O APPENDIX A Virginia Electric and Power Company Docket No. 50-338 Notice of Violation License No.NPF-4 As a result of the inspection conducted on January 11-13, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980),
the following violation was identified.
Technical Specification 3.3.3.1 requires Radiation Monitoring instruments for Containment Gaseous Activity (RMS-160) and Containment Particulate Activity (RMS-159) be calibrated every eighteen (18) months.
Contrary to the above, the Containment Gaseous Activity monitor (RMS-160) and Containment Particulate Activity monitor (RMS-159) were not calibrated every 18 months + 25% in that RMS-159 initially calibrated on 1/27/79 was not calibrated for 23 1/2 months and RMS-160 initially calibrated on 11/22/78 was not calibrated for 251/2 months.
This is a Severity Level V Violation (Supplement I.E.).
Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Power Company is hereby required to submit to this office within twenty-five days of the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
FEB 2 41981 Date:
(