ML19350C596

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-312/81-05 on 810217-20.No Noncompliance Noted
ML19350C596
Person / Time
Site: Rancho Seco
Issue date: 03/06/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19350C598 List:
References
NUDOCS 8104060274
Download: ML19350C596 (2)


See also: IR 05000312/1981005

Text

TlOJ

[

\\

UNITED STATES

8

7.

NUCLEAR REGULATORY COMMISSION

i $ .,

,E

REGION V

g

1990 N. CALIFORNIA BOULEVARD

ogg

&

SUITE 202, WALNUT CREEK PLAZA

ems

WALNUT CR EE K, CALIFORNIA 94596

9g

March 6, 1981

,

Docket No. 50-312

z_ %

Co

s/

.i

Sacramento Municipal Utility District

!

k'

9

'M

P. O. Box 15830

[

Sacramento, California 95813

g

~"v

o

s

Attention: Mr. John J. Mattimoe

Assistant General Manager and Chief Engineer

Gentlemen:

Subject:

NRC Inspection

This refers to the inspection conducted by Mr. D. J. Willett of this

office on February 17-20, 1981 of activities authorized by 11RC License

No. DPR-54, and to the discussion of our findings held by Mr. Willett

with Mr. R. J. Rodriguez and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

No items-of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you believe to be

. proprietary, it is necessary that you submit a written application to

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prapared so that

any proprietary information identified is contained in a;. enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

'81040.60 %

. . - .

.

- _.- _-

-

- - . . ~ -

_ - _ - -

. _ _

_.._ - --

_

.

-

,

s.

Sacramento Municipal Utility District -2-

MAR S N

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Si erely,

9

f

.

Reac r Operations Projects

Branch

Enclosure:

IE Inspection Report

No. 50-312/81-05

'

cc w/o enclosure:

R.'J. Rodriguez, SMUD

L. G. Schwieger, SMUD

R. Colombo, SMUD

-r

.

I'

3

$

4

s

T

}

i

. '

-

. -.

.

-

- . - . . - _ . _ _ _ . . _ _ _ _ _ . , _ _

m.-

- .

-..

m- -

.

- .

w