uneoAe.+. a .' ; A . >.t i DOCKET No. 50 - 277 DATE JUNE 12, 1981 .
l O COMPLETED 6Y PMILADFLPHIA ELFCTRIC COMPANY W.M.ALDEN ENGINEER-IN-4NARGE NUCLEAR SFCTION GENERA T!0N DIVISION-N'JCLE AR TELEPHONE (215) 841-5022 OPERATING STATUS
- 1. UNIT NAME: PFACH BOTTOM UNIT 2 1 NOTES: THIS UNIT EXPERIENCED l l l
- 2. REPORTING PER!c0 MAY, 1981 1 ONE MAJOR DUTAGE.
I l l
- 3. LICENSED THERMAL POWER (MWTit 1293 I I l l
- 4. NAMEPLATE RATING (GROSS MWE) 1152 I I l l
- 5. DESIGN ELECTRICAL RATING (NET MWE)* 1065 l l 1 I
- 6. MAXIMUM DE*ENOABLE CAPACITY (GROSS MWEl* 1098 l l
, I l l 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWE18 1051 l l
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBFR 3 THROUGH 7) SINCE LAST REPORT, GLVF REASONS:
. 9. PONER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWEls
- 10. RE ASDNS FOR RE STRICTIONS, IF ANY:
THIS MONTH YR-TC -0 A TE CUMULATIVE
- 11. HOU45 IN REPORTING PERIOD 744 3,623 60,551
- 12. NUMBER OF HOURS RE ACTOR WAS CRITICAL 0 2,640.1 45,192.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE 0.0 2,507.0 44,109.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 8,149,370 128,570.442
- 17. GROSS ELECTRICAL ENERGY GENFRATED (MWH) 0 2,745,600 42,358,700
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) * -4,205 2,650,450 40,610,114
- 19. UNIT SERVICE FACTOR 0.0 71.7 72.8
( 20. UNIT AVAILABILITY FACTOR 0.0 71.7 72.8
, 21. U417 CAPACITY FACTOR (USING MOC NET) 0 .0 69.6 63.8 l
l 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 68.7 63.0
!. 23. UNIT FORCEO 09TAGE R ATE 100.0 28.3 7.7
- 24. SHUTOOWNS SCHEDULED DVER NEXT 6 MON 1;'S (TYPE, DATE, AND DURATION OF EACH):
L 25. IF SHUTDOWN AT END OF AEPORT PERIOD, ESTIMATED OATE OF STARTUP: Unit 2, June 22, 1981 1,
L 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED ll
?.
INITIAL CRITICALITY
- [ INITIAL ELECTRICITY
? 8106170/47 COMMEPCIAL OPERATION g 0 - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY REGULATORY C3MMISSION REPORTS.
1 l
opi"Aiti;r. HA: *
, , '* F . 9 88 I DOCNET NO. 50 - 278 j DATE JUNG 12, 1981 i
COMPLETED BY PHILADFLPHIA FLFCTRIC COMPAfiY I W.M.ALDFN E NGINE ER-IN-CH A R GE NUCLEAR SFCTION GENERATION DIVISION-NUCLFAR TELEPHONE (215) 841-5022 OPERATING STATUS .
- 1. UNIT NAMFt PEACH BOTTOM UNIT 3 l NOTES: THIS UNIT IS DOWN FOR l I I
- 2. REPORTING PER100: MAY, 1961 1 REFUELING AND MAINTENANCE. 1
- - 1 I
- 3. LICENSED THERMAL POWER (MWT): 3293 I I 1 I
- 4. NAMEPLATE RATING (GROSS MWE): 1152 l 1
- 1 I
- 5. DESIGN ELECTRICAL 4ATING INET MWE): 1065 I i 1 I
- 6. MAXIMUM DEPENDA8LE JAPACITY (GROSS MWE): 1098 i 1
-- 1 l I
- 7. MAXIMUM DEPENDA8LE CAPACITY (NET MWEls 1035 l I
- 8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 73 SINCE LAST REPORT, GIVE REASt p 9 POWER LEVEL TO WHICH RESTRICTED, I F AN Y (NET MWEls
- 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE D
?
- 11. HOURS IN REPORT!4G PERIOD 744 3,623 56,447 h 12. NUMBER OF HnuRS REACTOR WAS CRITICAL 0 1,547.7 43,709.9
- 13. REACTOR RESkRVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENER ATOR ON-LINE 0.0 1,541.0 42,566.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.b
{ 16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4,932,216 121,775.165
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWHI O 1,643,900 39,745,940 I . . . .
