Forwards IE Insp Repts 50-424/81-01 & 50-425/81-01 on 810106-09 & Notice of Violation
ML19350C011
Person / Time
Site: Vogtle  
Issue date: 02/05/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19350C009 List:
References
NUDOCS 8103240674
Download: ML19350C011 (2)


See also: IR 05000424/1981001

Text

I

>y

.

T ! ug%

4

UNITED STATES

8

i

NUCLEAR REGULATORY COMMISSION

h

aE

REGION ll

o,

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

ETB - 51981

.....

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

Subject: Report Nos. 50-424/81-1 and 50-425/81-1

-This refers to the routine safety inspection conducted by J. R. Harris of this

office on January 6-9, 1981, of activities authorized by NRC Construction Permit

,

Nos. CPPR-108 and CPPR-109 for the Vogtle facility. Our preliminary findings

were discussed with K. M. Gillespie at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

(

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal' Regulations, a copy of this letter and the enclosed inspec-

tion report will beiplaced in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

such information' frora public disclosure. Any such application must include the

basis for claiming that the information is proprietary and the proprietary

information should be contained In a separate part .of the document. If we do

not hear from you in this regard within the specified period, the report will be

placed in the Public Document Room.

Should ya have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

C. E. Murphy, CETet

Reactor Construction and Engineering

Support Branch

Enclosure:

(See Page 2)

.810824O M

I'

-

+

,<

..

$

r

Georgia Power Company

-2-

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Peport Nos. 50-424/81-1

and-50-425/81-1

cc w/ encl:

K. M. Gillespie, Construction

Project Manager

' E. D. Groover, QA Site Supervisor

D. E. Dutton, Project General Manager

.

I '.

h

i~

E

t'

i

.

f_'

< -

_

d'

!.

t

.

-

4

s-

,

9