Forwards IE Insp Repts 50-266/81-02 & 50-301/81-02 on 810202-27.No Noncompliance Noted
ML19350C607
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/06/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML19350C608 List:
References
NUDOCS 8104060376
Download: ML19350C607 (2)


See also: IR 05000266/1981002

Text

s

%wo

i

[o an

e

,

Ii

~%

UNITED STATES

!

%

NUCLEAR REGULATORY COMMISSION

3 .,,

$

d

"

REGION 111

,

q,

g

799 ROOSEVELT ROAD

/

GLEN ELLYN. ILLINOIS 6o137

  • ...*

MAR 6

1980

-

' \\M

..

$ Of Y

'f

fg

//p

b

Docket No. 50-266

gO

%--

Docket No. 50-301

u,gk,3 jggb }

'

m

(~3

Wisconsin Electric Power Company

\\p,

'%,

ATTN:

Mr. Sol Burstein

\\

J

Executive Vice President

s.On

\\

Power Plants

j

p

u

231 West Michigan

Milwaukee, WI 53201

Gentlemen:

This refers to the routine inspection conducted by Messrs. W. G. Guldemond

and R. L. Hague of this office on February 2-27, 1981, of activities at the

Point Beach Nuclear Plant, Units I and 2, authorized by NRC Operating

Licenses No. DPR-24 and No. DPR-27 and to the discussion of our findings

with Mr. G. A. Reed at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Reg dations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room, except

as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this office, within

twenty-five days of the date of this letter, to withhold such information

from public disclosure.

The application must include a full statement of

the reasons for which the information is considered proprietary, and should

be prepared so that proprietary information identified in the application

is contained in an enclosure to the application.

,

1-

,

B10.4000 h

.

.

,

Wisconsin Electric Power

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

R Pt.OY

M

R. F. Heishman, Acting Director

Division of Resident and Project

Inspection

Enclosure:

IE Inspection

Reports No. 50-266/81-02

and No. 50-301/81-02

cc w/ enc 1:

G. A. Reed, Manager

Central Files

Reproduction Unit NRC 20b

AEOD

Resident Inspector, RIII

PDR

Local PDR

NSIC

TIC

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, k'isconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

--