Forwards IE Insp Rept 50-293/80-29 on 801001-30 & Notice of Violation
ML19350C527
Person / Time
Site: Pilgrim
Issue date: 01/15/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Morisi A
BOSTON EDISON CO.
Shared Package
ML19350C524 List:
References
NUDOCS 8104030600
Download: ML19350C527 (2)


See also: IR 05000293/1980029

Text

_

__

.

.

.

.

.

4

UNITED STATES

g

f

. 't

NUCLEAR REGULATORY COMMisslON

REGION I

e

'g

$31 P %RK AVENUE

KING OF PRUS$1 A, PENNSYLV ANI A 19406

Docket No. 50-293

JAN 151981

Boston Edison Company M/C Nuclear

ATTN: Mr. A. V. Marisi

Nuclear Operations Support Manager

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection No. 50-293/80-29

This refers to the routine inspection conducted by Mr. J. Johnson of this office

on October 1-30, 1980, of activities authorized by NRC License No. DPR-35 and

to the discussions of our findings held by Mr. J. Johnson with Mr. R. Machon and

other members of your staff periodically during the inspection.

In addition, our inspector examined those activities discussed in our letter to

Mr. J. E. Howard, dated October 2,1980 regarding the reactor trip and result-

ing transient on October 1, 1980, and our letter to Mr. A. V. Morrisi, dated

October 8,1980 regarding the two depressurizations on October 1 and October 7,

1980.

-

Ardas examined during this inspection are descrit,ed in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within

these areas, the inspection co,nsisted of selective examinations of procedurt;

and representative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized into the levels as described in our corre-

spondence to you dated December 31, 1974.

This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to

this office, within twenty (20) days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

taken to avoid further items of noncompliance; and (3) the date when full com-

pliance will be achieved.

.

18110403O M

'

.

v

-

e

3

=

,w

w-m--

+w-

-

y

__

_

.

.

.

JAN 151981

Boston Edison Company M/C Nuclear

2

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosures

will be placed in the NRC's Public Document Room.

If this report contains any

information that you (or ycur contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought t's be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorocrated as far as possible

into a separate part of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

e

pm

-

El

J. Brunner, Chief

Re ctor Operations and Nuclear

upport Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report No. 50-293/30-29

cc w/ encl:

R. D. Machon, Nuclear Manager - Pilgrim Station

.

~'

T

T