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) * -4,205 1,576,938 38,15$.501 19 UNIT SERVICE FACTOR 0.0 42.6 75.4
- 20. UNIT AVAILARILITY FACTOR 0.0 42.6 "I'. 4
- 21. UNIT CAPACITY FACTOR ( UF IFG MDC NE T ) 0.0 42.1 <^.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 40.9 63.5
- 23. UNIT FORCED OUTAGE RATE 0.0 1.1 $$3 24 5HUTDOWNS SCHEDULED OVER NEXT. 6 MONTHS (TYPE, DATE, AND DURATION OF EACHIS REFUELING / MAINTENANCE, 3/06/81, TWENTYTHREE WEEKS
- 25. IF SHUTDOWN AT END OF REPORT PERICO, ESTIMATED DATE 05 STARTUP Unit 3, August 15, 1981
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION 38 FORECAST ACHIEVED INITIAL CRITICALITY j INITIAL ELECTRICITY CDMMERCIAL OPERATION e - NEGATIVE VALUE REPORTED FOR CONSISTENCY WITH FEDERAL ENERGY ""*'JL???P" 70MMISSION . _ . _
i AVFDAGE DAILY UNIT I'0WE R LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE JUNE 12, 1981 COMPANY PHILADFLPHIA FLECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022 MONTH MAY 1981 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWF-NET) 5 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 11 0 27 0 .
12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 l
AVERAGF DAYLY UNIT ,50WER LFVFL i
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JUNF 12, 1981 COMPANY PHILADELPHIA FLECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION-GENERATION DIVISION-NUCLE AR TELEPHONE (215) 841-5022
=- ____
MONTH MAY 1981
_..._ _-_ _ DAY __ AVERAGE _ DAILY.. POWER _ LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 l 6 0 22 0 i 7 0 23 0 l
8 0 24 0 9 0 25 0 l 10' O 26 0 11 0 27 0 -
12 0 28 0
~~
13 0 ' - -
29 0 t
14 0 30 0 15 0 31 0
! 16 0 i
e 1
, - - . . - - . , . . , - - . . _ . . , , . , , , , , - , . . . - . . . . . . . . , . . - - . . ..-..--..-.....-------c.,,--,. . . . - - - . . . . . - - - . , , , . , - .
. 4 ,
6 a
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 27T UNIT NAME *EACH 80TTOM UNIT 2
'l .__ __- _. _.-
DATE JUNE 12, 1981 j,
REPORT MONTH MAYe 1981 4
COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN EN GINE E R-IN-C HA R GE NUCLEAR SECTION GENERATION DIVISION-NUCLEdR TELEPHONE (2151 841-5022 i _.--_ - ---
__ . . . _ = ___ - -
i i i I I I l METHOD OF l LICENSEE ISYSTEMICDNPONFNTl CAUSE AND CORRECTIVE ITYPElDURATIONIREASONISHUTTING DOWN1 EVENT l CODE I CODE I AC140N 10 NO.1 DATE I (118 (HOUR $ll (2) I REACTOR (3) l REPORT e 1 (4) l g (5) l PREVENT RECURRENCE I == ._- g I I I i l -
1 I I I 13 l 810501 1 F l 744.0 l A l 1 1 NA I C8 l MOTORX l CONTINUATION OF OUTAGE DUE TO 29 REACTOR
! I I I I l I I l RECIRCULATION PUMP MOTOR SEARING FAILURE.
i 1 1- 1 I I I I l l I I 74'.0 l l l I l l (1) (21 (3) 14)
F - FORCED REA$0N METHDD S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) EkHIBIT G - INSTRUCTIDNS
' 1 - NANUAL FOR PREPARAT!DN OF DATA S - MAINTENANCE OR TEST 2 - M ANUAL SCR AM.
d C - REFUELING ENTRY $HEETS FOR LICENSEE b' 3 - AUTDMATIC SCRAM. EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAINI FILE INUREG-0161) '
E - OPERATOR TRAINING + LICENSE EXAMINATION i F - ADMINIST.tATIVE I G - OPERATIGNAL ERROR (EXPLAIN) (5)
H - OTHER(EXPLAINI
- EXHIBIT I - SAME SOURCE i
l 4
d
/ I h
)
~
) k UNIT SHUTDOWNS AND POWER REDUCTIDNS DOCKET NO. 50 - 278
=
UNIT NANE PEACH BOTTON UNIT 3 i
DATE JUNE 12, 1981
) REPORT MONTH MAYe 1981 COMPLETED BY PHILA0FLPHIA ELECTRIC COMPANY
) W.N.ALDEN ENGINE E R-IN-C HA RGE NUCLEAR SECTION
) GENERA TION DIVISIDN-NUCLEAR TELEPHONE (215) 841-5022
.- .- = .
