ML19350C011
| ML19350C011 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 02/05/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19350C009 | List: |
| References | |
| NUDOCS 8103240674 | |
| Download: ML19350C011 (2) | |
See also: IR 05000424/1981001
Text
I
>y
.
T ! ug%
4
UNITED STATES
8
i
NUCLEAR REGULATORY COMMISSION
h
aE
REGION ll
o,
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
ETB - 51981
.....
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
Subject: Report Nos. 50-424/81-1 and 50-425/81-1
-This refers to the routine safety inspection conducted by J. R. Harris of this
office on January 6-9, 1981, of activities authorized by NRC Construction Permit
,
Nos. CPPR-108 and CPPR-109 for the Vogtle facility. Our preliminary findings
were discussed with K. M. Gillespie at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
(
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal' Regulations, a copy of this letter and the enclosed inspec-
tion report will beiplaced in the NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
such information' frora public disclosure. Any such application must include the
basis for claiming that the information is proprietary and the proprietary
information should be contained In a separate part .of the document. If we do
not hear from you in this regard within the specified period, the report will be
placed in the Public Document Room.
Should ya have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
C. E. Murphy, CETet
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
.810824O M
I'
-
+
,<
..
$
r
Georgia Power Company
-2-
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Peport Nos. 50-424/81-1
and-50-425/81-1
cc w/ encl:
K. M. Gillespie, Construction
Project Manager
' E. D. Groover, QA Site Supervisor
D. E. Dutton, Project General Manager
.
I '.
h
i~
E
t'
i
.
f_'
< -
_
d'
!.
t
.
-
4
s-
,
9