ML19350C365

From kanterella
Jump to navigation Jump to search
Amends 63 & 57 to Licenses DPR-29 & DPR-30,respectively, Revising App a Tech Specs to Detail Placement of Installed Heat & Smoke Detectors,Presence of Sprinkler Sys in Cable Spreading Room & to Correct Min Level for Fuel Tank
ML19350C365
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 03/16/1981
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19350C366 List:
References
NUDOCS 8104010163
Download: ML19350C365 (12)


Text

_

!s>RCECU

'o UNITED STATES O

E-

'g NUCLEAR REGULATORY COMMISSION o

h 9

WASHING TON, D. C. 20555

%....*/

COMMONWEALTH EDIS0N COMPANY e

AND IOWA-ILLIN0IS GAS AND ELECTRIC COMPANY DOCKET NO. 50-254 QUAD CITIES NUCLEAR POWER STATION UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 63 License No. DPR-29 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The applications for amendme et by the Commonwealth Edison Compan/

(the licensee) dated June 6,1978 and January 8,1979, comply with-the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regu-lations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the applications, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized

. by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-29 is hereby amended to read as follows:

3.B Technical Specifications _

The-Technical Specifications contained in Appendices A and B, as revised.through Amendment No. 63, are hereby incorporated in the license..The licensee shall operate the' facility in accordance with the Technical Specifications.

'810 4 010 /k8.a

_... - - - _ - -.. ~.

. i i

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION s)ces%'. Ippolito, Chief

~

Thomas F Operating Reactors Branch #2 Division of Licensing i

Attachment:

Changes to the Technical Specifications Date of Issuance:

March 16, 1981 l

{

L l

L.

I f

l L

f.

F

..e-

- -~_.......,, _ _.

..=.

i i

i I

ATTACHMENT TO LICENSE AMENDMENT NO. 63 I

FACILITY OPERATING LICENSE NO. DPR-29 DOCKET NO. 50-254 Revise the Appendix "A" Technical Specifications as follows:

Remove Replace 3.12/4.12-5 3.12/4.12-5 3.12/4.12-7 3.12/4.12-7 I

3.12/4.12-8 3.12/4.12-8 G

l 4

i 1

4

,r, e-,

, e er '.e r

+e

,-e, ree--

ew, --,,.'*-

,..-.+me+

-w.-

~-r- - -,y r

Quad-Cities OPR-29 a.

At least once per operating 2.

With one or more penetration fire barriers not intact, establish cycle, and a continuous fire watch on at least b.

Prior to declaring a penetra-tion fire barrier functional one side of the af;ected penetration following repairs or main-within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if the area on either

tenance, side of the affected penetration contains e.;uipment required to be operable.

C.

Fire Pump Diesel Engine G.

Fire Pump Diesel Engine 1.

The Fire Pu=p Diesel Engine shall 1.

The fire pump diesel starting 24-volt battery bank and charger be operable as specified in shall be demonstrated OPERABLE:

3.12.r 1.a and 3.12.B.l.b.

'At least once per 7 days by a.

verifying that:

(1) The eletrolyte level of each battery is above the plates, and (2) The overall battery voltage is > 24 volts, b.

At least once per 92 days by verifying that the specific gravity is appropriate for continued service of battery.

At least once per 18 months c.

by verifying that:

(1) The batteries, cell plates and battery racks snov no visual indication of physical damage or abnormal deterioration, and (2) The battery-to-battery and i~

terminal connections are j

clean, tight, free of corrosion and coated with anti-corrosion material.

. The fire pump diesel engine shall 2.

' be demonstrated OPr.RABLE:

a.

At least once per 31 days by verifying; (1) The

  • fuel storage day tank f l

contains at least 150 gallons of fuel, and (2) The diesel starts frcm ambient conditions and operates for at least 20 minutes.

P00R ORGEL Amendment No. 63

QUAD 41 TIES DPR-29 TABLE 3.12-1 FIRE DETECTION INSTRUMENTS MINIMUM INSTCUMENTS O."ERACLE I

INSTRU.*.1ENT LOCATION i

HEAT SMOKE FLOW Unit 1 HPCI crea; 5

7 heat detectors Unit 1 Diesel Generator I

Room; 2 heat detectors l

Unit 1 Diesel Oil Day l

Tank Area.1 heat detector Unit 1/2 Dietel Generatot Room:

I 2 heat detectors Unit 1/2 Diesel Oi! Day Tank l

Area; Iheat detector Unit 1 Cable Tunnel:

1 I flow detector Control Room. Computer Room.

Electrical Equiprnent Room HVAC: 10 smoke detectors 12 Cable Spreading Room Area:

18 Smoke detectors l

.n.

f

(

(

I l

~

P00R ORB R 3.12,61.12 Amendment No.163

QU.iD CTTIES DPR-29 V

TABLE 3.12-2 SPRINKLER SYSTEMS

1. Unit One Cable Tunnel
2. Unit One HPCI Room
3. Unit One Diesel Oil Day Tank Room
4. Unit 1/2 Diewt Oil Day Tank Room
5. Cable Spreading Room 1

TABLE 3.12-3 CO SYSTEMS 2

1. UnitOne DieselGenerator Arca
2. Unit 1/2 Diesel Generator Area
3. Unit One Diesel Oil bay Tank Room
4. Unit 1/2 Diesel Oil Day Tank Room

~:

5 6

4 a

5,..

