ML19350D257
| ML19350D257 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/20/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19350D255 | List: |
| References | |
| NUDOCS 8104150019 | |
| Download: ML19350D257 (2) | |
See also: IR 05000328/1981003
Text
,
.
.
%-
'
d
UNITED STATES
/] {8 '
NUCLEAR REGULATORY COMMISSION
k
aE
REGION 11
'
g[
101 MARlETTA ST., N.W SUITE 3100
o,
ATLANTA. G EORGIA 30303
.....
FE B 2 01981
Tennessee Valley Authority
ATTN:
H. G. Parris
Manner of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
Subject: Report No. 50-328/81-03
This refers to the routine inspection conducted by L. D. Zajac of this office on
January 26 - 28, 1981, of activities authorized by NRC Construction Permit No.
CPPR-73 for the Sequoyah facility. Our preliminary findings were discussed with
G. G. Stack at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
Elements to be included in your response are delineated in Appendix A.
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary
that you make a written application within 20 days to this effice to withhold
such information from public disclosure. Any such application must include the
basis for claiming that the information is proprietary and the proprietary
information should be contained in a separate part of the document. If we do
not hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/
'
C. E. Murp
hie
,
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
810415OoM
.
. _.
..
. - . .
...
-.
.
.
.
FEJ 2 01981
.
,
Tennessee Valley Authority
-2-
Enclosures:
1.
Appendix A, Notice of Violation
!
2.
Inspection Report No. 50-328/81-03
cc w/ encl:
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
-
J. F. Cox, Supervisor, Nuclear
Licensing Section
4
M. J. Burzynski, Project Engineer
H. h. Culver, Chief, Nuclear Safety
Review Staff
H. J. Green, Division Director
!
i
i
,
!
!
I
.i
i
l
i
l
!
'
i
l'
-. -
-