Forwards IE Insp Rept 50-344/81-09 on 810401-30.No Noncompliance Noted
ML19350E180
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 05/15/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Withers B
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML19350E181 List:
References
NUDOCS 8106170114
Download: ML19350E180 (2)


See also: IR 05000344/1981009

Text

77C

,'

m'o

.

8

UNITED STATES

!'

3,

NUCLEAR REGULATORY COMMISSION

3

$

REGION V

$

1990 N. CALIFORNIA BOULEVARD

o

SUITE 202, WALNUT CREEK PLAZA

e.,,a

WALNUT CREEK, CALIFORNIA 94596

U

N

May 15, 1981

f'

g

.

01

Y# @F 3

Docket No. 50-344

/-

\\

L

- " f+ y /

~

v$

"i

d

4

-

O co

-

,

g~x

Portland General Electric Company

W

.

121 S. W. Salmon Street

y 75%

0

-'

Portland, Oregon 97204

Attention:

Mr. Bart D. Withers

Vice President Nuclear

.

Gentlemen:

Subject:

NRC Inspection of the Trojan Nuclear Plant

This refers to the inspection conducted by Mr. M. H. Malmros and Mr. G. W.

~ Johnston of this office on April 1-30, 1981 of activities authorized by NRC

License No NPF-1, and to the discussion of our findings held by Mr. Malmros

and Mr. Johnston with Mr. Yundt and other members of your staff periodically

during the inspection.

Areas examined during this inspection are described in the enclosed inspec-

tion report. Within these areas, the inspection consisted of selective ex-

aminations of procedures and representative records, interviews with personnel,

and observations by the inspector.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

believe to be exempt from disclosure under 10 CFR 9.5(a) (4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of you intention to file a request for withholding; and

(b) submit within 25 days from the date of this letter a written application

to this office to withhold such information.

If your receipt of this letter

has been delayed such that less than seven (7) days are available for your

i

review, please notify this office promptly so that a new due date may be

established. Consistent with section 2.790(b) (1), any such application

must be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withhheld, and which con-

tains a full statement of the reasons on the basis which it is claimed that

the information should be withheld from public disclosure. This section

.

-

810_617 0 \\li

Cl

.

.

.

-

.

.

_

_-

.

,

.

Portland General Electric Company

-2-

May 15, 1981

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall

be incorporated as far as possible into a separate part of the affadavit.

If we do not hear from you in this regard within the specified periods noted

above,.the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Si cerely,

,I f

'l

,0. L.

rtws, Chief

j8eactorOperationsandNuclear

Support Branch

_

Enclosure:

IE Inspection Report

No. 50-344/81-09

cc w/o enclosure:

C. P. Yundt, PGE

J. W. Durham, Esq., Senior Vice Presinnt &

Corporate Counsel

'