ML19350C512

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-289/81-03 on 810126-29.No Noncompliance Noted
ML19350C512
Person / Time
Site: Crane 
Issue date: 02/11/1981
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Hukill H
METROPOLITAN EDISON CO.
Shared Package
ML19350C513 List:
References
NUDOCS 8104030531
Download: ML19350C512 (2)


See also: IR 05000289/1981003

Text

..

- _ _

'

'*

71

g arrg#o

UNITED STATES

E} s

  1. j,

NUCLEAR REGULATORY COMMISSION

g

r

IlEGION 1

$

631 PARK AVENUE

%

,e

KING oF PRUSSIA. PENNSYLVANIA 19406

Docket No. 50-289

FEB 11 mi

pt!

y

Metropolitan Edison Company

/E 7 (7f

8

Q % k, / gk IS

ATTN: Mr. H. D. Hukill

n

im

/

Vice President and Director of TMI-1

-

GA

P. O. Box 480

Middletown, Pennsylvania 17057

y

p

V

$0

Gentlemen:

q

g

-

Subject:

Inspection 50-289/81-03

This refers to the routine inspection conducted by Mr. A. Sassani, Jr. of this

office on January 26-29, 1981, at the Three Mile Island Nuclear Station, Unit

1, Middletown, Pennsylvania, of activities authorized by NRC License No.

OPR-50 and to the discussions of our finoings held by Mr. Sassani with Mr. N.

C. Kazanus of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Repor t which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, int e .ews with personnel, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part. 2,

Title 10, Code of Federal Regulations, a copy of this letter and tne enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20

days to this office to withhold such information fron. public disclosure. Any

such application must be accompanied by an affidavit executed by the owner of

,

the information, which identifies the document or part sought to be withheld,

and which contains a statement of reasons which addresses with specificity the

items which will be considered by the Commission as listed in subparagraph (b)

(4) of Section 2.790. The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear

from you in this regard within the specified period, the report will be placed

in the Public Document Room.

8104080'W

Q

.

s

Metropolitan Edison Company

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

Robert T. Carlson, Chief

Reactor Construction and Engineering

Support Brarch

Enclosure: Office of Inspection and Enforcement Inspection Report Number

50-289/81-03

cc w/ encl:

R. J. Toole, Manager, TMI-1

L. W. Harding, TMI-1 Licensing Supervisor

E. G. Wallace, PWR Licensing Manager

J. 8. Liberman, Esquire

G. F. Trawbridge, Esquire

,

Ms. Mary V. Southard, Chairperson, Citizens for a safe Environment (Without

Report)'

,-

.

e