ML19350C536

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810107-08
ML19350C536
Person / Time
Site: NS Savannah
Issue date: 03/02/1981
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19350C532 List:
References
50-238-81-01, 50-238-81-1, NUDOCS 8104030667
Download: ML19350C536 (1)


Text

,'

p Appendix A Notice of Violation U.S. Department of Commerce Docket No. 50-238 Maritime Administration License No. NS-1 N.S. Savannah As a result of the inspection conducted on January 7-8, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.

Technical Specification 3.8.11 requires that two draft stripes will be painted fore and aft at the draft markers. One will be just above the water level.and the upper stripe will be one foot above the lower. These will be observed daily to check if the draft has increased.

Contrary to the above, Technical Specification 3.8.11 was not met in that the upper draft stripe has been painted over at both the fore and aft

' locations.

l This is a Severity Level V Violation (Supplement I.E.).

Pursuant to the provisions of 10 CFR 2.201, you are hereby required to submit to this office within twenty-five days of the date of this Notice, a written state-ment or explanation in reply, including: (1) admission or denial of the alleged violation;. (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance

- will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submit.ted under oath or affirmation.

Date: MAR 0 21981

'8104030 Wl

.