93-2'/*/

Attachmont to Monthly Cporating Roport

. For May 1981 l

. REFUELING TNFORMATION i i

1. Name of facility: .
  • l i

Peach Botton Unit 2 l

2. Dhadulad date for next refnaling shutdown:

January 2, 1982 3 +hadulad date for restart following rei'ushng:

February 13, 1982 14 Will refnaling or resumption of operation thereafter require a t=ahniaal specification change or other licenso amendmont?

Yes. -

If answer is yes, what,'in ganam1, will those bo?

Taahniad Spooifications to maan==adate roload fuel.

Modifications to reactor coro operating limita are orpootod.

5 Wn'ed date(s) for submitting proposed 11conoing action and supporting information:

' November 13, 1981

6. Important 14aan=4ng canaidarations associated with rofuohng, o.g. ,

new or different fuel design or supplier, unrot10wod dosip or perfozmance analyala methods, sian4P4aant changos in fuel doni p ,

new operating procedures None orpectod.

7 N n"-x r of fuel assemblica (a) in the coro and (b) in tho upont h 1 atorngo Pool:

(a Core - 7 % Fuel Assemblica (b h l Pool - 910 h l Assemblica

8. h present liconned upont fuel pool storago capacity and tho ui::,o of any increase in licensed storage capacity that has boon roquouted or la plannod, in number of fuel asacablion:

b upont M 1 pool otcrage onpacity has boon roliconaod for 2816 h 1 accomb11os.

9 h pzo,jooted date of the last rol'nal 4ng that can be discharbd -

to the upunt h1 pool auuusing the procent liconced capacity.

September, 1990

~. l

.. %c4ut, ho. $0-278 l l

Attachment to '

Monthly Operating Roport

. For May 1981 )

REWELING INMRKATION ,

1. Name of facility:

Peach 3otton Unit 3

2. +h-anlad date for next zufueling shutdowns Refueling Began March 6, 1981 3 h %i"'~1 date for restart following refueling:

Ausuat 14,1981

4. Will refna'4"r or resumption of operation thorocfter roquire a t-^hnia-1 s==aifi^etion change or other licenso ==andmant?

Yes. .

If answer la yes,' what, in genazal, will thoso bo?

Technical opocification changou to aco~"^1ato roload bl.

Modifications to reactor oore operating limito aro expootod.

5- Scheduled date(s) for submitting proposed lionnaing action and supporting information:

Submitted March 30, 1981

6. Important lia-a-4=e - G- m tions ---^^tetod with rofueline, o.g.,

new or different fuel design or supplier, unroviewod donign or perfoznance analysis methods, si6nificant changon in ruol douign, now opozating procedurou:

None expected.

7. N number of fumi accomblion (a) in W coro ami (b) in h upunt fuel atcrage pools a coro - 764 m l An - 149u b Puol Pool - 712 W i=tod Puel Ascombliou
8. h present '4--M opont fuel pool otozago capacity and the uizo of any increase in 11aan"~2 storage capacity that huu boon xvquuuted or la plannod, in numbor of fuel asuomblion:

The upont fuel pool utorage capucity huu buon ruliuuuuud for 2816 fuel acuumblico.

9 The projected date of the last refueling that con be diochargod to

W opont fuel pool auuumine the prooont licenced capacity:

September, 1991

_ _ . _ _ . _ . - . , _ _. _ . - _ _ . - _ _ _ _ _ . . .____.___.._.._.._.__--._