Forwards IE Insp Repts 50-327/81-11 & 50-328/81-12 on 810330-0410.No Noncompliance Noted
ML19350D943
Person / Time
Site: Sequoyah  
Issue date: 05/12/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19350D944 List:
References
NUDOCS 8105270296
Download: ML19350D943 (2)


See also: IR 05000327/1981011

Text

  • pe ux

UNITED STATES

l'

NUCLEAR REGULATORY COMMISSION

~

o

-

r

REGION 11

(

9e /,h

101 MARIETTA ST., N.W., SulTE 3100

ggI t

g

ATLANTA, GEORGIA 303o3

, p>p *Qg

llAY 121981

Tennessee Valley Authority

,~

ATTN:

H. G. Parris

y

g\\h

I

500A Chestnut Street Tower II

Od3'1

k)

Manager of Power

-

-1

Chattanooga, TN 37401

0

4.*-

/

<

Gentlemen:

y

Subject: Report Nos. 50-327/81-11 and 50-328/81-12

This refers to the routine safety inspection conducted by Mr. R. L. Fiedler of

this office on March 30 - April 10,1981, of activities authorized by NRC Opera-

ting License No. OPR-77 and Construction Permit No. CPPR-73 for the Sequoyah

facility and to the discussion of our findings held with J. M. McGriff at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviaticas were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

-

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-

tion report will be placed in the NRC's Public Document Room.

If this report

contains any information that you (or your contractor) believe to be proprietary,

it is necessary that you make a written application within 20' days to this office

to withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document.

If we do not hear from yo'J within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincera y,

/

-

Division ok_ f nWor

" '

~

- , . .

esident and

\\go\\

Reactor Project Inspection

)

5

I

Enclosure: See Page 2

8105270 Nh.

.

-

-

..

.

,

.

Tennessee Valley Authority

2

MAY 121981

Enclasure:

Inspection Report Nos.' 50-327/81-11

and 50-328/81-12

>

cc w/ encl:

j

H. J. Green, Division Director

G. G. Stack, Project Manager

i

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

'

'

Licensing Section

M. J. Burzynski, Project Engineer

-

H. N. Culver, Chief, Nuclear Safety

Review Staff

!