.{

- o.

~ 3'I 2I4'I 2-8 Amendment.No. 63 I

~

ga noo, 4

o,,

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION j

WASHINGTON, D. C. 20555 g

%*****/

C0'1MONWEAuTH EDISON COMPANY AND IOWA-ILLIN0IS GAS AND ELECTRIC COMPANY DOCKET N0. 50-265 QUAD CITIES NUCLEAR POWER STATION UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 57 License No. DPR-30 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The applications for amendment by the Commonwealth Edison Company (tha licensee) dated June 6,1978 and January 8,1979, comply witn the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regu-lations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the applications, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii)_ that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations'and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifi-cations as indicated in the attachment to this license amendment and paragraph 3.B of Facility Operating License No. DPR-30 is hereby-amended to read as follows:

3.B Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. ;57, are hereby incorporated in the

' license. The licensee shall opert.te the facility in accordance with the Technical Specifications.

.o

^

_ ~

.- 3.

This license amendment is effective as of the date of its issuance.

~

FOR THE NUCLEAR REGULATORY C0tt!ISSION N-7 M-Thomas A.vIppolito, Chief Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications 1

Date of Issuance: March 16, 1981-

{

l '-

i l.

L I

[.

1 1

a akh-4--,,,

W-=

  • r---

7-

-w--6 1

er**"-

e"m r

1* - ~ 'y*'

v

--4e-

~

t

ATTACHMENT TO LICENSE AMENDMENT NO. 57 FACILITY OPERATING LICENSE NO. DPR-30 DOCKET ~NO. 50-265 Revise the Appendix "A" Technical Specifications as follows:

~

Remove Replace 3.12/4.12-5 3.12/4.12-5 3.12/4.12-7

-3.12/4.12-7 3.12/4.12-8 3.12/4.12-8 P

k 9

~

L.m 2-

Quad-Cities DPR-30 2.

With one or more penetration a.

At least once per operating fire'oarriere not intact, establish tycle, and a continuous fire watch on at least b.

rior to declaring a penetra-one side of the affected penetration tion fire barrier functional within I hour if the area on either following repairs or main-side of the affected penetration

tenance, contains equip =ent required to be operable.

C.

Fire Pump Diesel Engine C.

Fire Pump Diesel Engine 1.

The Fire Pump Diesel Engine shall 1.

The fire pu=p diese) starting be operable as specified in 24-volt battery bank and charger 3.12.B.l.a and 3.12.B.I.b.

  • hall be demonstrated OPEFW!LE:

a.

At least once per 7 days by verifying that:

(1) The eletrolyte level of each battery is above the plates, and (2) The overall battery voltage fa > 24 volts.

b.

At least once per 92 days by verifying that the specific gravity is appropriate for centinued service of battery.

c.

At least once per 18 months by verifying that:

(1) The batteries, cell plates and battery rack show no visual indication cf physical damage or abnormal deterioration, and (2) The battery-to-battery and terminal connections are clean, tight, free of corrosion and coated vita anti-corrosirn caterial.

s 2.

The fire pu=p diesel engine shall be demonstrated OPERABLE:

At least once per 31 days by a.

verifying; <

(1) The fuel storage day tank contains at least 150 l

gallons of fuel, and (2) The diesel starts from smbient conditions and operates for at least

. 20 minutes.

f Amendment No. 57 3.12/4.12-5

i

(

QUAD.CFTIES DPR-30 f

TABLE 3.121 FIHE DETECTION IN3TRU?.11NTS INSTRU!.*ENT LOCATION MINIMut.11NSTRU'.*ETJTS OPERAi3LE HEAT SMOl'E FLOW Unit 2 HPCI ares:

5 7 heat detectors Unit 2 Cie:ci Gene *ator l

, Room: 2 heat detectors Unit 2 Diesel Oil Day l

I Tank Area: I heat detector Unit 1/2 Diesel Generator Room:

I 2 heat detectors i

Unit 1/2 Diemi Oil Day Tank I

Area: 1; heat detector Unit 1 Cable Tunnel:

1 1 flow detector Control Room. Computcr Room, Etactrical Equipment Room HVAC: 10 smoke detectors 8

Cable Spreading Room 12, hrea:

18 Smoke Detectors

^

.e Amendment No.~57'

- 3.i:r.1.i _7 c.

QU/.D-CITIES DPil-30 t

~

TABLE 3.12-2 SPP.INKLER SYSTE*/.S

1. Unit Two Cable Tunnel
2. Unit Two HPC: Reem
3. Unit Two Diesel Oil oav Tank Room
4. Unit 1/2 Diesel Oil Dsy Tank Room
5. Cable Spreading Room l

t TABLE 3.12-3 SYSTE P.",S CO2 t

1. Unit Two Diesal Generstor Area
2. Unit 1/2 Die:el Generatcr Area 3.. Unit Two Diesal Oil Day Tank Room
4. Unit 1/2 D:esel Oil Day Tank Roor, 4

l I'

i.-

l' s

.4 4

L

(

=,f

\\;

7 t

i,4.

Amendment No; 57'

-3.1$4.12-S 1

y s

'.%D h

, m

_r _2 - __ _ _ _ _ _ _ _ _ _ _ _ _, _ _ _ _ - _ _ _ -__ _ _ _ _ _ _ _

  • ____

.