ML19350D943
| ML19350D943 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/12/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19350D944 | List: |
| References | |
| NUDOCS 8105270296 | |
| Download: ML19350D943 (2) | |
See also: IR 05000327/1981011
Text
- pe ux
UNITED STATES
l'
NUCLEAR REGULATORY COMMISSION
~
o
-
r
REGION 11
(
9e /,h
101 MARIETTA ST., N.W., SulTE 3100
ggI t
g
ATLANTA, GEORGIA 303o3
, p>p *Qg
llAY 121981
Tennessee Valley Authority
,~
ATTN:
H. G. Parris
y
g\\h
I
500A Chestnut Street Tower II
Od3'1
k)
Manager of Power
-
-1
Chattanooga, TN 37401
0
4.*-
/
<
Gentlemen:
y
Subject: Report Nos. 50-327/81-11 and 50-328/81-12
This refers to the routine safety inspection conducted by Mr. R. L. Fiedler of
this office on March 30 - April 10,1981, of activities authorized by NRC Opera-
ting License No. OPR-77 and Construction Permit No. CPPR-73 for the Sequoyah
facility and to the discussion of our findings held with J. M. McGriff at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviaticas were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
-
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC's Public Document Room.
If this report
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20' days to this office
to withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document.
If we do not hear from yo'J within the specified period, the report
will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincera y,
/
-
Division ok_ f nWor
" '
~
- , . .
esident and
\\go\\
Reactor Project Inspection
)
5
I
Enclosure: See Page 2
8105270 Nh.
.
-
-
..
.
,
.
Tennessee Valley Authority
2
MAY 121981
Enclasure:
Inspection Report Nos.' 50-327/81-11
and 50-328/81-12
>
cc w/ encl:
j
H. J. Green, Division Director
G. G. Stack, Project Manager
i
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
'
'
Licensing Section
M. J. Burzynski, Project Engineer
-
H. N. Culver, Chief, Nuclear Safety
Review Staff
!