p>* "%q, c-
'p, f.
,C, UNITED STATES y y ) s. c *',g NUCLEAR REGULATORY COMMISSION l
W ASHING TON, D. C. 20555 Ei
% 'ed1-]
MAR 2 B 1961 DocketNos.l3l2 e7 eel [lfg
- 2 T 193;g[?
C D,$%
Mr. Edward G. Bauer, Jr.
Q Vice President and General Counsel b
cd
^
Philadelphia Electric Company gN 2301 Market Street P. O. Box 8699 Philadelphia, Pennsylvania 19101
Dear Mr. Bauer:
LIMERICK GENERATING STATION UNITS 1 AND 2; RESPONSE TO REGULATORY GUIDE 9.3 To date we have not received the information identified in Regulatory Guide 9.3 (see enclosure) in connection with the operating Ifcense review of the captioned nuclear olant. We would appreciate it if you would supply this information as soon as possible so that we can complete our findings as to whether any significant changes have occurred subsequent to the previous construction pennit antitrust review.
Sincerely, KY Argil Toalston, Acting Chief Utility Finance Branch Division of Engineering Office of Nuclear Reactor Regulation
Enclosure:
As stated B103810 H\\)
D.
$ M*..
Octobsr 1974 I,
[e' Co 155Ui ibRY GUIDE g
DIRECTORATE OF REGULATORY STANDARDS o
f'4res of REGULATORY GUIDE 9.3 INFORMATION NEEDED BY THE AEC REGULATORY STAFF IN CONNECTION j
WITH ITS ANTITRUST REVIEW OF OPERATING LICENSE APPLICATIONS FOR NUCLEAR POWER PLANTS I
l A. INTRODUCTION items and any related changes that have occurred or
- l are planned to occur since submission of the
]
q As required by the. December 19,1970, amendments construction permit application:
.l to the Atomic Energy Act of 1954, the Atomic Energy C
Commission conducts antitrust reviews with respect to
- a. Anticipated excess or shortage in generating construction permits and operating licenses it issues for capacity resources not expected at the construc-commercial nuclear facilities. The Commission must tion permit stage. Reasons for the excess or g
O under certain circumstances, make a finding as to shortage along with data on how the excess will be 1
whether the activities under the permit orlicense would allocated, distributed, or otherwise utilized or how create or maintain a situation inconsistent with the the shortage will be obtained.
antitrust laws. An antitrust review at the operating license stage is not required unless the AEC determines
- b. New power pools or coordinating groups or such review is advisable on the ground that significant changes in structure, activities, policies, practices, changes in the licensee's activities or proposed activities or membership of power pools or coordinating have occurred subsequent to the previous antitrust groups in which the licensee was, is, or will be a review conducted by the Attomey General and the participant.
Commission at the construction permit stage. This regulatory guide identifies the type of information that
- c. Changes in transmission with respect to (1) the the Regulato.y staff considers germane for a decision as nuclear plant, (2) interconnections, or (3) to whether a second antitrust review is required at the connections to v,holesale customers.
operating license stage.
- d. Changes in the ownership or contractual allocation of the output of the nuclear facility. Reasons and J
B. INFORMATION NEEDED BY THE AEC basis for such changes should be included.
REGULATORY STAFF IN CONNECTION
- c. Changes in design, provisions, or conditions of rate WITH ITS ANTITRUST REVIEW schedules and reasons for such changes. Rate OF OPERATING LICENSE APPLICATIONS increases or decreases are not necessary.
- j,
N'Y FOR NUCLEAR POWER PLANTS
- f. List of all (1) new wholesale customers, (2)
~
q transfers from one rate schedule to another,
- 1. To assist the regulatory staff in its review, an including copies of schedules not previously applicant for a license to operate a commercial furnished, (3) changes in licensee's service area, nuclear power plant should consider the followini; and (4) licensee's acquisitions or mergers.
USAEC REGULATORY GUIDES cop.es of pubs.shed p,. des enew te otne.ned by ruwest ind.Esimg tte d = sere enered no the us. Atom.c Energy Commessen, venhenston Dr. 20645.
Regulatory Guides see neued to despite end make owesLahns to the putdet Attenten: Dweetor of Reguistory Stenopeds. Comments and suggntens for sv.thods etssptah4e to the AEC Reguietory staff of impeement*ng sp*cefic parts of incrovements en these puedes are encouraged and shound be sent to the Secretary of the Commeuen. US. Atomse Energy commissen. WWashmston, Dr. 20r>45, the Correnas.on's reguantions. to delenee's wchnngues.paed by the staff en Attention-Dockenne arid service sectinn.
9tenustang specsfeC prothiems or postnp40ted actedents, or to provide guedente tg in Methods and sol d femen frown home out et vhe y,edst are assued in the foliosveng ten broad Ebvesens G
t p,.d.s.r.u.e. ment.t,
.I,t
- e -.s for i,. f,mes -.se-PO Mmt P
the esswance ce opensnuance of a permit or hcovis* by the Commissen.
u s.e s e,.e,.
ts,.ce,et.ss
.. om et.n.t,e.
tt,
- 4. En=ironmeates ond Seime
- 9. Antetrwt Rev===
Pih6 hed p,edes een be rummed pered cen. es opproprete. co accommodate v
S. Meternets and Plent ProtecteOn
- 90. Geveral Cornn.nes ar.0 te refimCT etenu Salorfneteen or espetsence.
h
_ 'f s..
- g. List of those generating capacity additions
- 2. Ucensees whose construction pennits include con-
- " c committed for operation after the nuclect facihty, ditions pertaining to antitrust aspects should list and including ownership rights or power output discuss those actions or policies which have been allocations.
implemented in accordance with such conditions.
- 3. Five copies of a separate document entitled "Information for Antitrust Review of Operating
- h. Summary of requests or indications of interest by License Application" and containing the 'above i
other electric power wholesale or retail dis-requested infonnation should be submitted when the tributors, and licensee's response, for any type of operating license application documents are sub-electric service or cooperative venture or study.
mitted or as soon thereafter as possible.
t a.
^}.
ly
(..
s'
~: C u
i I
y O
^
9.3-2 4
_ _. _. _ _ _