l . ___
) l l l l l NETH00 lTYPEIDURATIONIREASONISHUTTING DOWNI 0F 1 LICENSEEFVENT ISYSTEMICOMPDNENTl CAUSE AND CORRECTIVE NO.] l CODE I CODE l ACTIDN TO
)~
. DATE... i (111 (HOUR
$ll 125 l REACTOR (3) l REPORT --
8 l (4) I (51 1 PREVENT RECURRENCE l I i l l Ol 810501 l 5 l 744.0 l C l I I l i I i l NA
) I I ----- 1 I I l I
RC l FUELXX l l CONTINUATION 08 REFUELING DUTAGE.
l l l 744.0 I I
I l l l l l
1 (Il (2) i (3) (4)
F - FORCED REASON S - SCHEDULED METHOD A - EQUIPMENT FAILURF (EXPLAIN) EXHIBIT G - INSTRUCTIONS 1 - NANUAL FOR PREPARATION OF DATA B - NAINTENANCE OR TEST 2 - NANUAL SCRAN. >
C - REFUELING ENTRY SHEETS FOR LICENSEE D - REGULATORY RESTRICTION 3 - AUTDMATIC SCRAM. EVENT REPORT (LER) 4 - OTHER (EXPLAIN) FILE INUREG-01613 E - OPERATOR TRAINING + LICENSE EXAMINATION (
F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAINI H - OTHERIEXPLAIN)
EXHIBIT I - SAME SOURCE S
e 4
)
[ Docke t. No. 93-2'/*/
Attachmont to Monthly Cporating Roport
. For May 1981 l
. REFUELING TNFORMATION i i
- 1. Name of facility: .
- l i
Peach Botton Unit 2 l
- 2. Dhadulad date for next refnaling shutdown:
January 2, 1982 3 +hadulad date for restart following rei'ushng:
February 13, 1982 14 Will refnaling or resumption of operation thereafter require a t=ahniaal specification change or other licenso amendmont?
Yes. -
If answer is yes, what,'in ganam1, will those bo?
Taahniad Spooifications to maan==adate roload fuel.
Modifications to reactor coro operating limita are orpootod.
5 Wn'ed date(s) for submitting proposed 11conoing action and supporting information:
' November 13, 1981
- 6. Important 14aan=4ng canaidarations associated with rofuohng, o.g. ,
new or different fuel design or supplier, unrot10wod dosip or perfozmance analyala methods, sian4P4aant changos in fuel doni p ,
new operating procedures None orpectod.
7 N n"-x r of fuel assemblica (a) in the coro and (b) in tho upont h 1 atorngo Pool:
(a Core - 7 % Fuel Assemblica (b h l Pool - 910 h l Assemblica
- 8. h present liconned upont fuel pool storago capacity and tho ui::,o of any increase in licensed storage capacity that has boon roquouted or la plannod, in number of fuel asacablion:
b upont M 1 pool otcrage onpacity has boon roliconaod for 2816 h 1 accomb11os.
9 h pzo,jooted date of the last rol'nal 4ng that can be discharbd -
to the upunt h1 pool auuusing the procent liconced capacity.
September, 1990
~. l
.. %c4ut, ho. $0-278 l l
Attachment to '
Monthly Operating Roport
. For May 1981 )
REWELING INMRKATION ,
- 1. Name of facility:
Peach 3otton Unit 3
- 2. +h-anlad date for next zufueling shutdowns Refueling Began March 6, 1981 3 h %i"'~1 date for restart following refueling:
Ausuat 14,1981
- 4. Will refna'4"r or resumption of operation thorocfter roquire a t-^hnia-1 s==aifi^etion change or other licenso ==andmant?
Yes. .
If answer la yes,' what, in genazal, will thoso bo?
Technical opocification changou to aco~"^1ato roload bl.
Modifications to reactor oore operating limito aro expootod.
5- Scheduled date(s) for submitting proposed lionnaing action and supporting information:
Submitted March 30, 1981
- 6. Important lia-a-4=e - G- m tions ---^^tetod with rofueline, o.g.,
new or different fuel design or supplier, unroviewod donign or perfoznance analysis methods, si6nificant changon in ruol douign, now opozating procedurou:
None expected.
- 7. N number of fumi accomblion (a) in W coro ami (b) in h upunt fuel atcrage pools a coro - 764 m l An - 149u b Puol Pool - 712 W i=tod Puel Ascombliou
- 8. h present '4--M opont fuel pool otozago capacity and the uizo of any increase in 11aan"~2 storage capacity that huu boon xvquuuted or la plannod, in numbor of fuel asuomblion:
The upont fuel pool utorage capucity huu buon ruliuuuuud for 2816 fuel acuumblico.
9 The projected date of the last refueling that con be diochargod to
- W opont fuel pool auuumine the prooont licenced capacity:
September, 1991